Source stamp: OFGEM COMPLIANCE AND ENFORCEMENT CASES / RETRIEVED 24 NOV 2026 / NO LINK MADEThe status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.
Cases 136 to 150 of 252. Page 10 of 17. Every row is on one of these pages.
2 Aug 2018: Investigation into npower’s compliance with its obligations under the electricity supply licence (Standard Licence Condition 12)
Type as published: Enforcement case. Published 2 Aug 2018. Closed 17 Sep 2018. Status as published: Closed.
Decision (as Ofgem words it): Notice of decision to impose a financial penalty on npower following our investigation into its compliance with SLC 12 of its electricity supply licence
Further to the Enforcement Decision Panel’s ('EDP') notice of intention to impose a penalty of £2.4 million on npower in respect of breaches of Standard Licence Condition (‘SLC’) 12.18 and SLC 12.21 issued by the EDP on 1 August 2018 on behalf of the Gas and Electricity Markets Authority (‘GEMA’), the period for making written representations in response to that notice expired on 31 August 2018.
On 17 September 2018, having considered the representations and objections made to it in response to that notice and in exercise of its delegated powers and duties, and on behalf of the GEMA, the EDP gave notice of its decision under section 27A(5) of the Electricity Act 1989 to impose a single joint penalty of £2.4 million on npower Direct Limited, npower Limited, npower Northern Limited and npower Yorkshire Limited in respect of their non-compliance with their obligations under SLC 12.18 and SLC 12.21 of the Electricity Supply Licence.
27 Jun 2018: Iresa: Provisional Order
Type as published: Enforcement case. Published 27 Jun 2018. Closed 3 Aug 2018. Status as published: Provisional Order closed.
Iresa Limited (“Iresa”) ceased trading on 31 July 2018 and its licences to supply gas and electricity were revoked as of 01 August 2018. As a result, the provisions of the confirmed Provisional Order which were imposed on Iresa Limited on 27 March 2018 are no longer in effect.
Iresa’s customers have been transferred to Octopus Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem protects Iresa customers' supplies and credit balances .
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
For information relating to this Provisional Order, please see documents below.
- Provisional Order issued to Iresa Ltd - 27 March 2018 [PDF, 410.29KB]
- Notice of reasons for issue of provisional order - 28 March 2018 [PDF, 398.08KB]
- Notice of proposal to confirm provisional order 31 May 2018 [PDF, 572.29KB]
- Confirmed Provisional Order issued to Iresa Ltd [PDF, 411.69KB]
- Iresa confirmation of provisional order reasons document dated 28 June 2018 (Updated 06 July 2018) [PDF, 217.57KB]
11 Apr 2018: Investigation into Cadent Gas Limited and its compliance with its obligations under its gas transporter licence (Standard Special Conditions A40, A50 and A55) and as a consequence section 9 of the Gas Act 1986
Type as published: Enforcement case. Published 11 Apr 2018. Closed 22 May 2019. Status as published: Closed.
Decision (as Ofgem words it): Decision of the Gas and Electricity Markets Authority to close its investigation into Cadent’s compliance with its gas transporter licence (Standard Special Conditions A40, A50 and A55) and Section 9 of the Gas Act 1986
The Gas and Electricity Markets Authority (“the Authority”) has decided to close its investigation into Cadent’s compliance with its obligations under its gas transporter licence (Standard Special Conditions A40, A50 and A55) and Section 9 of the Gas Act 1986 by way of alternative action.
The decision was taken in accordance with our Enforcement Guidelines, following Cadent taking steps to investigate and rectify the issues at a cost of £3.6m which they covered in full, taking satisfactory improvement actions, and in addition offering to make a payment of £3m into the Energy Saving Trust Voluntary Redress Fund in recognition of its shortcomings.
SSC A40 and A55 require robust processes to be in place to allow complete and accurate data to be collected and recorded when required to be submitted to Ofgem.
