Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Ofgem compliance and enforcement cases, page 3 of 17

Cases 31 to 45 of 252, newest first, each in Ofgem's words. What this list is and is not, and how it was read, are on the first page of the list.

The status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.

Cases 31 to 45 of 252. Page 3 of 17. Every row is on one of these pages.

9 Nov 2023: Investigation into Scottish Power Limited’s Smart Meter Roll Out 2019

Type as published: Enforcement case. Published 9 Nov 2023. Status as published: Closed.

Ofgem has decided to close its investigation into Scottish Power’s compliance with Standard Licence Conditions (“SLC”) 38 of the Gas Supply Licence and SLC 44 of the Electricity Supply Licence, relating to the 2019 smart meter rollout period and resolve the matter by way of Alternative Action. The decision was taken in accordance with our Enforcement Guidelines .

SLCs 38 and 44 require a licensee to set and achieve Annual Milestones for the installation of smart meters.

Whilst, as is usual in cases resolved by Alternative Action, there has been no formal finding of breach, Scottish Power has agreed to make a voluntary payment of £440,000 into the Energy Industry Voluntary Redress Fund .

The case on Ofgem's site

13 Oct 2023: Investigation into EP SHB Limited’s compliance with the TCLC

Type as published: Enforcement case. Published 13 Oct 2023. Closed 7 Dec 2023. Status as published: Closed.

Decision (as Ofgem words it): Notice of penalty - EP SHB Limited

On 4 October 2021, Ofgem opened an investigation into whether EP SHB Limited ("EPSHB", the owner and operator of South Humber Bank gas-fired power station) failed to comply with the requirements of condition 20A of the Electricity Generation Standard Licence Conditions (known as the Transmission Constraint Licence Condition, or “TCLC ”).

A transmission constraint is defined in the TCLC as any limit on the ability of the national electricity transmission system, or any part of it, to transmit the power supplied onto the system to the location where the demand for that power is situated. In order to manage transmission constraints, the electricity system operator (“ESO”) routinely uses the balancing mechanism (“BM”) to increase and decrease the amount of electricity produced by different generators.

Typically, when managing a transmission constraint, the ESO will only have a limited number of alternatives available to it. This creates a risk that generators could exploit their position by charging excessive bid prices to reduce their output. The TCLC prohibits them from doing so.

Following a detailed investigation, Ofgem found that between October 2019 and May 2021 EPSHB breached the TCLC by submitting excessive bid prices at its South Humber Bank power station during periods when the ESO needed it to lower its output. This reduction in South Humber Bank’s output was required due to the risk to consumers’ supply should a fault have suddenly disconnected the Lincolnshire facility from the transmission system. EPSHB's excessive prices in this period resulted in significantly higher costs being incurred by the ESO to balance the system, ultimately increasing costs for consumers.

On 13 October 2023 we published notice that we intended to require the company to pay £23.63 million into the Energy Redress Fund as a consequence of the breach (a link to this notice is provided below). On 7 December 2023, having considered representations received in response to that notice, Ofgem confirmed its decision , closing the investigation. EPSHB is required to make the payment no later than 18 January 2024.

The case on Ofgem's site

26 Sep 2023: Investigation into BES Commercial Electricity Ltd and Business Energy Solutions Ltd and their compliance with SLC 7.3 of their Electricity Supply Licence and Gas Supply Licence

Type as published: Enforcement case. Published 26 Sep 2023. Status as published: Open.

We are investigating whether BES Commercial Electricity Ltd and Business Energy Solutions Ltd (together BES) are taking all reasonable steps to ensure the terms of their Deemed Contracts are not unduly onerous.

We opened this investigation on 25 September 2023.

In August 2024, BES rebranded their energy supply companies to Ruby Electricity Ltd and Ruby Gas Ltd (together Ruby).

Ruby are a UK based non-domestic utilities supplier based in Lancashire.

On 23 September 2025, we expanded the scope of the investigation to include SLC 0A, which relates to treating non-domestic customers fairly.

Neither the opening nor expansion of this investigation implies that we have made any findings about Ruby.

The case on Ofgem's site

23 Aug 2023: Finding that Morgan Stanley & Co. International plc has breached Regulation 8 of the Electricity and Gas (Market Integrity and Transparency) (Enforcement etc.) Regulations 2013 (the REMIT Enforcement Regulations)

Type as published: Enforcement case. Published 23 Aug 2023.

The Gas and Electricity Markets Authority (“ the Authority ”) takes breaches of REMIT and breaches of the REMIT Enforcement Regulations very seriously.

[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]

“ REMIT ” is Regulation (EU) No 1227/2011 on wholesale energy market integrity and transparency and is retained in UK law by effect of the European Union (Withdrawal) Act 2018 and amended by the Electricity and Gas (Market Integrity and Transparency) (Amendment) (EU Exit) Regulations 2019 (SI 2019/534).

