Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Ofgem compliance and enforcement cases, page 2 of 17

Cases 16 to 30 of 252, newest first, each in Ofgem's words. What this list is and is not, and how it was read, are on the first page of the list.

The status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.

Cases 16 to 30 of 252. Page 2 of 17. Every row is on one of these pages.

13 Nov 2024: Investigation into Utilita Energy Limited’s compliance with Standard Licence Conditions (SLC) 0, 4A, 23, 26, 27, 27A, 28 and 28B of the Electricity and Gas Supply Licences

Type as published: Enforcement case. Published 13 Nov 2024. Status as published: Open.

Ofgem is investigating Utilita Energy Ltd’s compliance with rules around installation and use of pre-payment meters for domestic customers. Utilita Energy Ltd is a domestic energy supplier based in Hampshire. SLC 0 relates to treating domestic customers fairly, including those in Vulnerable Situations. SLC 4A relates to operational capability, including having systems and processes in place to effectively serve its customers, as well as identifying and mitigating risks of consumer harm. SLC 23 relates to notification of Domestic Supply Contract Terms. SLC 26 relates to the duty of a supplier to establish a Priority Services Register, share information and offer additional support to customers on the register. SLC 27 relates to payments, security deposits, disconnections, Direct Debits and final bills. SLC 27A relates to self-disconnection, and the suppliers’ duty to offer appropriate support. SLC 28 relates to prepayment meters, including installation of involuntary prepayment meters. SLC 28B relates to Warrants relating to pre-payment meters and other supplier actions to recover debt. The opening of this investigation does not imply that we have made any findings about non-compliance by Utilita.

The case on Ofgem's site

6 Nov 2024: Notice of proposed financial penalty on Farringdon Energy Limited following investigation into its compliance with SLC 4A

Type as published: Enforcement case. Published 6 Nov 2024.

Ofgem has proposed to impose a financial penalty on Farringdon Energy Limited (Farringdon), requiring it to pay £223,676.00 for breaching Condition 4A (SLC 4A), operational capability, of the Standard Licensing Conditions (SLCs) in relation to the Provisional Order served on 9 May 2024.

SLC 4A.1 states:

The licensee must ensure it has and maintains robust internal capability, systems and processes to enable the licensee to:

(a) efficiently and effectively serve each of its Customers; (b) efficiently and effectively identify likely risks of consumer harm and to mitigate any such risks; and (c) comply with relevant legislative and regulatory obligations. The penalty relates to our findings that Farringdon had taken, and was continuing to take, direct debit payments, for non-domestic supply of electricity, from customers it was either no longer supplying electricity to, or had not commenced supplying.

Had Ofgem not intervened, this practice would have continued and resulted in Farringdon potentially causing customers further financial loss.

Ofgem’s investigation into further breaches of SLCs, including SLC 0A, by Farringdon are ongoing.

The case on Ofgem's site

17 Sep 2024: OVO compensates customers for failing to resolve customer complaints referred to Citizens Advice Extra Help Unit and Energy Ombudsman

Type as published: Enforcement case. Published 17 Sep 2024. Status as published: Closed.

OVO has acknowledged that its ability to serve customers in line with certain licence and regulatory obligations when dealing with consumer complaints was compromised.

OVO will pay compensation of £378,512 to customers and an additional £2 million to the Energy Industry Voluntary Redress Scheme 1 (EIVRS) in recognition of the severity of consumer detriment caused by this situation and as a deterrent measure for the management of future customers.

In July 2023 Ofgem opened compliance engagement with OVO Energy’s licensed supply companies 2 (OVO) due to serious concerns regarding the resolution of Citizens Advice Extra Help Unit 3 (EHU) consumer complaints and the implementation of Energy Ombudsman 4 (EO) remedies.

The EHU, which assists vulnerable customers, reported that OVO accounted for a significant volume of its open casework and was an outlier for cases left open for too long without resolution. Despite the EHU engaging with OVO regarding its complaint performance, OVO struggled to effectively organise and manage the complaints.

The EO was concerned that OVO had problems implementing EO remedies in respect of complaints referred to it and, despite engagement by the EO, this situation became progressively worse over time.

We expect all suppliers to treat customers fairly and work swiftly to resolve issues once they are raised. When customers have a problem, it is important that suppliers take steps to put things right. We expect that all customer complaints are received, handled, and processed in a timely and efficient manner in accordance with the relevant regulations and OVO's standard licence conditions (SLC).

Ofgem takes customer service and complaints resolution very seriously and we were concerned by the lack of timely progress made by OVO towards resolving these issues.

Ofgem engaged closely with OVO to understand the extent and the root cause of the issues. OVO identified the broad root causes as limitations in operational controls, data visibility, staff tenure and manual complaint handling. We required OVO to provide a remediation plan to stem the flow of complaints, address and resolve complaints efficiently and prevent them from becoming aged and to prioritise addressing the outstanding complaints referred to OVO by the EHU and the overdue EO remedies.

Following our engagement, OVO reviewed its systems and processes and identified and addressed the deficiencies that led to the issues, including appointing sufficient senior oversight staff and implementing reporting procedures. OVO identified 1,395 customers, including 706 vulnerable customers, whose complaints has not been dealt with in a timely manner or whose complaints’ resolutions, as mandated by the EO, had not been implemented. OVO is in the process of paying compensation, amounting to £378,512 directly to the affected customers and, on 6 September 2024, paid £2 million to the Energy Industry Voluntary Redress Scheme in recognition of the severity of the customer detriment caused by this issue and to reflect a deterrent measure for the management of future customers.

It is important that customer complaints are taken seriously and addressed in line with suppliers’ licence and regulatory obligations.

