Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Ofgem compliance and enforcement cases, page 4 of 17

Cases 46 to 60 of 252, newest first, each in Ofgem's words. What this list is and is not, and how it was read, are on the first page of the list.

The status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.

Cases 46 to 60 of 252. Page 4 of 17. Every row is on one of these pages.

2 Feb 2023: British Gas: prepayment meter installations

Type as published: Enforcement case. Published 2 Feb 2023. Status as published: Closed.

British Gas has agreed settlement in our investigation of unfair treatment of PPM customers.

The case on Ofgem's site

2 Feb 2023: E.ON Next Energy Limited: Provisional Order

Type as published: Enforcement case. Published 2 Feb 2023. Status as published: Provisional Order closed.

The Authority has engaged with E.ON throughout the period of the Provisional Order being in place. Having assessed the information received, the Authority is satisfied that E.ON has been taking steps which we consider to be appropriate to secure compliance with SLC 0.3(c)(i) and SLC 0.3(c)(iii) (in respect of E.ON’s customer service provision).

Therefore, the Authority has decided not to confirm the Provisional Order. The Provisional Order has lapsed and ceased to have effect on 2 May 2023.

On 2 February 2023, the Gas and Electricity Authority (“the Authority”) issued a Provisional Order with respect to contraventions by E.ON Next Energy Limited (“E.ON”), in accordance with section 25(2) of the Electricity Act 1989 and 28(2) of the Gas Act 1986. It appears to the Authority that E.ON is contravening or is likely to contravene Standard Licence Conditions (“SLCs”) 0.3(c)(i) and (iii) of its Gas and Electricity Supply Licences.

Ofgem’s Market Compliance Review (“MCR”) of the quality of all energy suppliers’ customer service over the period of October – December 2022, found that there were significant failings in E.ON’s customer service performance during that period, notably, excessive call waiting times and very high abandoned call rates. Ofgem’s retail compliance team engaged with E.ON to discuss its concerns and received additional information on 27 January 2023. Despite this, there are still substantial concerns about E.ON customer service arrangements, leading to the Provisional Order.

The Provisional Order states the action that E.ON is required to take to make it easy for customers to contact them and to ensure that customer service arrangements and processes are complete, thorough, fit for purpose and transparent. These actions include making significant and sustained improvements in the rate of answering calls from consumers, and average call waiting times.

The Authority considers that it is essential to uphold compliance with these conditions as failure to do so risks significant consumer harm. The current market conditions are challenging for consumers, with many facing financial difficulties attributed not just to rising energy costs, but wider issues related to the rising cost of living. As such, it is likely that customers will wish to contact their supplier urgently for various reasons including billing, payment options and payment difficulties, energy efficiency advice and debt. It is therefore imperative all licensees, including EON, have suitable customer service arrangements to meet the needs of their customers.

Further details are contained in the Provisional Order and Notice of Reasons published on along with this Order.

The case on Ofgem's site

13 Jan 2023: Ofgem closes its compliance engagement with Drax Pumped Storage Limited in relation to a breach of the Transmission Constraint Licence Condition (TCLC)

Type as published: Compliance case. Published 13 Jan 2023. Status as published: Closed.

This compliance engagement related to excessive payments Drax secured from National Grid Electricity System Operator (‘NGESO’) in the Balancing Mechanism (‘BM’). Ofgem considers that Drax obtained the payments by submitting excessively expensive bid prices to curtail its generation during times of transmission constraint, with the effect of increasing balancing costs which are ultimately borne by consumers. The Transmission Constraint Licence Condition (TCLC) prohibits such behaviour. Drax has admitted to inadvertently breaching the TCLC, and has cooperated fully with the Authority. The Authority expects licensees to be fully aware of their legal obligations (including compliance with the TCLC) and have adequate procedures in place to prevent breaches from occurring. As such Drax has informed Ofgem that it has implemented a revised bid pricing methodology [1] designed to ensure that any such breaches do not happen again, and agreed to pay £6.12 million to the Voluntary Redress Fund.

