Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Ofgem compliance and enforcement cases, page 9 of 17

Cases 121 to 135 of 252, newest first, each in Ofgem's words. What this list is and is not, and how it was read, are on the first page of the list.

The status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.

Cases 121 to 135 of 252. Page 9 of 17. Every row is on one of these pages.

29 Oct 2019: Robin Hood Energy Limited: Final Order

Type as published: Enforcement case. Published 29 Oct 2019. Closed 29 Oct 2019. Status as published: Final Order closed.

On 1 October 2019, the Authority published its notice of proposal to issue a Final Order (FO) on Robin Hood Energy Ltd in accordance with Section 25(1) of the Electricity Act 1989 (EA89).

The particular behaviour of concern giving rise to the proposed FO was that Robin Hood Energy Ltd failed to meet its Renewables Obligations (RO), by failing to produce Renewables Obligation Certificates (ROC) to the Authority by 1 September 2019, or to make payments as an alternative by 31 August 2019, sufficient to discharge its RO. Robin Hood Energy Ltd subsequently failed to provide robust assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2019.

The Authority noted the representations received in the context of the consultation undertaken pursuant to section 26(1) of the EA89.

Robin Hood Energy Ltd made full payment of its RO for 2018-19, including all applicable interest, thus ensuring compliance with its RO for 2018-19.

Therefore, on 29 October 2019, the Authority made a decision not to make a FO.

The case on Ofgem's site

29 Oct 2019: TOTO Energy Limited: Final Order

Type as published: Enforcement case. Published 29 Oct 2019. Closed 29 Oct 2019. Status as published: Final Order closed.

On 1 October 2019, the Authority published its notice of proposal to issue a Final Order (FO) on TOTO Energy Ltd in accordance with Section 25(1) of the Electricity Act 1989 (EA89).

The particular behaviour of concern giving rise to the proposed FO was that TOTO Energy Ltd failed to meet its Renewables Obligations (RO), by failing to produce Renewables Obligation Certificates (ROC) to the Authority by 1 September 2019, or to make payments as an alternative by 31 August 2019, sufficient to discharge its RO. TOTO Energy Ltd subsequently failed to provide robust assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2019.

As TOTO Energy Ltd ceased trading on 23 October 2019, the Authority has taken the decision not to proceed with issuing a FO.

The Authority will engage with TOTO’s administrators and seek to recover as much money as possible through that process.

The case on Ofgem's site

5 Sep 2019: Finding that Engie Global Markets has breached Article 5 (prohibition on market manipulation) of Regulation (EU) No 1227/2011 of the European Parliament and of the Council of 25 October 2011 on wholesale energy market integrity and transparency (‘REMIT’)

Type as published: Enforcement case. Published 5 Sep 2019. Closed 5 Sep 2019. Status as published: Closed.

1. The Gas and Electricity Markets Authority (‘the Authority’) takes breaches of REMIT very seriously. It is important to ensure that energy consumers and market participants have confidence in the integrity of energy markets, that prices set on the wholesale energy markets reflect a fair and competitive interplay between supply and demand and that no profits can be drawn from market abuse.

2. The Authority is satisfied that Engie Global Markets of 1 Place Samuel de Champlain, 92400 Courbevoie, France, incorporated and registered in France with company number 437 982 937 (‘EGM’), has breached Article 5 of REMIT*. Article 5 provides that “any engagement in, or attempt to engage in, market manipulation on wholesale energy markets shall be prohibited”.

3. The Authority found that between the period 1 June 2016 and 31 August 2016 a trader working in the name, and on behalf, of EGM, contravened Article 5 on a number of occasions. EGM is liable for this breach.

4. The Authority found that EGM engaged in market manipulation in relation to the month ahead contract for the delivery of natural gas at the National Balancing Point on the Over-the-counter wholesale energy market. Transactions or orders were issued that gave, or were likely to give, false or misleading signals as to the supply of, or demand for, or price of wholesale energy products or that secured or were likely to secure the price of wholesale energy products at an artificial level.

5. Mindful of its principal objective, to protect consumers, its enforcement obligations under REMIT and the need to ensure the integrity of the electricity and gas wholesale markets, the Authority considered it appropriate to impose a level 3 sanction. This resulted in a financial penalty of £2,985,630.00 on EGM in respect of its contraventions of Article 5.

6. In determining the financial penalty, the Authority noted EGM’s cooperation with the investigation and considered the relevant aggravating and mitigating factors, including the measures that EGM put in place subsequent to the breach to prevent such a breach recurring.

7. Recognising that EGM has admitted that it has breached Article 5 of REMIT and has agreed to settle this matter during the early settlement window, the Authority discounted the penalty by 30% in accordance with its REMIT Penalties Statement published on 23 June 2015 . Accordingly, the Authority considered that it was appropriate to reduce the financial penalty due from EGM in respect of the contraventions of Article 5 to £2,128,236.00.

Dated: 5 September 2019

Gas and Electricity Markets Authority

* OJ No L 326, 08.12.2011, p1 .