Section 9 of the Gas Act 1986 requires a licensee to develop and maintain an efficient and economic pipeline system for the conveyance of gas.
Further details can be found in the decision document.
16 Feb 2018: Investigation into Iresa and its compliance with its obligations under its gas and electricity supply licences, SLCs 14, 23.3, 23.4, 25C (SLC 0 from October 2017), 27.5-27.8, 27.16, and the CHSR 2008
Type as published: Enforcement case. Published 16 Feb 2018. Closed 6 Aug 2018. Status as published: Closed.
Iresa Limited (“Iresa”) ceased trading on 31 July 2018 and its licences to supply gas and electricity were revoked as of 01 August 2018. As a result, the Investigation into Iresa and its compliance with its obligations under its gas and electricity supply licences, SLCs 14, 23.3, 23.4, 25C (SLC 0 from October 2017), 27.5-27.8, 27.16, and the CHSR 2008 has closed.
We were investigating whether Iresa breached licence conditions and Consumer Complaints Handling Standards relating to treating customers fairly, complaints and call handling, customer switching, providing refunds and consideration of customers’ ability to pay when in debt.
Iresa’s customers have been transferred to Octopus Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem protects Iresa customers' supplies and credit balances .
2 Feb 2018: Investigation into Ovo and its compliance with its obligations under the gas and electricity supply licences, Standard Licence Conditions 31A and 25C (SLC 0 from October 2017), SLC 22C, SLC 26, and SLC 27 and SLC 28A
Type as published: Enforcement case. Published 2 Feb 2018. Closed 9 Apr 2020. Status as published: Closed.
Decision (as Ofgem words it): Notice of decision to impose a financial penalty on Ovo Energy following our investigation into its compliance with its obligations under the gas and electricity supply licences, SLCs 31A and 25C (SLC 0 from Oct 2017), SLC 22C, SLC 26, SLC 27 and SLC 28A
The Gas and Electricity Markets Authority (“the Authority”) has confirmed its decision to impose a financial penalty on Ovo Electricity Limited and Ovo Gas Limited (jointly Ovo Energy Limited) for its failure to comply with SLCs 22C, 25C/0, 27, 28A and 31A of its Electricity and Gas Supply Licences.
SLC 22C requires suppliers to provide information on (among other things) a customer’s estimated annual costs and estimated annual savings.
SLC 25C, which was in force until October 2017, required suppliers to take all reasonable steps to achieve certain standards of conduct and to ensure that the standards were interpreted and applied consistently with the customer objective, which was to treat customers fairly.
SLC 25C has since been modified; our enhanced Standards of Conduct came into force on 10 October 2017 and is now known as SLC 0.
SLC 27 requires suppliers to take all reasonable steps to issue final bills within 6 weeks of a customer leaving supply and also issue corrected final bills (if required) in a timely manner.
SLC 28A requires suppliers to ensure that charges for energy do not exceed the maximum permitted charges under the prepayment price cap.
SLC31A sets out specific obligations concerning the provision of information on bills, statements of account and annual statements.
The Authority made no finding of breach in respect of SLC 26 (Priority Services Register), which was within the scope of this investigation.
The Authority considered it appropriate to impose a financial penalty for these contraventions and issued its Notice of Intention to impose a financial penalty on Ovo Energy Ltd on 29 January 2020. There was one representation made in response to that publication, which has been addressed in the final penalty notice.
The Authority has decided to impose a financial penalty of £1 on Ovo Electricity Limited and £1 on Ovo Gas Limited. This is in addition to £8,876,500 (less £2) that Ovo has agreed to pay in voluntary redress. The redress will be paid into Ofgem’s Voluntary Redress Fund (administered by the Energy Saving Trust) and the money will be used to the benefit of energy consumers.
Further details can be found in the final penalty notice.