Between 1 January 2019 and 31 July 2022, Ofgem considers that Drax submitted excessively expensive bid prices in the BM to curtail generation at its Cruachan pumped storage power station in Argyll and Bute, Scotland. Bid prices are the amount in pounds per megawatt hour that a generator is willing to pay (if positive) or be paid (if negative) by NGESO in the BM to turn down its generation when needed to help balance the transmission system. Cruachan regularly operates in periods in which a transmission constraint occurs due to its position behind a number of key thermal constraint boundaries in Scotland and Northern England. This is particularly the case in periods of high wind generation in Scotland.

Ofgem considers that during the period in question Drax regularly had system flagged bids accepted for Cruachan at negative prices in transmission constraint periods [2], often at a price of around -£60/MWh. In Ofgem’s assessment, the negative bids submitted by Drax were excessively expensive because they did not adequately reflect the necessary costs incurred and benefits accrued by Drax in curtailing its generation at Cruachan. These prices were noticeably lower than the bids historically submitted for Cruachan prior to 1 January 2019, when Drax took ownership of the power station.

The TCLC was first implemented by Ofgem in 2012 in response to increasingly high transmission constraint costs. Following consultation, in May 2017 Ofgem decided to make the TCLC a standard condition of the generation licence, implementing it as Standard Licence Condition 20A.

The objective of the TCLC is to protect against the exploitation of market power by generators operating behind transmission constraints. Transmission constraints routinely lead to electricity generators in particular areas or in some instances with particular characteristics, holding a position of market power in a given settlement period, with the ESO having limited options to manage the constraint other than reaching an agreement with the generator to curtail their planned output. If generators were free to take advantage of this market power in their agreements with the ESO, this would increase balancing costs (which are ultimately passed onto consumers) and create harmful incentives regards future generation investment.

The TCLC requires that generators must not obtain an excessive benefit from electricity generation in relation to a Transmission Constraint Period. In practice, this means that – where a transmission constraint occurs, and where the generator intends to export power (thereby making that constraint worse) - generators must not submit bid prices in the Balancing Mechanism at a level which would result in them obtaining an excessive benefit, were that bid accepted by the NGESO. A Transmission Constraint Period is any period when there is any limit on the ability of the transmission system, or any part of it, to transmit power from the location it is supplied to the location where demand is situated.

In Ofgem’s assessment Drax received excessive payments from NGESO, in relation to numerous Transmission Constraint Periods between 1 January 2019 and 31 July 2022. Consequently, Ofgem considers that Drax has breached the TCLC.

Drax has co-operated fully with the Authority and has admitted that the breaches occurred, but maintains that they were inadvertent and were not motivated by the intention to obtain an excessive benefit. Following compliance engagement with Ofgem, Drax has agreed to pay £6.12 million to the energy redress fund. Drax has also informed Ofgem that it has implemented a revised bid price methodology designed to properly reflect the costs and benefits of Cruachan being bid down, and to prevent future breaches.

Taking into account Drax’s admission of the breaches, the steps it has taken to avoid future reoccurrence and the redress it has agreed to pay, Ofgem has now closed this matter without the need for a full investigation. This compliance engagement sends a strong signal to all generators that they cannot obtain or seek to obtain excessive payments in the BM during times of transmission constraint and when this happens Ofgem is willing to take a strong position to tackle such behaviour.

[1] Drax has explained the purpose of the revised methodology to Ofgem. For the avoidance of doubt, Ofgem does not approve generators’ bid price methodologies. Regardless of the methodology used, generators have the ultimate responsibility to ensure that bid prices are not excessive.

[2] Transmission Constraint and Transmission Constraint Period are defined in SLC 20A(9) of the Generation Licence.

The case on Ofgem's site

29 Nov 2022: Delta Gas and Power Ltd: Provisional Order - Y13 Q2 FIT Levelisation Payment

Type as published: Enforcement case. Published 29 Nov 2022. Status as published: Provisional Order closed.