The case on Ofgem's site

20 Aug 2019: Investigation into 9 August 2019 power outage

Type as published: Enforcement case. Published 20 Aug 2019. Closed 12 Jun 2020. Status as published: Closed.

The Gas and Electricity Markets Authority (“the Authority”) opened an investigation into the power outage of Friday 9 August 2019, to establish the circumstances and causes of the outage and the lessons that can be learned to improve the resilience of Great Britain’s energy network, and to investigate the compliance of the key licensed parties involved with their licence and code obligations. A report on Ofgem’s findings can be found below.

The investigation found that the combined loss of two large generators, as well as the smaller loss of generation at a local level, together triggered the subsequent disconnection, loss of power and disruption to more than one million consumers. Two large power stations, Hornsea One Ltd (co-owned by Orsted) and Little Barford (operated by RWE) did not remain connected after a lightning strike. They have agreed to make a voluntary payment of £4.5 million each into Ofgem’s redress fund.

Local network operators disconnected and reconnected consumers in response to the loss of power as expected. However, UK Power Networks began reconnecting customers without being asked to by the Electricity System Operator (ESO), which could have potentially jeopardised recovery of the system. This has no impact on 9 August and UK Power Networks has recognised this technical breach, taken swift action to prevent any future reoccurrence, and agreed to pay £1.5 million into Ofgem’s voluntary redress fund. All parties have fully cooperated with the regulator throughout its investigation.

In January Ofgem also closed its investigation into National Grid Electricity Transmission (NGET), and all five other DNO groups, namely Electricity North West Limited, Northern Powergrid, Scottish and Southern Energy, SP Energy Networks, and Western Power Distribution. We continued to review the ESO’s application of the security standards it is required to meet, alongside reviewing the standards themselves. Having explored this area, and noting that the standards themselves are to be amended, we have concluded that there is no merit in continuing the investigation. Therefore, we are closing this investigation on administrative priority grounds.

The incident has underlined the importance of the ESO adapting to the complex and changing world it operates in. Ofgem has already announced that it will be conducting a review into the structure and governance of the ESO, and the concerns raised in this investigation will inform this work. Ofgem has also made recommendations to ensure the UK continues to have one of the world’s most reliable electricity systems in the world, particularly as more small scale generation is connected to the system.

Alongside our report, the ESO’s reports submitted to Ofgem following the power cut on August 9 2019, can be found below.

The case on Ofgem's site

30 May 2019: Decision to impose financial penalties on Economy Energy, E (Gas and Electricity) and Dyball Associates following an investigation into an infringement of Chapter I of the Competition Act 1998

Type as published: Enforcement case. Published 30 May 2019.

Decision for (as Ofgem words it): Investigation into whether Economy Energy, E (Gas and Electricity) and Dyball Associates have infringed Chapter I of the Competition Act 1998 with respect to a suspected anti-competitive agreement

The Authority opened an investigation in September 2016 to establish if there had been an infringement of Chapter I of the Competition Act 1998 (“CA98”). The investigation concerned a suspected anti-competitive agreement between Economy Energy, E (Gas and Electricity) Ltd (“EGEL”) and Dyball Associates (“Dyball”) (“the Parties”).

On 29 May 2018 the Authority issued a statement of objections to the three Parties to the investigation.

The recipients of the statement of objections had the opportunity to respond to the allegations. The Authority considered the representations it received before coming to its final decision.

The Authority has found that Economy Energy, EGEL and Dyball entered into an agreement and/or concerted practice to share markets and/or allocate customers between Economy and EGEL in relation to the supply of gas and electricity to domestic customers in Great Britain. Under the infringement, Economy, EGEL and Dyball agreed that neither Economy and EGEL, nor their sales agents, would actively target customers already supplied with gas and/or electricity by the other, but each other’s existing customers would be allowed to switch between the two businesses if they pro-actively sought to do so. The infringement was supported by the Parties sharing commercially sensitive and strategic information, in the form of details of their current customers. The agreement and/or concerted practice existed from, at the latest, January 2016 until, at the earliest, the date of the Authority’s first investigatory steps in this investigation in September 2016. This agreement and/or concerted practice had as its object the prevention, restriction or distortion of competition.

Dyball was party to the infringement and intended to contribute, and did contribute, to the common objectives pursued by Economy and EGEL. Dyball did this by facilitating the sharing of markets and allocation of customers between Economy Energy and EGEL, through its own conduct, in designing, implementing and maintaining software systems that allowed the acquisition of certain customers to be blocked and customer lists to be shared; and by, itself, sharing customer lists and instructions to block particular customers from switching between Economy and EGEL. Dyball was aware of the actual conduct planned and/or put into effect by Economy and EGEL in pursuit of the objective of sharing markets and/or allocating customers. Therefore, Dyball participated as a facilitator in the infringement.

Based on the evidence available to the Authority, this conduct does not benefit from a relevant exemption under the CA98.