15 Jan 2018: Notice of decision to impose a financial penalty on E (Gas and Electricity) Limited following our investigation into its compliance under the gas and electricity supply licences (Standard Licence Conditions 25 and 13)
Type as published: Enforcement case. Published 15 Jan 2018.
Decision for (as Ofgem words it): Investigation into E (Gas and Electricity) Limited’s compliance under the gas and electricity supply licences (Standard Licence Condition 25 and 13)
The Gas and Electricity Markets Authority ("the Authority") has confirmed its decision to impose a financial penalty on E (Gas and Electricity) Ltd ("E") for its failure to comply with SLCs 25.2 (the sales and marketing objective) and 13.1(b) and (d) (arrangements for site access) of its Electricity and Gas Supply Licences.
SLC 25.2 requires suppliers to take all reasonable steps to achieve the Objective of SLC 25 and not do anything that jeopardises its ability to achieve that Objective of ensuring, among other things, that:
All information which the licensee or any Representatives provides does not mislead the Domestic Customer to whom it is directed and is otherwise fair both in terms of its content and in terms of how it is presented.
Such activities and all contact by the licensee or a representative with a Domestic Customer are conducted in a fair, transparent, appropriate and professional manner.
SLC 13.1 requires suppliers to take all reasonable steps to ensure that each Representative who visits a Customer’s premises on the licensee’s behalf:
(b) can be readily identified as a Representative of the licensee by a member of the public …
and
(d) is a fit and proper person to visit and enter the Customer’s premises.
The Authority considered it appropriate to impose a financial penalty for these contraventions. The Authority has imposed a financial penalty of £1 on E. This is in addition to £260,000 (less £1) that E has agreed to pay in voluntary redress. The redress will be paid into Ofgem’s new Voluntary Redress Fund (administered by the Energy Saving Trust) and the money will be used to the benefit of energy consumers.
Further details can be found in the final penalty notice.
20 Nov 2017: Investigation into SSE and its compliance with its obligations under the gas and electricity supply licences (Standard Licence Conditions 31A and 25C)
Type as published: Enforcement case. Published 20 Nov 2017. Closed 7 Jun 2018. Status as published: Closed.
Decision (as Ofgem words it): Decision to close the investigation into SSE and its compliance with its obligations under the gas and electricity supply licences (Standard Licence Conditions 31A and 25C)
We investigated SSE’s compliance with Standard Licence Conditions 31A and 25C of the gas and electricity supply licences in relation to Annual Statements issued to Pre-Payment Meter customers.
SLC 31A sets out specific obligations concerning the provision of information on Bills, statements of account and Annual Statements.
SLC 25C, which was in force until 9 October 2017, required suppliers to take all reasonable steps to achieve the standards of conduct and to ensure that the standards were interpreted and applied consistently with the customer objective, which was to treat customers fairly. This requirement has since been modified; our enhanced Standards of Conduct came into force on 10 October 2017.
We have decided to close the case through alternative action with SSE making a payment of £1m to the Voluntary Redress Fund, in accordance with the criteria set out in our Enforcement Guidelines .
Further details can be found in the decision document.
20 Jul 2017: Ofgem investigates National Grid Electricity Transmission plc under REMIT for publishing incorrect market information
Type as published: Enforcement case. Published 20 Jul 2017. Status as published: Closed.
Ofgem has undertaken a REMIT (EU Regulation 1227/2011 on wholesale energy market integrity and transparency) investigation into National Grid Electricity Transmission plc’s (“NGET”) failure to provide accurate information to the wholesale energy market.
Our investigation focused on concerns that NGET had breached Article 5 of REMIT, the prohibition of market manipulation, during specific periods between November 2015 and January 2016. During these periods, NGET erroneously caused incorrect De-Rated Margin (“DRM”) calculations to be published through Elexon’s online platform. There is clear evidence that this resulted in false or misleading signals as to the supply of, demand for, or price of wholesale energy products being given to the market, contrary to Article 5 of REMIT, as defined under Article 2(2)(b).