On 29 November 2022, the Authority issued a provisional order to Delta Gas and Power Ltd (“Delta”) in accordance with section 25(2) of the Electricity Act 1989.

The Authority considers that Delta is contravening the Standard Licence Condition 33 (SLC 33). Delta is required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of SLC 33 and the Feed-In Tariffs Order 2012.

Delta failed to make its FIT Year 13 Quarter 2 Levelisation payment of £56,707.09 by the deadline of 10 November 2022.

The provisional order requires Delta to pay the outstanding amount forthwith.

Provisional orders are issued in certain circumstances in accordance with the Electricity Act 1989 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

On 13 December 2022, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989. The Authority decided that the terms of the provisional order were no longer requisite for the purpose of ensuring Delta’s compliance with its FIT Y13 Q2 levelisation obligation, as Delta paid the outstanding sum in full on 9 December 2022. The provisional order is no longer in place.

The case on Ofgem's site

29 Nov 2022: Delta Gas and Power Ltd: Revocation of Provisional Order for compliance with Requests for Information

Type as published: Enforcement case. Published 29 Nov 2022. Status as published: Provisional Order closed.

On 29 November 2022, the Authority issued a provisional order to Delta Gas and Power Ltd (“Delta”) in accordance with section 25(2) of the Electricity Act 1989 and section 28(2) of the Gas Act 1986.

Based on the information received by the Authority, it considers that Delta is contravening Standard Licence Condition 5 (SLC 5). SLC 5 gives the Authority the power to request information from licensees. The particular behaviour of concern giving rise to the making of the provisional order is that:

Delta has failed to provide in full information requested by Ofgem under SLC 5.

The information was requested on 2 September 2022 and again on 9 November 2022, pursuant to SLC 5 of Delta’s Gas and Electricity Supply Licenses, yet Delta has failed to respond in full to the requirements of the requests for information.

The provisional order requires Delta to comply with the Authority’s requests for information by no later than 5pm on Monday 5 December 2022.

Provisional orders are issued in certain circumstances in accordance with the Electricity Act 1989 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

On 21 December 2022, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989. The Authority decided that the terms of the provisional order were no longer requisite for the purpose of ensuring Delta’s compliance with its RFI obligation, as Delta responded adequately to the RFI on 19 December 2022. The provisional order is no longer in place.

The case on Ofgem's site

9 Nov 2022: Delta Gas and Power Ltd: Provisional Order November 2022

Type as published: Enforcement case. Published 9 Nov 2022. Status as published: Provisional Order closed.

On 14 March 2024, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989 and Section 28(7)(c) of the Gas Act 1986. The Authority is now satisfied that the provision/s made by the confirmed provisional order are no longer requisite for the purpose of securing Delta’s compliance with SLC 4A. As such, the provisional order is no longer in place.

On 13 December 2023, the Authority decided to publish its notice of proposal to revoke the confirmed provisional order, dated 6 February 2023, imposed on Delta Gas and Power Ltd (“Delta”). The Authority is now satisfied that the provision/s made by the confirmed provisional order are no longer requisite for the purpose of securing Delta’s compliance with SLC 4A. The Authority gave this notice in accordance with section 26(6) of the Electricity Act and section 29(5) of the Gas Act. Any representations or objections with respect to this notice of proposal to revoke the confirmed provisional order are to be made to the Authority by 11 January 2024.

On 27 March 2023 the Authority issued Delta Gas and Power Ltd (“Delta”) with a Notice of failure to comply with a confirmed Provisional Order within the meaning of section 25 of the Electricity Act 1989 and section 28 of the Gas Act 1986.

The notice provided Delta with written notice, pursuant to Schedule 2(1)(c)(i) of the Electricity Supply Licence and Schedule 2(1)(c)(i) of the Gas Supply Licence, of failure to comply with the Provisional Order, confirmed with modifications, issued to Delta on 6 February 2023.