Suppliers must ensure that they have sufficient systems and resources to deal with complaints, and:

make it easy for a domestic customer to contact the licensee

act promptly and courteously to put things right when the licensee or any representative makes a mistake

otherwise ensure that customer service arrangements and processes are complete, thorough, fit for purpose and transparent

In relation to domestic customers in vulnerable situations, licensees must:

seek to identify each domestic customer in a vulnerable situation, in a manner which is effective and appropriate, having regard to the interests of the domestic customer

when applying the Standards of Conduct, do so in a manner which takes into account domestic customers identified as being in a vulnerable situation

Suppliers must ensure that they have and maintain robust internal capability, systems and processes to enable them to:

efficiently and effectively serve each of its customers

efficiently and effectively identify likely risks of consumer harm and to mitigate any such risks

comply with relevant legislative and regulatory obligations

In determining the appropriate action against supplier non-compliance, we take into account whether suppliers self-report, the extent of their engagement with us through the compliance process and their past performance and behaviours.

[1] OVO Electricity Ltd (06858121); OVO Gas Ltd (06752915); OVO (S) Gas Ltd (02716495)

[2] A service managed by Citizens Advice Scotland, advocating on behalf of vulnerable energy consumers across Great Britain

[3] The Energy Ombudsman provides independent dispute resolution services

[4] SLC 0 and SLC 4A of the gas and electricity supply licences and Regulation 7(1)(a) and (b) of the Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008

The case on Ofgem's site

29 Aug 2024: Ofgem Decision: investigation into Drax Power Limited

Type as published: Enforcement case. Published 29 Aug 2024. Status as published: Closed.

Decision of the Gas and Electricity Markets Authority to close its investigation into Drax Power Limited

On 31 May 2023, Ofgem opened an investigation into whether Drax Power Limited (“Drax”) was in breach of annual profiling reporting requirements relating to the Renewables Obligations (“RO”) scheme and other related matters.

The investigation focused on the data governance and controls Drax had in place to inform its reporting of profiling data to Ofgem in order to comply with its obligations under the Renewables Obligation Order 2015 (“ROO”).

This document sets out the findings of Ofgem’s investigation, actions taken by Drax to resolve the issues and our reasons for closing the investigation through the agreement of alternative action.

The investigation was not focused on the issuance of Renewables Obligation Certificates (“ROCs”) to Drax and our findings do not suggest that there would have been any impact on the level of subsidy Drax received under the RO scheme.

1. Background

1.1 The Renewables Obligation (“RO”) is a government scheme designed to support large-scale renewable electricity generation in the UK by helping to support the generation of electricity in the UK from renewable sources. The RO scheme places an obligation on suppliers in the UK to present Ofgem with a specified number of Renewables Obligation Certificates (“ROCs”) per MWh of electricity supplied, which they obtain from accredited generators. The obligation is set annually.

1.2 Drax Power Station is accredited under the RO scheme for the use of biomass in the generation of renewable electricity. Under the RO scheme, Drax is required to report to Ofgem on the types of biomass that it has used.

1.3 Annual profiling data is the reporting of ‘additional biomass characteristics’ and is not used for the issuing of ROCs. Under the RO scheme created by ROO, Drax claims ROCs in respect of electricity generated from woody biomass that meets the greenhouse gas criteria and the land criteria. In the 2023/24 year Drax was issued 9,279,992 ROCs at an estimated value of £548 million. During this investigation, we did not find any evidence to suggest that Drax have been issued with ROCs incorrectly.

2. Investigation outcome

2.1 The investigation concluded that there was an absence of adequate data governance and controls in place that had contributed to: (i) Drax misreporting data in relation to their annual profiling submission to Ofgem for compliance period 1 April 2021 to 31 March 2022 (“CP20”); and (ii) Drax being unable to provide Ofgem with sufficient evidence demonstrating how its CP20 annual profiling submission had been arrived at and unable to support the reliability of its profiling data reporting of forestry type and sawlogs for Canadian consignments for that same period.

2.2 This amounted to two breaches under Articles 82(4), 78, 80(1) of the ROO and SLC 13 read with its Conditions of Accreditation in respect of profile data reporting and in respect of responding to requests for information from Ofgem.

2.3 Therefore, whilst we have not found evidence to suggest deliberate misreporting, having considered the available evidence we have concluded that Drax failed in complying with its profiling data obligations under the RO scheme.

2.4 Ofgem takes the importance of accurate data reporting very seriously, in this case by a company of significant size and a major scheme participant. Accurate information is important for a number of reasons, including helping to improve statistics on biomass use and to monitor the effects of biomass use on the areas of origin. This information is intended to enable the Secretary of State to understand and monitor the extent to which both primary forests and sawlogs are used in woody biomass, which has consequences for carbon emissions and biodiversity. This is particularly the case for areas where energy companies are receiving considerable energy consumer support as a consequence of a Government environmental scheme. We publish information on annual biomass use under the RO scheme on our website.

2.5 Ofgem is entitled to expect Drax to provide accurate information on which its determination was made in relation to profiling data. Energy companies must have the appropriate data governance and controls in place to support the reporting of profiling data to Ofgem.

2.6 We consider that this investigation is suitable for resolution via alternative action, as per our Enforcement Guidelines.

2.7 Drax has engaged constructively with the case team during the investigation and will continue to engage with Ofgem in this regard following closure of the investigation. Ofgem assessed this as appropriate because:

Drax has accepted the findings of the investigation set out at para 2.1,

Drax has agreed to re-report their CP20 annual profiling submission in respect of forestry type and saw log proportions and,

Drax has confirmed it has updated its policies and procedures around the reporting requirements relating to data profiling under the RO; however, it will commission an independent external audit of the profiling data from its international supply chain and its profiling data reporting for the compliance period 1 April 2023 to 31 March 2024 (referred to as CP22). This audit will cover 98% of Drax’s supply chain. Ofgem will hold Drax accountable for the delivery of this audit which aims to provide Ofgem with the assurance of the accuracy of its future reporting. The findings of the audit will be published.