REMIT is designed to ensure the integrity and transparency of wholesale energy markets. Our investigation highlighted a number of deficiencies in NGET’s processes, which resulted in the undermining of market confidence and had a direct impact on the integrity and transparency of the GB wholesale energy market.
Our investigation found that any breach by NGET over the affected period was unintentional and occurred as a result of deficiencies in the internal processes for calculating the DRM. We note that the publication of erroneous information had a relatively low financial impact on market participants as a whole. We also acknowledge that NGET has published a lessons learnt document into these occurrences and that changes have been made to NGET’s processes to ensure this type of situation is not repeated.
However, this incident is one of several instances over the past year where we have observed NGET providing inadequate information, IT systems and processes. We consider these incidents to be below the standards we, and market participants, expect from the System Operator (SO).
NGET, as the SO, plays a crucial role in providing information services to the market and it is vital it does so to a high standard. NGET should be aware that whilst, so far, each incident in isolation is not believed to have had a substantial financial impact on the market, the cumulative impact of all these incidents on market confidence may give us sufficient grounds to take further enforcement action should they continue to occur in the future.
Taking all the relevant information into consideration we have decided it would not be appropriate to proceed with our investigation on this occasion. In reaching this decision, we considered the relatively limited direct impact of the erroneous DRM on the market, the relatively low materiality of the breach and our role as a proportionate regulator and enforcer of REMIT. However, we expect NGET to take all reasonable measures to prevent the re-occurrence of the process deficiencies we identified during our investigation.
As a first step, we expect NGET to engage with market participants. For example, by forming a working group with industry participants to establish a programme which ensures that the information provided, and the IT systems used, meet the needs and expectations of market participants. We also encourage market participants to raise any concerns about the performance of the SO with us so that we can ensure continued compliance with REMIT and confidence in the provision of market information.
6 Jul 2017: Investigation into British Gas Trading Limited and its compliance with its obligations under the gas and electricity supply licences (Standard Licence Conditions 24 and 25C)
Type as published: Enforcement case. Published 6 Jul 2017. Closed 29 Aug 2018. Status as published: Closed.
Decision (as Ofgem words it): Decision to close the investigation into British Gas Trading Limited (BG) and its compliance with its obligations under the gas and electricity supply licences (Standard Licence Conditions 24 and 25C)
The Gas and Electricity Markets Authority ("the Authority") has decided to close its investigation into BG’s compliance with its obligations under the gas and electricity supply licences (Standard Licence Conditions 24 and 25C).
The decision was taken following satisfactory implementation of improvement actions agreed between the Authority and BG.
SLC 24 sets out obligations concerning the termination of domestic supply contracts including the circumstances in which termination fees may be charged, the continuation of fixed term supply contract terms, and the terms and conditions of supply contracts. SLC 25C which was in force until October 2017, required suppliers to take all reasonable steps to achieve certain standards of conduct and to ensure that the standards were interpreted and applied consistently with the Customer Objective, which was to treat customers fairly. This requirement has since been modified; our enhanced Standards of Conduct came into force on 10 October 2017 and is now known as SLC 0.
Further details can be found in the decision document.
29 Jun 2017: Notice of decision to impose a financial penalty on British Gas Trading Limited following our investigation into its compliance SLC 7A, 7B, 14, 14A and 21B and with the Consumer Complaints Handling Standards Regulations 2008
Type as published: Enforcement case. Published 29 Jun 2017.
Decision for (as Ofgem words it): Investigation into British Gas Trading Limited and its compliance with SLC 7A, 7B, 14, 14A and 21B and with the Consumer Complaints Handling Standards Regulations 2008
The Gas and Electricity Markets Authority ("the Authority") has confirmed its decision to impose a financial penalty on British Gas Trading Limited ("British Gas") following an investigation by Ofgem into its failure to comply with requirements under conditions 7A, 7B, 14A and 21B of its gas and electricity supply licenses and Regulations 3(2), 7(1)(a) and 7(1)(b) of the Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008 (CHRs).