The notice further explained that if this failure was not rectified to the satisfaction of the Authority within three months of Delta receiving the notice, the Authority may at any time revoke Delta’s electricity and gas licences subject to giving no less than 30 days’ notice.

On 6 February 2023, the Authority published the confirmation of the provisional order dated 7 November 2022, with modifications, issued to Delta Gas and Power Ltd, following the consultation period.

The Authority noted that no representations were received by the deadline of 2 February 2023 in the context of the consultation undertaken pursuant to section 26(1) of the Electricity Act 1989 and section 29(1) of the Gas Act 1986. The Authority is satisfied that Delta is contravening or is likely to contravene the Operational Capability Principle (Standard Licence Condition 4A). This confirmed provisional order requires that Delta does not act in contravention of SLC 4A and improves its operational capability such that it can respond accurately and on time to any Requests for Information from the Authority in relation to its financial position and arrangements or otherwise. Further details are contained in the order itself and the Notice of Reasons, below.

On 11 January 2023 the Authority issued its notice of proposal to confirm the provisional order dated 7 November 2022, with modifications, imposed on Delta on the grounds that Delta is contravening or is likely to contravene Standard Licence Conditions (SLC) 4A (Operational Capability Principle). The Notice of Proposal invites representations or objections in relation to the proposed confirmation by 2 February 2023. The Authority gives notice that in accordance with section 26(1) of the Electricity Act 1989 (“EA89”) and 29(1) of the Gas Act 1986 “GA86.”:

The requirement to have the operational capability to respond accurately and on time to any Requests for Information from the Authority in relation to its financial position and arrangements or otherwise is the requirement for the purposes of the modified provisional order. The acts or omissions which, in the Authority’s opinion, constitute or would constitute contraventions of those conditions and requirements, and other factors which in the Authority’s opinion justify the confirmation of the provisional order are those set out in the Notice of proposal to confirm the provisional order.

[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]

The Authority will consider these representations and then make a final decision on whether to confirm the provisional order prior to 7 February 2023 (the date on which the provisional order would lapse if not confirmed).

On 7 November 2022, the Authority issued a provisional order to Delta Gas and Power Ltd (“Delta”) in accordance with section 25(2) of the Electricity Act 1989 (“EA89”) and 28(2) of the Gas Act 1986 “GA86.”

The Authority considered that Delta was contravening or was likely to contravene Standard Licence Conditions (SLC)s 4A (Operational Capability Principle) and 4B (Financial Responsibility Principle).

The particular areas of concern giving rise to the making of the provisional order were that Delta:

Did not appear to have the capability to comply with its relevant legislative and regulatory obligations

Was not able to responsibly manage its costs at risk of being mutualised and did not have adequate arrangements in place to meet those costs because: It did not appear to have adequate financial arrangements in place to operate effectively under the stress-test scenarios set by the Authority

It did not appear to have adequate hedging in place at a time of volatile wholesale energy prices

The provisional order required Delta to address our concerns immediately and fully. Until such time, the provisional order banned Delta from taking on any new customers and removing any money from the business unless it constituted spending essential to the operation of Delta’s supply business.

Provisional orders are issued in certain circumstances in accordance with the EA89 or GA86 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .

The case on Ofgem's site

28 Sep 2022: Delta Gas and Power: Final Order

Type as published: Enforcement case. Published 28 Sep 2022. Status as published: Final Order closed.

On 28 September 2022, the Authority issued a Notice of Proposal to make a Final Order on Delta Gas and Power Ltd. (“Delta”) in accordance with section 26(1) of the Electricity Act 1989.

The behaviour of concern giving rise to the proposal is that Delta failed to meet its Renewables Obligations (RO), by failing to produce Renewables Obligations Certificates to the Authority by 1 September 2022 or to make payments as an alternative before 1 September 2022, sufficient to discharge its RO.

On 7 September 2022 the Authority requested for Delta to provide sufficient assurances that it would be in a position to make the necessary payment, including applicable daily interest, by no later than the late payment deadline of 31 October 2022; whilst Delta provided information in response to this, these assurances were insufficient.