2.8 This decision is subject to Drax submitting a payment to Ofgem’s Voluntary Redress Fund by no later than 28 days from the date of this letter, in the amount of £25,000,000.00.

Notes to Editors

1. The Renewables Obligation (RO) is a government scheme designed to support large-scale renewable electricity generation in the UK. The RO scheme places an obligation on suppliers in the UK to provide Ofgem with a specified number of Renewables Obligation Certificates (ROCs) per MWh of electricity supplied, which they obtain from accredited generators. The obligation is set annually.

2. Drax Power Station is accredited under the RO scheme for the use of biomass in the generation of renewable electricity. Under the RO scheme, Drax is required to report to Ofgem on the types of biomass that it has used.

3. Under the RO scheme, Drax claims ROCs in respect of electricity generated from woody biomass that meets the greenhouse gas criteria and the land criteria. In the 2023/24 year Drax was issued 9,279,992 ROCs at an estimated value of £548 million.

4. The investigation did not find any evidence suggesting that Drax does not meet the government’s threshold that a minimum of 70% of biomass must come from sustainable sources in order to receive scheme funding. Under the ROO, Drax provided an independent annual sustainability audit report for CP20 which provided assurance that reporting has been accurate in relation to the land and greenhouse gas emission criteria.

5. This means that we did not find any evidence to suggest that Drax has been issued with ROCs incorrectly. The investigation found that the misreported data was technical in nature and would not have impacted the level of subsidy Drax received under the RO scheme.

6. Annual profiling data is used by the relevant authorities to monitor the sector and to inform future policy. It may also be used for statistics, responding to queries from the public and for publications. We will also publish a summary of this information alongside the RO Annual Report.

The case on Ofgem's site

12 Aug 2024: Provisional Order - Maxen Power Supply Limited

Type as published: Enforcement case. Published 12 Aug 2024. Status as published: Provisional Order closed.

On 7 August 2024, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989 and Section 28(7)(c) of the Gas Act 1986. The Authority is satisfied that Maxen Power Supply Ltd have taken the steps necessary in order to comply with the requirements set out within the provisional order.

On 10 May 2024, the Gas and Electricity Authority (“the Authority”) issued a Provisional Order with respect to apparent contraventions by Maxen Power Supply Limited (“Maxen Power”) in accordance with section 25(2) of the Electricity Act 1989 and 28(2) of the Gas Act 1986. It appears to the Authority that Maxen Power is contravening or is likely to contravene Standard Licence Conditions (“SLCs”) 0A and 4A of its Gas and Electricity Supply Licences.

This follows an ongoing Enforcement investigation into Maxen Power opened in November 2023. The Authority is concerned that Maxen Power does not have the capability to comply with its relevant legislative and regulatory obligations and that they are not treating customers in the manner required.

The Provisional Order sets out the actions that Maxen Power is now required to take to improve its compliance position. These actions include not taking on any new customers whilst the order is in place and commissioning a full independent audit of its processes.

Further details of the rationale for issuing the Provisional Order are explained within the Notice of Reasons.

The case on Ofgem's site

19 Jul 2024: British Gas, EDF, E.ON, Octopus, OVO and Scottish Power: smart meter issues

Type as published: Compliance case. Published 19 Jul 2024. Closed 13 Nov 2026. Status as published: Closed.

We have now concluded our compliance engagement with suppliers in relation to smart meters not operating in smart mode. This does not mean that all non-operating smart meters have been resolved. We are satisfied that suppliers have made sufficient progress or provided sufficient assurance on the action they are taking for us to close this specific compliance activity. Performance will continue to be monitored through the new smart metering framework, and we will consider further regulatory action where evidence of consumer harm or compliance concerns arises.

We have also finished our compliance engagement with all energy suppliers to install smart meters under the Post 2020 targets framework. We have assessed energy suppliers’ performance against those requirements.

We are no longer undertaking compliance engagement with any of the energy suppliers under this case. This outcome does not imply that Ofgem will not take further action should future concerns arise under successor frameworks or other relevant licence obligations.

We have undertaken compliance engagement with British Gas, EDF, E.ON, Octopus including Bulb energy, OVO and Scottish Power relating to their smart meter installation obligations and smart meters already installed but not operating in smart mode.

This compliance engagement will examine whether these suppliers are in compliance with the requirements of Standard Licence Conditions (SLC) 39A and 49 of the Electricity Supply Licence and 33A and 43 of the Gas Supply Licence and, if not, how they can bring themselves into compliance as soon as possible.

SLCs 39A of the Electricity Supply Licence and 33A of the Gas Supply Licence relate to suppliers installing a set number of qualifying smart meters between 1 January and 31 December each year, from 2022 until 2025, (known as the Targets Framework). Ofgem monitors performance against these targets on an annual basis.

SLCs 49 of the Electricity Supply Licence and 43 of the Gas Supply Licence relate to suppliers taking all reasonable steps to ensure that smart meters already installed operate in smart mode.

The opening of these compliance cases does not imply that Ofgem has made any findings about non-compliance by British Gas, EDF, E.ON, Octopus, OVO and Scottish Power. As with any compliance engagement, the outcome could range from a decision that there is no need for any further action through to the opening of an enforcement investigation, if appropriate.

The case on Ofgem's site

19 Jul 2024: Investigation into Community Energy Scheme UK Ltd and Community Energy Scheme Stoke Ltd's compliance with consumer protection legislation

Type as published: Enforcement case. Published 19 Jul 2024. Status as published: Closed.