Conditions 7A, 14A and 21B contain safeguards relating to supply to micro business consumers, as well as obligations on (non-domestic) customer transfers and billing.
Condition 7B (Standards of Conduct) requires suppliers to take all reasonable steps to achieve the Standards of Conduct (SOC), and to ensure they interpret and apply the SOC in a manner consistent with the Customer Objective of ensuring that each micro-business customer is treated fairly.
CHR 3(2) sets out provisions relating to the duty upon a supplier to comply with its own complaints handling procedure in relation to each consumer complaint it receives.
CHR 7(1)(a) sets out the duty upon a supplier to receive, handle and process consumer complaints in an efficient and timely manner.
CHR 7(1)(b) sets out the duty upon a supplier to allocate and maintain sufficient resources for the efficient and timely handling of complaints and to enable the supplier’s other obligations under the CHRs to be met.
The Authority considered it appropriate to impose a penalty for these contraventions. The penalty of £1 takes into account the fact that British Gas agreed to settle the investigation and to make consumer redress payments of £9.5 million (minus £1). British Gas will make consumer redress payments both to micro-business customers directly affected by its failings, and to the Money Advice Trust (which provides the Business Debtline service). The redress payments to Business Debtline will be used to provide debt advice services to business customers who are experiencing difficulties in paying their energy bills.
Further details can be found in the final Penalty Notice.
10 Feb 2017: Room in roof insulation investigation update
Type as published: Enforcement case. Published 10 Feb 2017.
This post was updated on 14 February 2017 to clarify that measures installed up to and including 28 July 2016 were included in the audit exercise. We have also made clear that the audit applied to measures that have been installed to 85% or more.
In the course of 2016, concerns were raised in relation to the standard of installation on some room-in-roof insulation (RIRI) measures. This prompted us to publish a clarification on 29 July 2016 stating that, where feasible, we always expect 100% of a RIRI measure to be insulated. We believe that this clarification has enhanced compliance with our requirements in the supply chain.
As part of our compliance monitoring, we conducted an investigation of RIRI measures installed before 29 July 2016. We asked suppliers to commission on-site inspections on a sample of measures. This was to determine if these measures were installed to the level claimed in the notification to us, and if not, how great the difference was between the actual level of insulation and the level of insulation notified to us.
As a result of the investigation, we found that 52% of ECO2 RIRI measures installed before 28 July had not been installed to the level notified to us. On average, the percentage of measure installed was 17 percentage points less than claimed on the notification. This figure was arrived at excluding the party wall, i.e. by assuming that none of the RIRI measures have a party wall element to them. Within the results, we found variation both between suppliers and between installers, but the original sample was not designed to be robust at these levels, because to do so would have required a significantly higher number of inspections.
Based on the above results, we decided to take action to ensure that the notified scores for RIRI measures are an accurate reflection of the actual installations that have taken place. To do this, we presented suppliers with the following three options:
Option 1: Apply a correction to the ‘percentage of measure installed’ to all RIRI measures installed before 29 July with a notified percentage of measure installed equal to or greater than 85%. The scale of the correction would be 17% or the observed difference for the individual supplier, whichever is the lesser. A table with the percentage for each supplier is included at the bottom of this page.
Option 2: Conduct more inspections to obtain a statistically reliable result at the supplier or individual installer level.
Option 3: Suggest an alternative to the above two options that provides Ofgem with a reasonably accurate figure for the actual percentage of measure installed for RIRI measures installed before 28 July 2016, or assures Ofgem that the notified information is correct.
We have now received confirmation from all suppliers that they will apply Option 1 across the majority of their measures. One supplier will be conducting further inspections for a small number of measures. We expect that at this stage, suppliers will have contacted their delivery partners to discuss their chosen approach. We recommend that installers who delivered RIRI measures contact the supplier through which they delivered, or the relevant intermediary, with any questions about how their measures might be impacted.