Representations or objections concerning the proposed Final Order were invited to be made to the Authority by 5pm on 19 October 2022. The Authority received representations from Delta and a third party which were considered. Additionally, during the consultation period, Delta made full payment of their RO (Scotland), however the remaining RO is still outstanding.

Therefore, on 25 October 2022, the Enforcement Decision Panel (“EDP”), decided to make a Final Order.

The Final Order required Delta to make payment to the Authority in full settlement of its RO for the obligation period of 1 April 2021 to 31 March 2022, the sum of £530,809.20, plus accrued interest, by no later than 31 October 2022.

On 25 November 2022, Delta paid its remaining RO balance for the 2021/22 year. The Authority is satisfied that the Final Order is no longer requisite for the purposes of securing Delta’s compliance with its 2021/22 RO because Delta has paid its outstanding RO obligation in full, albeit late.

On 22 December 2022 the Authority published a Notice of Proposal to revoke the final order issued to Delta Gas and Power Limited (“Delta”). The Authority was satisfied that the Final Order should be revoked because Delta had paid its RO payment in full for the year 2021/2022, albeit late.

The Authority gave this notice in accordance with section 26(6) of the Electricity Act 1989. Any representations or objections with respect to the proposed revocation were invited to be made to the Authority by 5pm on 19 January 2023. No representations or objections were received in response to the proposal to revoke the Final Order.

On 3 February 2023, the Authority issued a revocation order under section 25(7)(c) of the Electricity Act 1989. The Authority decided that the Final Order was no longer required for the purpose of ensuring Delta’s compliance with the RO as Delta had paid its RO payment in full for the year 2021/2022, albeit late. The Final Order is no longer in place.

The case on Ofgem's site

28 Sep 2022: Logicor Energy Limited: Final Order

Type as published: Enforcement case. Published 28 Sep 2022. Status as published: Final Order closed.

On 28 September 2022, the Authority published its notice of proposal to issue a Final Order (FO) on Logicor Energy Ltd in accordance with Section 25(1) of the Electricity Act 1989 (EA89)

The particular behaviour of concern giving rise to the proposed FO was that Logicor Energy Ltd failed to meet its Renewables Obligations (RO), by failing to produce Renewables Obligation Certificates (ROC) to the Authority by 1 September 2022, or to make payments as an alternative by 31 August 2022, sufficient to discharge its RO. Logicor Energy Ltd subsequently failed to provide robust assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2022.

The Authority noted the representations received in the context of the consultation undertaken pursuant to section 26(1) of the EA89.

Logicor Energy Ltd made full payment of its RO for 2021-22, including all applicable interest, thus ensuring compliance with its RO for 2021-2022.

Therefore, on 26 October 2022, the Authority made a decision not to make a FO.

The case on Ofgem's site

22 Sep 2022: Scottish Power: Provisional Order

Type as published: Enforcement case. Published 22 Sep 2022. Status as published: Provisional Order closed.

On 21 September 2022, the Gas and Electricity Markets Authority (“the Authority) issued a Provisional Order to Scottish Power Energy Retail Ltd. (trading under: “Scottish Power”) (“SP”) in accordance with section 25(2) of the Electricity Act 1989 and 28(2) of the Gas Act 1986.

It appeared to the Authority that SP was contravening or was likely to contravene Standard Licence Conditions SLC 27.8A(b), 27.8A(c) and 27.8A(d). The behaviours that gave rise to these concerns (and resulted in the issuing of the Provisional Order) related to SP’s assessment of a customer’s ability to pay debt (including the setting of default repayment rates) and not exploring all available options to support customers expressing concerns about the affordability of debt repayment plans (including customers in vulnerable situations).

The Provisional Order set out a number of actions for SP to complete by specified deadlines. These included revision of policies, procedures and scripts, retraining of representatives, contacting customers to ensure repayment plans were affordable, implementing a quality assurance regime and committing to an independent audit. Full details are contained in the provisional order and Notice of Reasons published on 21 September 2022.