Section 36 of the CA98 provides that the Authority may impose a financial penalty on an undertaking which has intentionally or negligently committed an infringement of the Chapter I prohibition. The Authority has concurrent jurisdiction with the CMA to apply and enforce the Chapter I prohibition. This jurisdiction is not restricted to entities that hold a licence but extends to entities that participate in activities that are connected with or ancillary to licensable activities. The Authority has found that the Parties committed the Infringement intentionally or negligently and has decided to impose financial penalties of £650,000 on EGEL, £200,000 on Economy Energy Trading Limited and £20,000 on Dyball. The level of the penalty reflects the seriousness of this infringement, the need to ensure Economy Energy, EGEL and Dyball, and other undertakings, are deterred from engaging in this kind of collusive conduct, and the need for a penalty to be proportionate. In setting Economy Energy’s fine, the Authority has reflected the fact that Economy Energy is now in administration.

On 26 July 2019 the Authority published a non-confidential version of its decision document .

On 27 March 2018 a procedural complaint was made by Economy Energy regarding the investigation. A decision on that complaint was made in May 2018 .

The case on Ofgem's site

10 May 2019: Solarplicity Supply Ltd: provisional order (failure to make FIT payments)

Type as published: Enforcement case. Published 10 May 2019. Closed 23 Aug 2019. Status as published: Provisional Order closed.

On 17 August 2019 the Authority revoked Solarplicity Supply Limited’s licences to supply gas and electricity following its announcement that it would cease trading. As a result, the provisional order issued to Solarplicity Supply Limited on 10 May 2019 is no longer in effect.

On 8 August the Authority decided to confirm the provisional order with modifications, following the consultation period. The consultation ended on 1 August 2019.

The reports provided by Solarplicity to Ofgem showed that Solarplicity didn’t make payments to FIT Generators when they were due. In addition, Ofgem considered the three representations received from generators during the consultation period. The Authority was satisfied that Solarplicity was contravening (and is likely to further contravene) Standard Licence Condition (SLC) 33.2 and in particular paragraph 3.2.5 of Part 1 of Schedule A relating to Feed-In Tariff (FIT) payments.

Ofgem issued the provisional order on 10 May. This provisional order required that Solarplicity makes all outstanding FIT Payments due to FIT Generators when those FIT Payments become due. Solarplicity was also required to provide reports to the Authority evidencing that the FIT Payments due to FIT Generators have been made.

On 10 July the Authority published a notice of its intention to confirm and modify the provisional order (PO) in relation to Solarplicity’s FIT payments. The consultation on this proposal closed on 1 August 2019.

The Authority understood that Solarplicity’s financial position appeared no better in July than when the provisional order was issued, and therefore considered that Solarplicity would fail to make FIT payments without the provisional order being confirmed.

Solarplicity has agreed payment plans with FIT Generators to make all outstanding payments for quarter 3 of FIT year 9 (1 October 2018 – 31 December 2018). In early July 2019, we received communications from several FIT Generators explaining that they had not received the FIT Payments due to them at the end of June in line with their agreed payment plans with Solarplicity, contravening the PO.

On 10 May 2019, the Authority issued a provisional order to Solarplicity in accordance with section 25 (2) of the Electricity Act. The Authority had been in discussions with Solarplicity regarding its compliance with its obligations under 3.2.5 of Part 1 of Schedule A of Standard Licence Condition (SLC) 33 relating to FIT.

In February 2019, we received communications from several FIT Generators which claimed they had not received the FIT Payments due to them for Quarter 3 of FIT Year 9 (1 October 2018 – 31 December 2018). We subsequently found that many payments due to FIT Generators by 21 February 2019 had not been made. Solarplicity provided a revised date for payment of 5 March 2019, but in most cases this revised payment date was not met.

This provisional order requires that Solarplicity makes all outstanding FIT Payments due to FIT Generators by 16 May 2019, and that it makes all future FIT Payments that become due to FIT Generators when those FIT Payments become due. When making FIT payments, Solarplicity must not give preference to any FIT Generator connected in any way to Solarplicity by virtue of its ownership (being part of Solarplicity’s group of companies) or directorship. Solarplicity must also provide reports to the Authority evidencing that the FIT Payments due to FIT Generators have been made.

Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

For information relating to this provisional order, please see documents below.

The case on Ofgem's site

2 May 2019: Investigation into whether EPEX Spot SE has infringed the requirements of Chapter II of the Competition Act 1998 and/or Article 102 Treaty on the Functioning of the European Union in respect of wholesale trading activities

Type as published: Enforcement case. Published 2 May 2019. Closed 18 Jun 2019. Status as published: Closed.

Decision (as Ofgem words it): Notice of Decision to accept binding commitments offered by EPEX Spot SE and EEX closing the investigation into a possible infringement of Chapter II of the Competition Act 1998 in relation to electricity wholesale trading activities

In December 2018 we opened an investigation into whether there had been an infringement of Chapter II of the Competition Act 1998 and / or Article 102 of the Treaty on the Functioning of the European Union, concerning a potential abuse of a dominant position in relation to wholesale trading activities.