27 Jan 2017: Notice of Decision to impose a financial penalty on British Gas following our investigation into its compliance with its obligations under the electricity supply licence (Standard Licence Condition 12)
Type as published: Enforcement case. Published 27 Jan 2017.
Decision for (as Ofgem words it): Investigation into British Gas’ compliance with its obligations under the electricity supply licence (Standard Licence Condition 12)
The Authority has decided to impose a financial penalty on British Gas following an investigation by Ofgem into its failure to comply with Standard Licence Condition 12 of the Electricity Supply Licence (SLC 12), in relation to advanced meters for non-domestic premises.
The Authority found that British Gas breached SLCs 12.18 and 12.21. The provisions of SLC 12 govern the supply of electricity to relevant premises through advanced meters. British Gas admitted the breaches.
The Authority decided to impose a financial penalty of £1 on British Gas. This is in addition to £4.5 million (less £1) that British Gas agreed to pay in consumer redress to the Carbon Trust. These monies are to be used to help businesses across Great Britain save energy via energy saving audits and advice, and installation of energy efficiency measures.
Furthermore, British Gas agreed to increased levels of monitoring of the meter points at relevant premises which have not yet been installed with an advanced meter.
18 Oct 2016: Investigation into whether Economy Energy, E (Gas and Electricity) and Dyball Associates have infringed Chapter I of the Competition Act 1998 with respect to a suspected anti-competitive agreement
Type as published: Enforcement case. Published 18 Oct 2016. Closed 30 May 2019. Status as published: Closed.
Decision (as Ofgem words it): Decision to impose financial penalties on Economy Energy, E (Gas and Electricity) and Dyball Associates following an investigation into an infringement of Chapter I of the Competition Act 1998
The Authority opened an investigation in September 2016 to establish if there had been an infringement of Chapter I of the Competition Act 1998 (“CA98”). The investigation concerned a suspected anti-competitive agreement between Economy Energy, E (Gas and Electricity) Ltd (“EGEL”) and Dyball Associates (“Dyball”) (“the Parties”).
On 29 May 2018 the Authority issued a statement of objections to the three Parties to the investigation.
The recipients of the statement of objections had the opportunity to respond to the allegations. The Authority considered the representations it received before coming to its final decision.
The Authority has found that Economy Energy, EGEL and Dyball entered into an agreement and/or concerted practice to share markets and/or allocate customers between Economy and EGEL in relation to the supply of gas and electricity to domestic customers in Great Britain. Under the infringement, Economy, EGEL and Dyball agreed that neither Economy and EGEL, nor their sales agents, would actively target customers already supplied with gas and/or electricity by the other, but each other’s existing customers would be allowed to switch between the two businesses if they pro-actively sought to do so. The infringement was supported by the Parties sharing commercially sensitive and strategic information, in the form of details of their current customers. The agreement and/or concerted practice existed from, at the latest, January 2016 until, at the earliest, the date of the Authority’s first investigatory steps in this investigation in September 2016. This agreement and/or concerted practice had as its object the prevention, restriction or distortion of competition.
Dyball was party to the infringement and intended to contribute, and did contribute, to the common objectives pursued by Economy and EGEL. Dyball did this by facilitating the sharing of markets and allocation of customers between Economy Energy and EGEL, through its own conduct, in designing, implementing and maintaining software systems that allowed the acquisition of certain customers to be blocked and customer lists to be shared; and by, itself, sharing customer lists and instructions to block particular customers from switching between Economy and EGEL. Dyball was aware of the actual conduct planned and/or put into effect by Economy and EGEL in pursuit of the objective of sharing markets and/or allocating customers. Therefore, Dyball participated as a facilitator in the infringement.
Based on the evidence available to the Authority, this conduct does not benefit from a relevant exemption under the CA98.