Case closure - 19 July 2024

On 27 October 2023, Ofgem announced that it had accepted actions Community Energy Scheme UK Ltd (“CES”) and Community Energy Scheme Stoke Limited (“CESS”) had proposed to take to address key concerns regarding sales practices conducted up to September 2019, existing and new contracts signed by consumers and billing information provided to consumers about charges applied and whether charges are estimated.

Since October 2023, Ofgem has been monitoring the implementation of the agreed actions. CES/CESS has provided information showing that the agreed actions have been completed and, therefore, Ofgem has decided to close the investigation.

Based on the agreed actions:

Some consumers that signed up to the Community Energy Scheme (the “Scheme”) prior to 30 September 2019 had a one-off opportunity to leave the Scheme for free. These consumers received a letter from CES/CESS noting that if they decided to leave the Scheme, they would have 90 days to communicate their decision to CES/CESS. These consumers then had, from the date they communicated their decision to CES/CESS, 150 days to contact CES/CESS and agree an appointment to allow CES/CESS to re-configure the solar photovoltaic (“PV”) system. Consumers also had to pay or agree a payment plan for any outstanding bill for solar electricity they had consumed. No individual claims or unilateral demands of any kind were discussed or agreed in relation to this action.

Those consumers who decided to accept the one-off opportunity to leave the Scheme for free had their solar PV system re-configured and are no longer part of the Scheme.

Information provided by CES/CESS indicates that a small number of consumers communicated their decision to accept the one-off opportunity leave the Scheme for free, but did not engage with CES/CESS to arrange an appointment to reconfigure the solar PV system within 150 days. These consumers therefore remain in the Scheme.

CES/CESS would ensure that contracts signed by consumers reflected legal requirements by adding a termination clause. This included the existing contracts of consumers who signed up to the Scheme before 30 September 2019 and not accepted the one-off opportunity to leave the Scheme for free, as well as the existing contracts of consumers who signed up to the Scheme after 30 September 2019.

All existing and new contracts have been amended to include a new termination clause, allowing consumers to leave the Scheme at any time by paying a termination fee. The termination fee was calculated by CES/CESS based on the characteristics of the solar PV system installed and would be reduced for each of the remainder of the contract.

CES/CESS has amended the bill format of monthly, quarterly and final bills with the aim of providing clear information on whether the bill is an estimated or actual bill, what the charges are, and the amount owed or in credit. These changes were introduced in September 2023. We consider that having this information should help consumers understand their solar energy consumption and/or raise any queries or complaints with CES/CESS. Information provided by CES/CESS also shows that monthly and quarterly bills have been issued regularly since October 2023.

Ofgem considers the implemented actions have had the effect of achieving a similar outcome to that the Authority may have obtained by exercising its enforcement powers to seek a court order or formal undertakings.

If consumers require any assistance in dealing with the Scheme, they should contact the Citizens Advice consumer service to seek advice on the conduct of CES and CESS. The Citizens Advice consumer service provides free, confidential and impartial advice on consumer issues, including energy.

[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]

Case Update – 27 October 2023

On 20 August 2021, Ofgem announced the opening of the investigation to consider whether Community Energy Scheme UK Ltd (CES) has contravened consumer protection legislation through its sales and customer service practices.

CES operates the Community Energy Scheme (the “Scheme”) whereby it installs solar photovoltaic (PV) panels on the roofs of social housing in Stoke-on-Trent and sells the electricity from these panels to the tenants.

In December 2022, the scope of the investigation was widened to include Community Energy Scheme Stoke Limited (‘CESS’), another legal entity contracting with consumers.

After a thorough examination of relevant law, and the evidence gathered during the investigation, Ofgem has used the powers that were available to the Authority to tackle current concerns related to the Scheme.

As a result, following Ofgem’s investigation, CES and CESS have offered to implement actions that we consider will address key concerns regarding sales practices conducted up to September 2019. CES and CESS have also agreed to amend existing and new contracts signed by consumers, adding a termination clause which will allow consumers to leave the Scheme at any time (by paying a termination fee calculated on the characteristics of the Solar PV system installed and whose amount reduces for each of the remaining years of the contract). CES and CESS have also amended their bill format to provide clear information to consumers about charges applied and whether charges are estimated.

The offered actions will remedy key concerns identified during the investigation and will ensure contracts signed by consumers reflect legal requirements. Therefore, Ofgem has decided to accept them.

Based on the agreed actions:

Some consumers that have signed up to the Community Energy Scheme prior to 30 September 2019 will have a one-off opportunity to leave the Scheme for free. These consumers will receive a letter from CES/CESS within 30 days of this announcement, i.e. by 27 November 2023, and will have to decide if they want to leave the Scheme. a) If they decide to leave the Scheme, they will have 90 days to communicate their decision to CES/CESS. They will then have 150 days to contact CES/CESS and agree an appointment to allow CES/CESS to re-configure the Solar PV system. Consumers will also have to pay or agree a payment plan for any outstanding bill for solar electricity they have consumed. b) If these consumers decide they want to remain part of the Scheme, they will have their contract amended to include a new termination clause. CES/CESS considers that the easiest and best way to achieve this result would be for consumers to sign up a revised contract which will include the new termination clause. However, CES/CESS have also agreed that if consumers remain part of the Scheme but do not sign the revised contract, their existing contract will still be considered amended to include the new termination clause.

Consumers that have signed up to the Scheme after September 2019 will receive a letter within 30 days of this announcement, i.e. by 27 November 2023, with the effect to amend their contract to include a new termination clause. The letter will ask them to sign up a revised contract that includes the new termination clause. However, if consumers do not sign the revised contract, their existing contract will still be considered amended to include the new termination clause.

CES and CESS have amended the bill format of monthly, quarterly and final bills with the aim of providing clear information on whether the bill is an estimated or actual bill, what the charges are, and the amount owed or in credit. These changes were introduced fully in September 2023. CES and CESS will also continue working to ensure monthly and quarterly bills are issued regularly.