Our investigation examined whether EPEX Spot SE, a power exchange operating in Great Britain, had abused or was abusing a dominant position in relation to access to cross-border intraday electricity trading platforms and related services between GB and Ireland.

On 18 June 2019, the Authority decided to accept commitments from EPEX Spot SE and EEX. Formal acceptance of these commitments by the Authority resulted in our investigation being discontinued without any decision being made as to whether or not the Competition Act 1998 and/or the Treaty on the Functioning of the European Union had been infringed.

The case on Ofgem's site

8 Mar 2019: Avro: Final Order

Type as published: Enforcement case. Published 8 Mar 2019. Closed 2 Aug 2019. Status as published: Final Order closed.

On 8 March 2019 the Authority published a notice of proposal to issue a final order on Avro Energy Limited (Avro) in accordance with Section 26 (1) and (2) of the Electricity Act 1989 and section 29 (1) and (2) of the Gas Act 1986.

The Authority had been in discussions with Avro regarding its requirement to become a DCC User (as defined in standard licence conditions 42.11 and 48.11 of the gas and electricity supply licences respectively).

Standard licence conditions 42.8 of the gas supply licence and 48.8 of the electricity supply licence require licensees to become DCC Users by 25 November 2017.

The particular behaviour of concern giving rise to the proposal to make a final order was that Avro failed to become a DCC User by the deadline and remained non-compliant. Had the non-compliance been allowed to continue, there was a likelihood of increasing numbers of customers with smart meters suffering harm by either switching to Avro and losing their smart functionality or, for existing customers, remaining without smart functionality longer than was necessary.

Representations or objections with respect to the proposed final order were invited to be made to the Authority by 29 March 2019.

Avro made two written representations. In the first, Avro said it had not sought to avoid compliance and argued that the final order was not warranted, because there were mitigating circumstances. Avro offered to voluntarily impose the sales ban on itself if it did not achieve DCC User status before 26 May 2019. In the second, made after it became aware that the date on which first generation SMETS1 meters could be enrolled into the DCC had recently been put back, Avro argued that, because of this delay, the date on which the proposed sales ban in the final order should begin should also be put back.

The Authority considered Avro’s representations carefully but concluded that the final order, including a sales ban from 26 May 2019, was justified. The Authority noted that one of its principal reasons for seeking the final order was its lack of confidence in Avro’s willingness to engage until the matter was escalated. Based on Avro’s conduct to date, the Authority was not convinced that it could rely on an undertaking volunteered by Avro to take action as required without the final order being in place. The Authority noted that while one reason for commencing the sales ban on 26 May - the original date identified for SMETS1 meter enrolment into the DCC - was no longer relevant, other reasons were still relevant. These reasons included the need to protect the growing numbers of second generation SMETS2 meter customers who may switch to Avro and suffer immediate harm, and to retain the incentive for Avro to comply as quickly as possible and by no later than 25 July 2019.

Therefore, on the 3 April 2019, the Authority made the final order, pursuant to Section 26 (1) and (2) of the Electricity Act 1989 and section 29 (1) and (2) of the Gas Act 1986, requiring Avro:

• to become a DCC User by no later than 25 July 2019

• to notify the Authority within 24 hours of completion of each milestone, including completion of the final milestone, as set out in its DCC User Implementation Plan, and

• not to acquire any new customers or add any customer accounts by upgrading to dual fuel from 26 May 2019 until Avro can demonstrate that it is a DCC User.

On 14 June 2019, the Authority received satisfactory evidence from The Smart Energy Code Administrator and Secretariat (SECAS) that Avro had completed all the required steps to become a DCC user and had therefore met the requirements set out in the Final Order for it to be able to acquire new customers and add new customer accounts by upgrading to dual fuel.

On 2 July 2019, the Authority published its notice of proprosal to revoke the final order imposed on Avro dated 3 April 2019. The Authority was satisfied that the order should be revoked because Avro became a DCC User on 14 June 2019 and was therefore compliant with standard licence conditions 42.8 of the gas supply licence and 48.8 of the electricity supply licence.

The Authority gave this notice in accordance with section 26(6) of the Electricity Act 1989 and section 29(5) of the Gas Act 1986 and invited any representations or objections with respect to the proposed revocation by 30 July 2019. No representations or objections were received in response to the proposal to revoke the Final Order.

On 2 August 2019, The Authority issued a Revocation Order under section 25(7)(c) of the Electricity Act 1989 and section 28(7)(c) of the Gas Act 1986. The Authority decided that the Final Order was no longer required for the purpose of ensuring Avro’s compliance with standard licence conditions 42.8 of the gas supply licence and 48.8 of the electricity supply licence. Avro became a DCC user on 14 June 2019 and therefore has met the requirements of the Final Order. The Final Order is no longer in place.