Section 36 of the CA98 provides that the Authority may impose a financial penalty on an undertaking which has intentionally or negligently committed an infringement of the Chapter I prohibition. The Authority has concurrent jurisdiction with the CMA to apply and enforce the Chapter I prohibition. This jurisdiction is not restricted to entities that hold a license but extends to entities that participate in activities that are connected with or ancillary to licensable activities. The Authority has found that the Parties committed the Infringement intentionally or negligently and has decided to impose financial penalties of £650,000 on EGEL, £200,000 on Economy Energy Trading Limited and £20,000 on Dyball. The level of the penalty reflects the seriousness of this infringement, the need to ensure Economy Energy, EGEL and Dyball, and other undertakings, are deterred from engaging in this kind of collusive conduct, and the need for a penalty to be proportionate. In setting Economy Energy’s fine, the Authority has reflected the fact that Economy Energy is now in administration.
On 27 March 2018 a procedural complaint was made by Economy Energy regarding the investigation. A decision on that complaint was made in May 2018.
30 Sep 2016: Investigation into E (Gas and Electricity) Limited’s compliance under the gas and electricity supply licences (Standard Licence Condition 25 and 13)
Type as published: Enforcement case. Published 30 Sep 2016. Closed 15 Jan 2018. Status as published: Closed.
Decision (as Ofgem words it): Notice of decision to impose a financial penalty on E (Gas and Electricity) Limited following our investigation into its compliance under the gas and electricity supply licences (Standard Licence Conditions 25 and 13)
The Gas and Electricity Markets Authority ("the Authority") has confirmed its decision to impose a financial penalty on E (Gas and Electricity) Ltd ("E") for its failure to comply with SLCs 25.2 (the sales and marketing objective) and 13.1(b) and (d) (arrangements for site access) of its Electricity and Gas Supply Licences.
SLC 25.2 requires suppliers to take all reasonable steps to achieve the Objective of SLC 25 and not do anything that jeopardises its ability to achieve that Objective of ensuring, among other things, that:
All information which the licensee or any Representatives provides does not mislead the Domestic Customer to whom it is directed and is otherwise fair both in terms of its content and in terms of how it is presented.
Such activities and all contact by the licensee or a representative with a Domestic Customer are conducted in a fair, transparent, appropriate and professional manner.
SLC 13.1 requires suppliers to take all reasonable steps to ensure that each Representative who visits a Customer’s premises on the licensee’s behalf:
(b) can be readily identified as a Representative of the licensee by a member of the public …
and
(d) is a fit and proper person to visit and enter the Customer’s premises.
The Authority considered it appropriate to impose a financial penalty for these contraventions. The Authority has imposed a financial penalty of £1 on E. This is in addition to £260,000 (less £1) that E has agreed to pay in voluntary redress. The redress will be paid into Ofgem’s new Voluntary Redress Fund (administered by the Energy Saving Trust) and the money will be used to the benefit of energy consumers.
Further details can be found in the final penalty notice.
21 Sep 2016: Investigation into Economy Energy's compliance under the gas and electricity supply licences (Standard Licence Condition 25)
Type as published: Enforcement case. Published 21 Sep 2016. Closed 25 Jan 2019. Status as published: Closed.
Decision (as Ofgem words it): Decision to close the investigation into Economy Energy’s compliance with its obligations under the gas and electricity supply licences (Standard Licence Condition 25)
Economy Energy ceased trading on 8 January 2019 and its licences to supply gas and electricity were revoked as of 12 January 2019.
As a result, the investigation into Economy Energy's compliance under the gas and electricity supply licences (Standard Licence Condition 25) has closed.
We were investigating whether Economy Energy complied with Standard Licence Condition 25 in relation to its sales and marketing obligations.
Economy Energy’s customers have been transferred to Ovo under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Economy Energy customers: Your questions on new supplier Ovo Energy .