Given the circumstances of the case, Ofgem considers that these actions will have the effect of achieving a similar outcome to that the Authority may obtain by exercising its enforcement powers to seek a court order or formal undertakings. Therefore, Ofgem has decided to accept the offered actions. The case will remaining open for the sole purpose of monitoring implementation of the agreed actions and, when these are completed, the case will be formally closed.

The case on Ofgem's site

30 May 2024: Investigation into SEPD and its compliance with its obligations under SLCs 10, 10AA and 30 of its electricity distribution licence

Type as published: Enforcement case. Published 30 May 2024. Status as published: Closed.

Ofgem has decided to close, by way of alternative action, its investigation into Southern Electric Power Distribution Plc’s (SEPD) compliance with Standard Licence Conditions (“SLC”) 10.2, 10.3, 10.4, 10.5 (Priority Services Register), 10AA.2, 10AA.3, 10AA.4(a), 10AA.4(b)(i), 10AA.4(d)(ii) and 10AA.5 (Treating Customers Fairly) and SLC30.1 (Availability of Resources) of its Electricity Distribution Licence.

SEPD is the electricity distribution network operator for Central Southern England.

The decision was made as a consequence of SEPD’s offer to make improvements to its vulnerable customer processes. In addition, SEPD will make voluntary donations to local charities - £75,000 to Citizens Advice Portsmouth and £75,000 to Citizens Advice Hampshire.

This agreement, coupled with the actions taken by SEPD to improve the customer journey for its vulnerable consumers, now concludes this matter.

The case on Ofgem's site

28 May 2024: Compliance of Beatrice Offshore Windfarm Limited with the TCLC

Type as published: Enforcement case. Published 28 May 2024. Status as published: Closed.

Following a period of compliance engagement with Ofgem, Beatrice Offshore Windfarm Limited (BOWL) has accepted that it breached condition 20A of the Electricity Generation Standard Licence Conditions (known as the Transmission Constraint Licence Condition, or TCLC). As an alternative to Ofgem opening a formal enforcement investigation into the matter, BOWL has made immediate changes to its bid pricing policy and agreed to make a payment of £33.14 million into the redress fund.

A transmission constraint is defined in the TCLC as any limit on the ability of the national electricity transmission system, or any part of it, to transmit the power supplied onto the system to the location where the demand for that power is situated. In order to manage transmission constraints, the electricity system operator (ESO) routinely uses the balancing mechanism (BM) to increase and decrease the amount of electricity produced by different generators.

Typically, when managing a transmission constraint, the ESO will only have a limited number of alternatives available to it. This creates a risk that generators could exploit their position by charging excessive bid prices to reduce their output in constraint periods. The TCLC prohibits them from doing so.

BOWL is the owner of the 588MW Beatrice offshore wind farm in northern Scotland. The unit is located behind several key thermal transmission constraint boundaries, and since 2021 has regularly had bids accepted in the BM to reduce its output and to ensure that the relevant transfer limits are not exceeded.

BOWL holds an Investment Contract (an early form of the Contract for Difference (CfD)), guaranteeing it a fixed level of income for the power that it generates. Where wholesale power prices are below the relevant “strike price” and intermittent CfD units like Beatrice receive instructions from the ESO to reduce their output, the generator loses the subsidy top up that it would otherwise have received under its CfD. Typically generators seek to pass this additional cost of being curtailed through to the ESO via the bid prices that they submit in the BM, to ensure that they are not left worse off as a result of having a bid accepted.

Conversely, where CfD units have a bid accepted and wholesale power prices are above the strike price, generators continue to receive income for the power that they would have produced if they had not been curtailed, but no longer have to make a repayment under the CfD scheme. This became an increasingly common occurrence in the second half of 2021 and across 2022, as wholesale prices reached historic highs. Where such avoided repayments are not factored into bids, this will result in the generator receiving an additional benefit from being curtailed.

In light of concerns around BOWL’s approach to bid pricing in periods with high wholesale prices, we initiated a review looking at whether BOWL was likely to have received an excessive benefit from reducing generation during transmission constraint periods as a result of the bid prices the licensee submitted in the BM. Our review identified some significant concerns, in particular:

In the period, BOWL placed a cap on its bid prices – ie a minimum amount that it would charge the ESO for a reduction in generation in £/MWh, irrespective of the costs or benefits of having a bid accepted. The effect of this cap was that, when wholesale prices rose, BOWL was able to capture a large part of the avoided repayments to the Low Carbon Contracts Company (LCCC), rather than passing those savings back to consumers via less expensive bid prices (and so, ultimately, reduced balancing charges). This led to a substantial profit for the generator in financial years 2021 and 2022.

BOWL’s approach to estimating the costs it expected to incur when it had a bid accepted carried a risk of it recovering more revenue via its bid prices than was necessary to cover the costs incurred as a result of curtailment. In particular, the non-marginal cost component of BOWL’s bid prices was set by benchmarking against the bid prices of other generators, without any attempt made to estimate the current or future costs that were actually being incurred as a result of curtailment. BOWL has submitted that in its view estimating these costs was not possible at the time given the limitation of available data and that it was therefore necessary, in BOWL’s view, to use comparable generator analysis to seek compliance with the TCLC. While we recognise that the company may have legitimately faced some uncertainty around the costs of reducing its output – especially in the period immediately following commissioning – in our view this should not have prevented it from making any attempt to estimate its incurred and expected costs using the information that was available to it in the period; and

That BOWL did not give meaningful consideration to its compliance with the requirements of the TCLC, or to document the limited consideration that it did give its compliance with these requirements.