The case on Ofgem's site

22 Feb 2019: Solarplicity Supply Ltd: Provisional Order

Type as published: Enforcement case. Published 22 Feb 2019. Closed 23 May 2019. Status as published: Provisional Order closed.

On 22 May 2019 the Gas and Electricity Markets Authority ("the Authority") made the decision not to confirm the provisional order issued to Solarplicity Supply Limited ("Solarplicity") on 22 February 2019.

The Authority issued a Notice of Proposal to confirm the provisional order in a modified form on 17 April 2019. The Notice of Proposal invited representations or objections in relation to the proposed confirmation by 13 May 2019. The Authority received four representations. The provisional order required Solarplicity to submit information and documentation to the Authority in respect of its performance against the relevant conditions and requirements covered by the order. In making its decision, the Authority considered this information and the representations it received.

In this case, the Authority considered it requisite to issue the provisional order to bring Solarplicity into compliance with its obligations so as to mitigate and prevent further harm to its customers. Following a review of the representations and the information and documentation submitted by Solarplicity, the Authority notes that compliance with the obligations set out in the provisional order has either been achieved or, in one aspect, is in progress. Solarplicity’s performance has improved since the issue of the provisional order and it has agreed to a range of ongoing measures which will build on and sustain the improvements shown in respect of the relevant conditions set out in the provisional order.

The Authority is now satisfied that Solarplicity is no longer contravening or likely to contravene the following relevant conditions:

Standard Licence Condition of the gas and electricity supply licences ("SLC") 0.3 (c)(i): to make it easy for a Domestic Customer to contact the licensee;

SLC 0.3 (c)(ii): to act promptly and courteously to put things right when the licensee or any Representative makes a mistake;

SLC 0.3 (c)(iii): to ensure that customer service arrangements and processes are complete, thorough, fit for purpose and transparent;

SLC 14A.1:to take all reasonable steps to complete a Supplier Transfer within 21 days of the Relevant Date;

SLC 14A.7: to take all reasonable steps to improve the systems and processes governing the Supplier Transfer process; and

The Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008 ("CHSR"):

Regulation 3: Regulated providers’ complaints handling procedure;

Regulation 4: Recording complaints upon receipt;

Regulation 5: Maintaining appropriate records of the handling of complaints;

Regulation 6: Signposting consumers to the redress scheme if complaints cannot be resolved; and

Regulation 7: Receiving, handling and processing consumer complaints in an efficient and timely manner; and allocating and maintaining sufficient level of resources.

The Authority is however satisfied that, as at 22 May 2019, Solarplicity is contravening SLC 27.5. SLC 27.5 requires licensees to offer the services set out at SLC 27.6 to customers who have or will have difficulty paying. One of the services that Solarplicity is required to offer its customers in payment difficulty is the facility to make payment by deduction at source from social security benefits received by that customer. As at 22 May 2019, Solarplicity does not offer this service and is therefore contravening SLC 27.5.

However, Solarplicity provided a letter of undertaking to the Authority dated 21 May 2019 ("the Undertaking"). In the Undertaking, Solarplicity has agreed to take all steps necessary to comply with SLC 27.5 and anticipates being able to offer the required service by 23 May 2019. Solarplicity has agreed to report to the Authority and notify its customers when the service is available, or provide a progress report on 28 May 2019 (whichever is earlier). In terms of section 25(5A) of the Electricity Act 1989 and 28(5A) of the Gas Act 1986, the Authority is not required to confirm a provisional order if it is satisfied that the regulated person has agreed to take and is taking all appropriate steps to facilitate compliance with a relevant condition. Given the terms of the Undertaking, the Authority is satisfied that Solarplicity is doing so.

In its Undertaking Solarplicity also agrees to:

(with regard to vulnerable customers – SLC 0.3d) - complete the roll-out of its new Vulnerable Customers Policy. Solarplicity anticipates that this will be completed by 7 June 2019 and it will report to the Authority in this regard on 10 June 2019. Solarplicity will also take other steps to improve its process for identifying and providing services to Domestic Customers in a Vulnerable Situation and will keep the Authority updated in that regard. Solarplicity has also agreed to provide the information required by paragraph 8.1 of the provisional order on a weekly basis for the next two months and thereafter on a monthly basis or on any other reporting frequency agreed with the Authority;

(with regard to customers in payment difficulty – SLC 27.5) - update and improve the wording of the debt letters that it sends to customers and keep the Authority updated in that regard and also to provide the information required by paragraph 9.2 of the Provisional Order;

(with regard to making it easy for customers to contact it – 0.3c) – provide the information required by paragraph 6.5 of the provisional order on a weekly basis for the next two months and thereafter on a monthly basis (or on any alternative basis deemed appropriate by the Authority thereafter);

(with regard to customer complaints handling – regulations 3 to 7 of the CHSR) – provide the information required by paragraph 7.4 of the provisional order on a weekly basis for the next two months and thereafter on a monthly basis (or on any alternative basis deemed appropriate by the Authority thereafter);

Not to take on any new customers from the general public until 5 August 2019 and to take on a maximum of 200 customers per week under Community Energy Schemes and to provide reports to the Authority with regard to the number of customers that have transferred to it under these schemes;

Not to increase the direct debits of vulnerable customers or use debt collection agents to pursue those customers until it has taken the steps it has agreed to with regard to vulnerable customers or if agreed to by the Authority.