On 9 December 2022, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989 and section 28(7)(c) of the Gas Act 1986. The Authority decided that the terms of the provisional order were no longer requisite for the purpose of ensuring SP’s compliance as SP completed the actions outlined in the Provisional Order on 21 November 2022.

The provisional order is no longer in place.

The case on Ofgem's site

15 Sep 2022: Utilita Energy: Provisional Order

Type as published: Enforcement case. Published 15 Sep 2022. Status as published: Provisional Order closed.

On 9 September 2022, the Authority issued a Provisional Order to Utilita under section 25(2) of the Electricity and Act 1989 and section 28(2) of the Gas Act 1986.

The Authority has engaged with Utilita throughout the period of the Provisional Order being in place. Having assessed the information received, the Authority is satisfied that Utilita has been taking steps which we consider to be appropriate to secure compliance with SLCs 26.4, 26.5(d) (in respect of its customers, particularly vulnerable customers, customers on the PSR and customers in debt) and SLCs 27.8(b), 27A.5, 27A.6 and 27A.7 (governing the application of ASC).

Therefore, the Authority has decided not to confirm the Provisional Order. The Provisional Order has lapsed and ceased to have effect on the 9 December 2022.

On 9 September 2022, the Gas and Electricity Markets Authority (“the Authority”) issued a Provisional Order to Utilita Energy Ltd (“Utilita”) in accordance with section 25(2) of the Electricity Act 1989 and section 28(2) of the Gas Act 1986.

It appears to the Authority that Utilita is contravening and likely to contravene Standard Licence Conditions (“SLCs”) 27A.5-27A.7 and 27.8(b), governing the application of Additional Support Credits, a fixed amount of credit provided to a Domestic Customer in a Vulnerable Situation when their Prepayment Meter credit runs low or runs out to ensure continuity of electricity supply or return on supply.

It also appears to the Authority that Utilita is contravening and likely to contravene SLCs 26.4 and 26.5(d) in respect of its Utilita’s treatment of its customers, particularly vulnerable customers, customers on the Priority Services Register (“PSR”) and customers in debt.

Therefore, the Authority has taken the decision to issue a Provisional Order which seeks to bring Utilita into compliance with SLCs 26.4, 26.5(d), 27.8(b), 27A.5, 27A.6 and 27A.7.

The Provisional Order requires Utilita to immediately:

Not act in contravention of the relevant SLCs.

Cease the use of call scripts which tells customers that Additional Support Allowance is not a licence requirement.

Take ability to pay into account for all repayment plan calculations and on each occasion ASC is offered, calculate the instalments for repayment.

Develop its Additional Support Credit policy to ensure compliance with the relevant SLCs.

The Provisional Order also requires that by no later than 4pm on 30 th September 2022, Utilita:

Has reviewed its cases where customers are off supply to ensure that they are offered Additional Support Credit where required and assess whether prepayment meters remain a safe payment method in each circumstance;

Offer a credit mode meter to all PSR supply dependant customers that is safe and practicable in all circumstances of the case;

Review and engage proactively with all PSR customers’ request for Additional Support Credit including to ensure that functionality of the prepayment meter is safe and reasonably practicable in all circumstances; and

Fully engage with Citizens Advice Bureau, Citizens Advice Scotland’s Extra Help Unit and Ombudsman Services to ensure all referral and off supply incidents are reassessed in line with the SLCs.

Finally, the Provisional Order requires that by no later than 4pm on 31 October Utilita: provide the Authority with an independent audit confirming its compliance with the other aspects of the Provisional Order.

Further details of what Utilita is required to do, and by when, are contained in the order itself and the Notice of Reasons, below.

Provisional orders are issued in certain circumstances in accordance with the Electricity Act 1989 or Gas Act 1986 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines. For further information about this Provisional Order see the attached documents below.

The case on Ofgem's site

28 Jul 2022: Investigation into UK Energy Incubator Hub Ltd's compliance with multiple licence conditions

Type as published: Enforcement case. Published 28 Jul 2022. Status as published: Closed.