Had BOWL submitted bid prices in the period which were fully reflective of the avoided repayments to the LCCC where it was curtailed due to a transmission constraint, we consider that this would have led to substantively lower balancing costs for consumers. As was the case in our similar review into the conduct of Dorenell Windfarm Limited, it is possible (and BOWL has submitted) that under certain conditions this could also have caused Beatrice to be curtailed ahead of thermal generation, which could in principle have created economic inefficiency and led to negative environmental consequences (in that demand would then have been met by a lesser amount of renewable energy). Work is ongoing to consider a modification to the Balancing and Settlement Code which is related to potential distortions in the merit order arising from the interaction between the design of the BM and the CfD scheme.

BOWL has co-operated fully with Ofgem in its enquiries, and sought to resolve the matter quickly once informed of our concerns. This includes making immediate changes to its bid pricing policy, and agreeing to make a payment into the consumer redress fund. BOWL has told Ofgem that in its view the breach was inadvertent and that at the time of submitting the bid prices, it had considered that it was compliant.

In light of the extent of the consumer detriment and financial gain that we consider BOWL’s approach to bid pricing is likely to have given rise to, we have required as a condition of the matter being resolved without formal enforcement action that BOWL should make a payment of £33,140,000. The payment will be made to Ofgem’s consumer redress fund.

Taking into account BOWL’s acceptance of the breach, the steps it has taken to avoid future reoccurrence of a breach and the redress it has agreed to pay, Ofgem has now closed this matter without the need for a formal enforcement action under the Electricity Act 1989, in line with the “Alternative Action” process described in our Enforcement Guidelines .

The case on Ofgem's site

10 May 2024: Farringdon Energy limited: fair treatment and operational capability

Type as published: Enforcement case. Published 10 May 2024. Status as published: Closed.

Our investigation found that Farringdon Energy Limited broke standard licence conditions (SLCs), including:

0A Treating Non-Domestic Customers Fairly

4A Operational Capability

4C Ongoing Fit and Proper requirements

5 Provision of information to the Authority

7A Supply to Micro Business Consumers

19C Customer supply continuity plans

21B Billing based on meter readings

21BA Backbilling

As a result of the investigation, Farringdon has agreed to:

admit that they contravened SLCs 0A, 4A, 4C, 5, 7A, 19C, 21B, and 21BA

pay £525,000 into Ofgem's voluntary redress fund, in addition to the £214,000 penalty previously paid for the provisional order

accept enhanced monitoring by Ofgem for a period of 12 months

undertake two independent audits, one at the start of enhanced monitoring and one at the end, with terms of reference being agreed by Ofgem

The company kept advance payments from customers as "Early Termination Fees" without supplying energy, sent inaccurate bills, and inappropriately back billed customers. The company also failed to provide information to us when asked.

We found that Farringdon Energy Ltd did not have the right processes and procedures in place to treat customers fairly or to bill them correctly and on time.

Responsibility for running the company day-to-day sat entirely with one director, and the investigation found serious and ongoing mismanagement and breaches of the SLCs as a result. Following negotiations, the director accepted that the company had been mismanaged and agreed to step down from the board after acknowledging that they failed the fit and proper requirements. They also agreed not to take a position of Senior Managerial Responsibility or Influence at Farringdon Energy Ltd or any other regulated energy company in the future.

Farringdon fully cooperated with our investigation and has made improvements.

On 9 May 2024, Ofgem launched an investigation into whether Farringdon Energy Ltd., trading as Champion Energy Ltd., (“Farringdon”), were complying with SLCs 0A (Fair Treatment of Microbusinesses) and 4A (Operational Capability).

Farringdon Energy Ltd. is a UK based non-domestic energy supplier with their registered office in Essex, England.

On 9 May 2024 we also issued a Provisional Order to Farringdon as it appeared that they were contravening, or likely to contravene, SLC 4A.1(a) and 4A.1(b).

On 6 November 2024, the scope of the investigation expanded to include SLCs 4C (Ongoing Fit and Proper Requirement), 5 (Provision of Information to the Authority and Data Retention), 21B (Billing Based on Meter Readings), and 21BA (Back Billing). Ofgem also proposed a financial penalty on Farringdon requiring it to pay £223,676.00 for breaching SLC 4A, in relation to the Provisional Order.

On 16 June 2025 Ofgem confirmed its proposal to impose a financial penalty on Farringdon , requiring it to pay £214,580.00 for breaching SLC 4A, operational capability. The penalty was in addition to £9,096.00 of goodwill payments made by Farringdon to affected customers.

The case on Ofgem's site

11 Mar 2024: Scotia Gas Network Gas (SGN) group: decision to accept commitments offered

Type as published: Enforcement case. Published 11 Mar 2024. Status as published: Closed.

On 2 December 2025, following our statutory consultation, we have decided to accept the binding commitments from the SGN Group. We received one representation in response to our consultation, in support of the proposed commitments. The Commitments address the competition concerns that we had provisionally identified during the course of the investigation. The Commitments will take effect from the Effective Date, 2 December 2025, and will remain in force for a period of five years from that date. Ofgem notes that entering into of Commitments does not constitute a finding of any infringement(s) by Ofgem or the admission of any infringement(s) by the SGN Group.

The case on Ofgem's site

4 Mar 2024: Compliance of Dorenell Windfarm Limited with the TCLC

Type as published: Compliance case. Published 4 Mar 2024. Status as published: Closed.

Following a period of compliance engagement with Ofgem, Dorenell Windfarm Limited (DWL) has accepted it unintentionally (in DWL’s view) breached condition 20A of the Electricity Generation Standard Licence Conditions (known as the Transmission Constraint Licence Condition, or TCLC). As an alternative to Ofgem taking formal enforcement action, DWL has agreed to make a payment of £5.53 million into the redress fund in respect of the breach.