Further details can be found in Notice of Decision not to Confirm the Provisional Order .

On 18 April 2019, the Authority published its notice of proposal to confirm , with modifications, the provisional order dated 22 February 2019, issued to Solarplicity. The Authority gave notice that in accordance with section 26(1) of the Electricity Act and section 29(1) of the Gas Act:

The Standard Conditions of the Gas and Electricity Supply Licences (collectively referred to as the "SLCs") 0.3c(i), (ii) and (iii), 0.3d(i) and (ii), 14.A1, 14.A7 and 27.5 and regulations 3, 4, 5, 6 and 7 of the Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008 (‘CHSR’) are the relevant conditions and requirements for the purpose of the provisional order with modifications;

The basis on which the Authority was satisfied that Solarplicity was contravening or was likely to contravene these conditions and requirements and on which it considered that it is requisite that the provisional order was confirmed as modified was set out in the notice of proposal to confirm the provisional order;

Any representations or objections with respect to the proposed confirmation were to be made to the Authority by 13 May 2019;

The Authority would consider these representations and then make a final decision on whether to confirm the provisional order prior to 22 May 2019 (the date on which the provisional order will lapse if not confirmed).

On 22 February 2019, the Authority issued a provisional order to Solarplicity in accordance with Section 25(2) of the Electricity Act 1989 and Section 28(2) of the Gas Act 1986. The Authority had been in discussions with Solarplicity regarding compliance with its obligations under:

SLCs 0.3c(i), 0.3c(ii) and 0.3c(iii), 0.3d(i) and 0.3d(ii), 14A.1, 14A.7, SLC 22C.3, 22C.4, 22C.6, 22C.7 and 27.5.

Regulations 3, 4, 5, 6 and 7 of the CHSR.

The particular behaviours of concern giving rise to the making of the provisional order were that Solarplicity’s Domestic Customers were or were likely to be at risk of:

not being able to contact Solarplicity via some of its customer contact methods, where customer service arrangements were not fit for purpose;

not being identified as a vulnerable customer and added to the Priority Services Register (PSR);

not receiving help or support in relation to ability to pay, e.g. not offering payment plans, not facilitating payment by means of deducting it at source from a social security benefit received by the customer or installation of a Prepayment Meter (PPM), where appropriate;

not receiving a notice of a contract renewal once their existing contract has come to an end ("Contract Renewals");

not having their complaints correctly identified, logged or signposted.

Based on the information received by the Authority, it appeared to the Authority that Solarplicity was contravening or was likely to contravene SLCs 0.3c(i), 0.3c(ii) and 0.3c(iii), 0.3d(i) and 0.3d(ii), 14A.1, 14A.7, SLC 22C.3, 22C.4, 22C.6, 22C.7 and 27.5 and regulations 3, 4, 5 and 6 of the CHSR.

Further information regarding provisional orders is contained within our Enforcement Guidelines .

The case on Ofgem's site

12 Feb 2019: URE: Final Order

Type as published: Enforcement case. Published 12 Feb 2019. Closed 14 Sep 2019. Status as published: Final Order closed.

On 13 February 2019, the Authority published its notice of proposal to issue a final order on URE Energy Ltd (URE) in accordance with Section 25(1) of the Electricity Act 1989 (EA89).

The Authority had been in discussions with URE regarding compliance with its obligations under Article 7 of the Renewables Obligation Order 2015.

The particular behaviour of concern giving rise to the proposed final order was that URE failed to meet its Renewables Obligations (RO) by failing to produce Renewables Obligation Certificates (ROC) to the Authority by 1 September 2018, or to make payments as an alternative, sufficient to discharge its RO. The draft final order requires URE to make a payment to the Authority in full settlement of its RO for the obligation period of 1 April 2017 to 31 March 2018, including interest, in the sum of £209,013.78 by no later than 31 March 2019.

Representations or objections with respect to the proposed final order were invited to be made to the Authority by 6 March 2019.

Representations were received from SSE and these support the proposal. In summary, SSE welcomed the proposed measures being taken by the Authority in order to protect the integrity of the RO scheme and shared the Authority’s concern that compliant suppliers are penalised by shortfalls arising from non-compliant suppliers, such as URE.

The Authority noted the representations received from SSE in the context of the consultation undertaken pursuant to section 26(1) of the EA89. It considered these representations carefully and concluded that no modifications were required to its findings nor to the proposed final order.

Therefore, on the 8 March 2019, the Authority made the final order , pursuant to section 25(1) of the EA89, requiring URE to:

1. Make a payment to the Authority in full settlement of its RO, for the obligation period of 1 April 2017 to 31 March 2018, including interest, in the sum of £209,013.78 by no later than 5pm on 31 March 2019; and

[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]

The Authority set out its reasons for making the final order in a Notice of reasons pursuant to Section 49A(1)(f) and 49A(2) of the EA89 dated 8 March 2019.