Decision to close the investigation into UK Energy Incubator Hub Ltd (“UKEIH”) compliance with its obligations under the gas and electricity supply licences (Standard Licence Condition 5, 4C & 11.2).

UKEIH ceased trading on 9 July 2022, and its licences to supply gas and electricity were revoked on 9 July 2022.

As a result, the investigation into UKEIH compliance under the gas and electricity supply licences (Standard Licence Condition 5 and 11.2) has closed.

We were investigating whether UKEIH complied with these conditions in relation to its failure to comply with industry codes and its failure to respond to requests for information. UKEIH’s customers have been transferred to Octopus Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints Octopus Energy to take on customers of UK Energy Incubator Hub (UKEIH).

The case on Ofgem's site

28 Jul 2022: TruEnergy Limited: Provisional Order

Type as published: Enforcement case. Published 28 Jul 2022. Status as published: Provisional Order closed.

On 28 July 2022, the Authority issued a Provisional Order to TruEnergy Ltd, under section 25(2) of the Electricity and Act 1989 (“EA89”) and section 28(2) of the Gas Act 1986 (“GA86”).

The Authority is concerned about TruEnergy’s internal systems and processes for setting direct debits. The Authority is also concerned about the current levels of customer’s direct debit amounts and whether these are reflective of customers' electricity and/or gas consumption.

Therefore, the Authority has taken the decision to issue a Provisional Order to ensure compliance with Standard Licence Condition (“SLC”) 4A.1 (Operational capability) and SLC 27.15 (Provision of Information).

The provisional order requires TruEnergy to commission an independent audit of its direct debit policy and processes, and to review all customer direct debits, making any adjustments as appropriate. Further details of what TruEnergy is required to do, and by when, are contained in the order itself. We published a Notice of Reasons document on 2 August 2022, explaining in greater detail the rationale for issuing the Provisional Order.

On 28 July 2022, the Authority issued a Provisional Order to TruEnergy Ltd, under section 25(2) of the Electricity and Act 1989 (“EA89”) and section 28(2) of the Gas Act 1986 (“GA86”).

The Authority has engaged with TruEnergy throughout period of the Provisional Order being in place. The Authority has reviewed and considered the information submitted to it by TruEnergy. Having done so, the Authority notes that TruEnergy’s performance has improved since it issued the Provisional Order and the Authority is now satisfied that TruEnergy is no longer contravening or likely to contravene SLC 4A.1 (Operational capability) and SLC 27.15 (Provision of Information).

Therefore, because the Authority is satisfied that TruEnergy is not contravening or likely to contravene SLC4A.1 and SLC27.25 the Authority has decided not to confirm the Provisional Order. The Provisional Order has therefore lapsed and ceased to have effect on the 28 October 2022.

Provisional orders are issued in certain circumstances in accordance with the EA89 or GA86 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines.

The case on Ofgem's site

7 Jul 2022: UK Energy Incubator HUB Ltd: Notice of decision not to make Final Order

Type as published: Enforcement case. Published 7 Jul 2022.

On 7 July 2022, the Authority issued a Notice of Proposal to make a Final Order on UK Energy Incubator HUB Ltd (“UKEIH”) pursuant to section 29(1) Gas Act 1986 and section 26(1) of the Electricity Act 1989. The Authority proposed to make a Final Order to require UKEIH to comply with Standard Licence Condition (“SLC”) 4C (Ongoing fit and proper requirement.) Representations or objections with respect to the proposed Final Order were invited to be made to the Authority by 5pm on Thursday 28 July 2022. No representations were received in response to the consultation. On 9 July 2022, UKEIH ceased trading and its licence was revoked shortly thereafter. As such, the Authority has decided not to proceed with issuing the final order. For the avoidance of doubt, no finding of non-compliance (or otherwise) has been made by the Authority in this matter (in respect of UKEIH or any other relevant party) and the Authority’s investigation has now been discontinued. Notice of Proposal to make a Final Order are issued in certain circumstances in accordance with the statutory framework on Final Orders pursuant to section 28(1) Gas Act 1986 and section 25(1) of the Electricity Act 1989 and where certain conditions are satisfied. Further information regarding Notices to make a Final Order and Final Orders is contained within our Enforcement Guidelines. For further information relating to this Notice of Proposal to make a Final Order and Notice of decision not to make Final Order, please see the documents below.