A transmission constraint is defined in the TCLC as any limit on the ability of the national electricity transmission system, or any part of it, to transmit the power supplied onto the system to the location where the demand for that power is situated. In order to manage transmission constraints, the electricity system operator (ESO) routinely uses the balancing mechanism (BM) to increase and decrease the amount of electricity produced by different generators.

Typically, when managing a transmission constraint, the ESO will only have a limited number of alternatives available to it. This creates a risk that generators could exploit their position by charging excessive bid prices to reduce their output in constraint periods. The TCLC prohibits them from doing so.

DWL is the owner of the 177MW Dorenell wind farm in northern Scotland. The unit is located behind several key thermal transmission constraint boundaries, and since 2020 has regularly had bids accepted in the BM to reduce its output and to ensure that the relevant transfer limits are not exceeded.

DWL holds a contract under the Contracts for Difference (CfD) scheme, guaranteeing it a fixed level of income for the power that it generates. Where wholesale power prices are below the relevant “strike price” and intermittent CfD units like Dorenell receive instructions from the ESO to reduce their output, the generator loses the subsidy top up that it would otherwise have received under its CfD. Typically generators seek to pass this additional cost of being curtailed through to the ESO via the bid prices that they submit in the BM, to ensure that they are not left worse off as a result of having a bid accepted.

Conversely, where CfD units have a bid accepted and wholesale power prices are above the strike price, generators no longer have to make a repayment under the CfD scheme. This has been an increasingly common occurrence since late 2021 as wholesale prices have reached historic highs. Where such avoided repayments are not factored into bids, this will result in the generator receiving an additional benefit from being curtailed.

In light of concerns around DWL’s approach to bid pricing in periods with high wholesale prices, we initiated a review looking at whether the prices the licensee charged in the BM in transmission constraint periods were likely to have been excessive when considered in the context of the costs and benefits that it might reasonably have expected to incur when reducing output at Dorenell. Our review identified some significant concerns, in particular:

That DWL’s strategy was to place a cap on its bid prices – ie a maximum bid amount in £/MWh that it would submit, irrespective of the costs or benefits of having a bid accepted. The effect of this cap was that, where wholesale prices rose, DWL was able to capture a large part of the avoided repayments to the Low Carbon Contracts Company (LCCC), rather than passing those savings back to consumers via less expensive bid prices (and so, ultimately, reduced balancing charges). This led to a substantial windfall profit for the generator in financial years 2021 and 2022.

That DWL’s approach to estimating the costs it expected to incur when it had a bid accepted appeared likely to lead to it recovering more revenue via its bid prices than was necessary to cover the costs incurred as a result of curtailment. In particular, its failure to update forward looking assumptions about likely curtailment volumes based on experience following commissioning is likely to have led to an over-recovery of fixed administration costs. DWL also included in its methodology a profit margin allowance which appeared likely to result in a profit that would be above what we would consider reasonable.

Had DWL submitted bid prices in the period which were fully reflective of the avoided repayments to the LCCC where it was curtailed due to a transmission constraint, we consider that this would have led to substantively lower balancing costs for consumers. It is possible (and DWL has submitted) that under certain conditions this could also have caused Dorenell to be curtailed ahead of thermal generation, which could in principle have created economic inefficiency and led to negative environmental consequences (in that demand would then have been met by a lesser amount of renewable energy). The purpose of the TCLC is limited to ensuring that licensees that are subject to a transmission constraint do not obtain an excessive profit by virtue of their market power. However, we note the work that is ongoing to consider a modification to the Balancing and Settlement Code which is related to potential distortions in the merit order arising from the interaction between the design of the BM and the CfD scheme, and we will follow the progress of that modification with interest. [1]

Our review shows that DWL did give detailed consideration to the requirements of the TCLC when setting its bid prices (including considering the different costs and benefits of being bid down establishing a methodology for estimating those costs and benefits, and documenting that process). While it now accepts Ofgem’s position that its approach was not compliant with the TCLC, DWL has told us that at the time of submitting the bid prices, it considered that it was acting in compliance with the TCLC due to the existence of a number of factors which in its view justified imposing a cap on its bid prices, in line with DWL’s interpretation of the available guidance on the TCLC at the time. This included what it saw as the potential environmental benefit of avoiding being bid down ahead of thermal generation (albeit in practice the ESO’s balancing requirements were often such that Dorenell was frequently bid down alongside thermal generation, despite its bid price cap), as well as certain other operational concerns specific to DWL.

DWL has co-operated fully with the Authority in its enquiries, and sought to resolve the matter quickly once informed of our concerns. This includes making immediate changes to its bid pricing policy, and agreeing to make a payment in respect of the breach. DWL maintains that the breach was inadvertent and was not in any way motivated by the intention to obtain an excessive benefit.

In light of the extent of the consumer detriment that we consider DWL’s approach to bid pricing is likely to have given rise to, we have required as a condition of the matter being resolved without formal enforcement action that DWL should make a payment that is equal to what would likely be the maximum amount payable under the relevant legislation were DWL to have been found to have breached the TCLC following a formal investigation – ie 10% of its expected turnover for 2023 at the time of engaging in discussions with Ofgem, or £5,530,000. The payment will be made to Ofgem’s consumer redress fund.

Taking into account DWL’s acceptance of the breach, the steps it has taken to avoid future reoccurrence of a breach and the redress it has agreed to pay, Ofgem has now closed this matter without the need for a full investigation.

[1] P462 'The removal of subsidies from Bid Prices in the Balancing Mechanism’ - Elexon BSC

The case on Ofgem's site

27 Feb 2024: Investigation into Utilita Energy Limited and its compliance with rules relating to the detection and prevention of energy theft and operational capability

Type as published: Enforcement case. Published 27 Feb 2024. Status as published: Open.