URE failed to make the required payment by the deadline set and has not made any relevant payment subsequently.

On 1 May 2019 the Authority issued URE with a Notice of failure to comply with a Final Order within the meaning of section 25 of the Electricity Act 1989. The notice provided URE with written notice, pursuant to Schedule 2(1)(c)(i) of the Electricity Supply Licence, of URE’s failure to comply with the Final Order dated 8 March 2019, namely a failure to pay to the Authority the sum of £209,013.78.

The notice further explained that if this failure was not rectified to the satisfaction of the Authority within three months of URE receiving the notice, the Authority may at any time revoke URE’s Electricity Supply Licence subject to giving no less than 30 days’ notice.

URE did not rectify its failure to comply with the notice within three months. Therefore, the Authority decided that URE’s Electricity Supply Licence should be revoked with 30 days’ notice, in accordance with paragraph 1(c)(i) of Schedule 2 of the Licence.

The grounds for revocation were that the Licensee failed to comply with the final order of 8th March 2019, namely a failure to pay to the Authority the sum of £209,013.78.

The licence was revoked on 14 September 2019.

Further details can be found in the letter to URE and the notice of revocation dated 13 August 2019.

The case on Ofgem's site

17 Jan 2019: E (Gas and Electricity) Ltd: provisional order

Type as published: Enforcement case. Published 17 Jan 2019. Closed 25 Feb 2019. Status as published: Provisional Order closed.

On 16 January 2019, the Gas and Electricity Markets Authority (‘the Authority’) issued a provisional order to E (Gas and Electricity) Limited (‘EGEL’) in accordance with Section 25(2) of the Electricity Act 1989 and Section 28(2) of the Gas Act 1986.

The provisional order related to behaviour of EGEL that appeared to the Authority to be contraventions or likely contraventions of standard conditions of the Gas and Electricity Supply Licences (collectively referred to as the ‘SLCs’) 14A and 0.3 (a). In particular, these apparent and / or likely contraventions related to EGEL’s conduct in completing the transfer of former customers of Economy Energy Trading Limited, which had ceased trading, to EGEL, after OVO Energy Limited was appointed by the Authority to take on the supply of electricity and gas to those customers.

The Authority made the provisional order to prevent further harm to and uncertainty experienced by former customers of Economy Energy, who were in the process of being fully set up with Ovo Energy.

Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

On the 21 January 2019, the Authority published a Notice of its reasons for its decision to issue a provisional order on 16 January 2019.

On 25 February 2019, the Authority made a Revocation Order under section 25(7)(c) of the Electricity Act 1989 and section 28(7)(c) of the Gas Act 1986. The Authority decided that the terms of the provisional order were no longer requisite for the purpose of ensuring EGEL’s compliance with SLC 14A and SLC 0.3a, having established that the transfers of former customers of Economy Energy to EGEL were properly cancelled and were not completed.

The provisional order is no longer in place.

The case on Ofgem's site

4 Jan 2019: Economy Energy: provisional order

Type as published: Enforcement case. Published 4 Jan 2019. Closed 25 Jan 2019. Status as published: Provisional Order closed.

Economy Energy ceased trading on 8 January 2019 and its licences to supply gas and electricity were revoked as of 12 January 2019. As a result, the provisions of the provisional order, issued to Economy Energy on 4 January 2019, are no longer in effect.

Economy Energy’s customers have been transferred to Ovo under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Economy Energy customers: Your questions on new supplier Ovo Energy .

Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

For information relating to this Provisional Order, please see documents below.

The case on Ofgem's site

21 Nov 2018: Investigation into Economy Energy’s compliance with its Renewables Obligations

Type as published: Enforcement case. Published 21 Nov 2018. Closed 25 Jan 2019. Status as published: Closed.

Decision (as Ofgem words it): Decision to close the investigation into Economy Energy’s compliance with its Renewables Obligations

Economy Energy ceased trading on 8 January 2019 and its licences to supply gas and electricity were revoked as of 12 January 2019.

As a result, the investigation into Economy Energy and its compliance with its obligations under its Renewables Obligations has closed.

We were investigating whether Economy Energy complied with Article 68 of the Renewables Obligation Order 2015 (as amended) and Article 44 of the Renewables Obligation Order (Scotland) 2009 for the 2017/18 scheme year. Article 68 of the Renewables Obligation Order 2015 (as amended) and Article 44 of the Renewables Obligation Order (Scotland) 2009 mean that if a supplier has not paid the amount it owes (plus all interest) by the end of the late payment period (31 October) it will be treated as not having discharged its Renewables Obligations.

Economy Energy’s customers have been transferred to Ovo under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Economy Energy customers: Your questions on new supplier Ovo Energy .