The case on Ofgem's site

17 Jun 2022: UK Energy Incubator Hub Ltd: Provisional Order June 2022

Type as published: Enforcement case. Published 17 Jun 2022. Status as published: Provisional Order closed.

*UK Energy Incubator Hub Ltd ("UK Energy") ceased trading on 11 July 2022 and its licences to supply electricity and gas were subsequently revoked. As a result, the provisional order issued to UKEIH on 17 June 2022 is no longer in effect.*

On 17 June 2022, the Authority issued a Provisional Order to UK Energy Incubator Hub Ltd (“UK Energy”) in accordance with section 25(2) of the Electricity Act 1989 and section 28(2) of the Gas Act 1986.

The particular behaviour of concern giving rise to the Provisional Order is that UK Energy has failed to provide information requested by Ofgem under Standard Licence Condition ("SLC") 5. SLC 5 gives the Authority the power to request information from licensees.

The two requests for information were issued on 25 February 2022, pursuant to SLC 5 of UK Energy’s Gas and Electricity Supply Licenses; these requests relate to financial stress testing and Management Control Framework.

The Provisional Order requires UK Energy to fully and immediately comply with the Authority’s requests for information.

We published a Notice of Reasons document on 22 June 2022, explaining in greater detail the rationale for issuing the Provisional Order.

The case on Ofgem's site

1 Jun 2022: UK Energy Incubator Hub Ltd: Provisional Order May 2022

Type as published: Enforcement case. Published 1 Jun 2022. Status as published: Provisional Order closed.

*UK Energy Incubator Hub Ltd ("UKEIH") ceased trading on 11 July 2022 and its licences to supply electricity and gas were subsequently revoked. As a result, the provisional order issued to UKEIH on 31 May 2022 is no longer in effect.*

On 31 May 2022, the Authority issued a provisional order to UK Energy Incubator Hub Ltd (UKEIH) in accordance with Section 25(2) of the Electricity Act 1989 and Section 28(2) of the Gas Act 1986.

Based on the information received by the Authority, it considers that UKEIH is contravening or is likely to contravene Standard Licence Conditions SLC 0.3(a), 0.3(c), Consumer Complaints Handling Standards Regulations 3, 6, 7(1)(a) and 7(1)(b) and section 47 of the Consumers, Estate Agents and Redress Act 2007.

The particular behaviours of concern giving rise to the making of the provisional order are UKEIH’s failure to:

ensure its customer service arrangements are fit for purpose, on account of customers’ inability to contact UKEIH via telephone and/or email and UKEIH’s failure to honour callback requests, or deal with issues raised in a timely manner;

ensure that complaint remedies are implemented, in circumstances where a customer complaint has been escalated and upheld by Ombudsman Services and a complaint remedy proposed by Ombudsman Services;

engage fully and properly with the Extra Help Unit of the Citizen’s Advice Bureau to resolve all outstanding issues and complaints in a timely and efficient manner; and

pay its outstanding fees to the Ombudsman Services.

The provisional order requires UKEIH to fully and immediately address these behaviours of concern. The provisional order also requires UKEIH to refrain from all sales, marketing and customer acquisition activity, including the acquisition of any new domestic customer or upgrading of any existing domestic customer to dual fuel, until such time as it provides the Authority with an independent audit report confirming UKEIH’s compliance with paragraphs (1) to (4) of the provisional order.

We published a Notice of Reasons document on 1 June 2022, explaining in greater detail the rationale for issuing the Provisional Order.

The case on Ofgem's site