Ofgem is investigating whether Utilita Energy Limited (Utilita) is in compliance with Standard Licence Conditions (SLCs) 4A, 11B, 12 and 12A of its Electricity Supply Licence.

These SLCs relate to Operational Capability (SLC 4A), the Retail Energy Code (SLC 11B), Matters relating to Electricity Meters (SLC 12), and Matters relating to Theft of Electricity (SLC 12A).

Utilita is a domestic and non-domestic energy supplier based in Hampshire.

The opening of this investigation does not imply that we have made any findings of non-compliance by Utilita.

The Authority has widened the scope of this investigation to include SLCs 4A, 11, and 12A of Utilita’s Gas Supply Licence.

These SLCs relate to Operational Capability (SLC 4A), the Retail Energy Code (SLC 11), and Matters relating to Theft of Gas (SLC 12A).

Ofgem has notified Utilita of the Authority’s decision to expand the scope of the investigation.

The widening of the scope of this investigation does not imply that we have made any findings of non-compliance.

The case on Ofgem's site

7 Dec 2023: Notice of penalty - EP SHB Limited

Type as published: Enforcement case. Published 7 Dec 2023.

Decision for (as Ofgem words it): Investigation into EP SHB Limited’s compliance with the TCLC

Following a detailed investigation, Ofgem has decided to impose a financial penalty on EP SHB Limited (EPSHB), requiring it to pay £23.63 million for breaching its generation licence in a way that unfairly raised consumers’ bills. Full details of our decision can be found in the decision notice, linked below.

The penalty relates to our finding that EPSHB secured an excessive benefit as a consequence of prices it submitted in the Balancing Mechanism during periods where what is known as a ‘transmission constraint’ occurred.

More specifically, Ofgem’s investigation found that between October 2019 and May 2021, EPSHB breached the Transmission Constraint Licence Condition (TCLC) by submitting excessive bid prices at its South Humber Bank gas-fired power station (SHBA) during periods when the ESO needed it to lower its output.

This reduction in SHBA’s output was required due to the risk to consumers’ supply should a fault have suddenly disconnected the Lincolnshire facility from the transmission system.

The breach resulted in significantly higher costs being incurred by the Electricity System Operator (the ESO) to balance the system, ultimately increasing costs for consumers.

The large sum proposed – to be paid to Ofgem’s Energy Redress Fund, which supports energy-related charities and community projects that help vulnerable consumers – reflects the scale of the excessive payments secured by EPSHB and the extended period of the breach.

No representations were received in response to our notice of 13 October 2023 setting out our intention to impose the penalty on EPSHB. We remain of the view that a breach of the TCLC has occurred, and that the level of the proposed penalty is appropriate.

This investigation is part of the ongoing compliance work undertaken by Ofgem to ensure that the market is fair for everyone. Ofgem expects licensees to be fully aware of their legal obligations (including compliance with the TCLC) and have adequate procedures in place to prevent breaches from occurring.

The case on Ofgem's site

1 Dec 2023: Investigation into Tomato Energy Limited (formerly Logicor Energy Limited) and its compliance with its obligations under SLCs 4A and 5 of the Electricity Licence

Type as published: Enforcement case. Published 1 Dec 2023. Status as published: Closed.

On 16 November 2023, Ofgem opened an investigation into whether Tomato Energy was in compliance with Standard Licence Conditions ("SLC") SLC 4A and 5 of the Electricity Supply Licence.

These SLC’s relate to Operational Capability (SLC 4A) and the Provision of Information to Authority and Data Retention (SLC 5).

The below sets out the findings of Ofgem’s investigation, actions taken by Tomato Energy to resolve the issues and our reasons for closing the investigation by way of Alternative Action on payments being made to Ofgem’s Voluntary Redress Fund (administered by the Energy Saving Trust ) in accordance with our Enforcement Guidelines rather than impose a financial penalty.

Tomato Energy Limited is a UK based domestic and non-domestic energy supplier based in Hampshire.

Ofgem’s investigation into Tomato Energy focused on the following:

processes and procedures in place to comply with regulatory requests for information

process and procedures in place to effectively ensure operational capability

ability to respond to information requests to the required standard as set out in the Standard Licensing Conditions

The investigation concluded that Tomato Energy acted in contravention of SLCs 4A and 5 in respect to Tomato Energy’s:

reliance on a third party, acting under a White Label Agreement, to provide consumers with appropriate levels of protection from harm

incorrect migration of consumers on fixed term tariffs to variable rate tariffs before the end date of their fixed term agreement

failure to interpret the SLC’s (incorrectly charging consumers at Standard Credit (“SC”) rates instead of Direct Debit (“DD”) rates)

having insufficient processes and procedures in place to comply with regulatory requests for information

having insufficient process and procedures in place to effectively ensure operational capability

an inability to supply information in a timely manner when requested by Ofgem, and the submission of inaccurate, incomplete and conflicting information

Ofgem takes the fair treatment of customers very seriously. During this investigation, it became apparent that Tomato Energy had significant gaps in their customer service procedures which exposed customers to an increased risk of harm.

Tomato Energy proactively and constructively engaged with Ofgem and has identified and/or rectified process gaps during the investigation. As a result:

Tomato Energy has accepted the findings of the investigation

Tomato Energy has submitted a payment of £1,500,000 to Ofgem’s Energy Industry Voluntary Redress Fund

Tomato Energy has agreed to make Consumers Redress payments to affected consumers within thirty days amounting to £50 per consumer for those affected by the incorrect migration from a fixed term tariff to a variable rate tariff and £10 per consumer for those notionally effected by the misapplication of Standard Credit rates instead of Direct Debit rates

Closure of this investigation has no impact on, and should not be associated with, the Provisional Order served to Tomato Energy on 10 April 2025.

The case on Ofgem's site