The case on Ofgem's site

21 Nov 2018: Investigation into Spark Energy’s compliance with its Renewables Obligations

Type as published: Enforcement case. Published 21 Nov 2018. Closed 5 Dec 2018. Status as published: Closed.

Decision (as Ofgem words it): Decision to close the investigation into Spark Energy’s compliance with its Renewables Obligations

As a consequence of Spark Energy Supply Limited ("Spark") being unable to pay its debts, the Authority has decided that, in order to protect the interests of consumers, it is appropriate to revoke its licences.

Spark’s licences to supply gas and electricity were revoked as of 28 November 2018.

As a result, the investigation into whether Spark Energy Supply Ltd complied with Article 68 of the Renewables Obligation Order 2015 (as amended) and Article 44 of the Renewables Obligation Order (Scotland) 2009 for the 2017/18 scheme year has closed.

Article 68 of the Renewables Obligation Order 2015 (as amended) and Article 44 of the Renewables Obligation Order (Scotland) 2009 means that if a supplier has not paid the amount it owes (plus all interest) by the end of the late payment period (31 October) it will be treated as not having discharged its Renewables Obligations.

Spark’s customers have been transferred to Ovo under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Spark Energy customers: Your questions on new supplier Ovo Energy .

The case on Ofgem's site

26 Sep 2018: npower: provisional order

Type as published: Enforcement case. Published 26 Sep 2018. Closed 9 May 2019. Status as published: Provisional Order closed.

No representations or objections were received in response to the proposal to revoke the confirmed provisional Order.

On 29 April 2019, The Gas and Electricity Markets Authority ('the Authority') confirmed a Revocation Order under section 25(7)(c) of the Electricity Act 1989 and section 28(7)(c) of the Gas Act 1986. The Authority decided that the terms of the provisional order were no longer requisite for the purpose of ensuring npower Direct Limited, npower Limited, npower Northern Limited, npower Northern Supply Limited, npower Yorkshire Limited, npower Yorkshire Supply Limited’s (together, ‘npower’) compliance with SLC 32A, having established that npower has now complied with the direction requiring their participation in the Active Choice Collective Switch Autumn Trial ("the trial").

The provisional order is no longer in place.

On 13 March 2019, the Authority decided to publish its notice of proposal to revoke the confirmed provisional order imposed on npower dated 26 November 2018. The Authority was satisfied that the terms of the provisional order were no longer requisite for the purpose of ensuring npower’s compliance with SLC 32A, having established that npower had complied with the direction requiring its participation in the Active Choice Collective Switch Autumn Trial ("the trial").

The Authority gave this notice in accordance with section 26(6) of the Electricity Act and section 29(5) of the Gas Act.

Any representations or objections with respect to the proposed confirmation were to be made to the Authority by 15 April 2019.

On 21 December 2018, the High Court issued its decision to dismiss npower’s claim for a judicial review on our decision that npower should work with us on our ongoing trial of simplified collective switching. The High Court judgment can be found below .

On 26 November 2018, the Authority decided to confirm, with the modifications set out in the notice of 31 October 2018, the provisional order dated 24 September 2018 (now known as the ‘ confirmed provisional order ’). In confirming the provisional order, the Authority was satisfied that npower was contravening or was likely to contravene the requirements of SLC 32A and the provisions made by the order were still requisite for the purpose of ensuring npower complied with this condition. The Authority’s reasons for making the decision to confirm the provisional order are set out in the document below.

On 31 October 2018, the Authority published its notice of proposal to confirm, with modifications, the provisional order dated 24 September 2018 imposed on npower following its provisional decision that npower is contravening or is likely to contravene the requirements of SLC 32A. The Authority proposed to confirm the order in the Notice of proposal to confirm the provisional order .

The Authority gave notice that in accordance with section 26(1) of the Electricity Act and section 29(1) of the Gas Act:

SLC 32A is the relevant condition and requirement for the purpose of the provisional order;

The acts or omissions which, in the Authority’s opinion, constitute or would constitute contraventions of those conditions and requirements, and other factors which in the Authority’s opinion justify the confirmation of the provisional order are those set out in the Notice of proposal to confirm the provisional order.

Any representations or objections with respect to the proposed confirmation were to be made to the Authority by 21 November 2018. One representation was received and was duly considered.

On 24 September 2018, The Authority issued a provisional order to npower Direct Limited, npower Limited, npower Northern Limited, npower Northern Supply Limited, npower Yorkshire Limited, npower Yorkshire Supply Limited (together, ‘npower’), in accordance with Section 25(2) of the Electricity Act 1989 and Section 28(2) of the Gas Act 1986. The Authority had been in discussions with npower regarding compliance with its obligations under:

Standard condition 32A of the gas and electricity supply licences (referred to as ‘SLC’ 32A).

The particular behaviour of concern giving rise to the provisional order was that npower had refused to comply with the direction requiring its participation in the Active Choice Collective Switch Autumn Trial. The trial is a flagship Ofgem policy in response to the recommendations made by the CMA following the Energy Market Investigation.

The case on Ofgem's site