The Electricity and Gas (Market Integrity and Transparency) (Enforcement etc.) Regulations 2013 (“ the REMIT Enforcement Regulations ”) provide the Authority with the powers to sanction any failure to comply with REMIT requirements, and any failure to comply with a requirement of Regulation 8 of the REMIT Enforcement Regulations.

Compliance with the requirements of Regulation 8 of the REMIT Enforcement Regulations, which includes the obligation on Relevant Persons to record and retain relevant communications, as defined by Regulation 8(2) in the REMIT Enforcement Regulations (“ Relevant Communications ”) 1 , is critical to ensuring that the Authority is able to fully investigate and enforce any failure to comply with REMIT requirements. This is essential to ensuring that energy consumers and wholesale energy market participants have confidence in the integrity of the market.

The Authority has found that MSIP breached Regulation 8 of the REMIT Enforcement Regulations because it failed to take reasonable steps, in accordance with Regulation 8(6) of the REMIT Enforcement Regulations, to prevent the making, sending or receiving of any Relevant Communications, in this case WhatsApp instant messages, that it could not ensure were recorded and retained, and by failing to take reasonable steps to ensure that any Relevant Communications were recorded and retained in accordance with Regulation 8(3) of the REMIT Enforcement Regulations.

The Authority finds that by the end of March 2020 MSIP was no longer in breach of Regulation 8. The steps MSIP took to remedy its non-compliance included: providing training to employees which reinforced the prohibition on the use of WhatsApp; taking internal action over the use of WhatsApp by employees; and launching an internal investigation into the use of WhatsApp and other non-Company approved messaging systems.

In these circumstances, and mindful of its duty to monitor the integrity and transparency of wholesale energy market, the Authority has considered it appropriate to impose a financial penalty of £7,730,213 on MSIP in respect of its breach of Regulation 8 of the REMIT Enforcement Regulations.

Recognising that MSIP has admitted it breached Regulation 8 of the REMIT Enforcement Regulations and has agreed to settle this matter during the settlement window, the Authority has discounted the penalty by 30% in accordance with its REMIT Penalties Statement published on 23 June 2015. Accordingly, the penalty is reduced to £5,411,149.

Dated: 17 August 2023

Gas and Electricity Markets Authority

1 Regulation 8(2) of the Enforcement Regulations defines a relevant communication as “ any telephone or electronic communication made for the direct or indirect purpose of entering into any transaction in wholesale energy products. ”

The case on Ofgem's site

21 Aug 2023: Ofgem opens compliance engagement in respect of OVO's complaints handling process

Type as published: Enforcement case. Published 21 Aug 2023.

Ofgem has opened compliance engagement with OVO Energy’s licensed supply companies 1 (OVO) due to serious concerns regarding the resolution of Citizens Advice Extra Help Unit (EHU) consumer complaints (a service managed by Citizens Advice Scotland, advocating on behalf of vulnerable energy consumers across GB) and the implementation of Energy Ombudsman (EO) remedies.

Ofgem engages regularly with the EHU and EO. Recently both organisations have raised concerns with Ofgem regarding matters relating to the handling and resolution of complaints by OVO.

The EO is concerned that OVO has problems implementing EO remedies in respect of complaints referred to it. We understand that, despite engagement by the EO, this situation became progressively worse over time.

The EHU, which assists vulnerable customers, reported that OVO accounted for a significant volume of its open cases and is an outlier for aged cases. Despite the EHU having ongoing discussions with OVO regarding its complaint management performance, OVO appear to have struggled to effectively organise and manage the complaints.

We expect all suppliers to treat customers fairly and work swiftly to resolve issues once they are raised. When customers have a problem, it is important that suppliers take steps to put things right. We expect that all customer complaints are received, handled, and processed in a timely and efficient manner in accordance the relevant regulations and OVO’s licence obligations. 2

Ofgem takes customer service and complaints handling very seriously and is disappointed with the lack of progress made by OVO towards resolving these issues.

Consequently, we have intervened, working closely with OVO to assess any detriment that there may be to customers and have set clear expectations and improvement targets. We have requested detailed reporting on a range of complaint metrics and set OVO the objective of addressing all outstanding complaints, implementing all outstanding EO decisions, while reducing complaint resolution times and the volume of referrals made to the EHU and EO.

OVO has assured us that they take complaints resolution seriously and is working to improve its complaint and referral processes.

Based on our interactions with OVO, we are confident that our intervention has resulted in more focus being placed on improving this area. However, if we do not see improvements in OVO’s performance we will consider taking further steps, including the possibility of enforcement action.

The opening of this compliance case does not imply that Ofgem has made any findings about non-compliance by OVO. Ofgem will report in due course on the findings. As with any compliance engagement, the outcome could range from a decision that there is no need for any further action through to the opening of an enforcement investigation, if appropriate.

1 OVO (S) Electricity ltd; OVO Electricity Ltd; OVO (S) Gas Ltd; and OVO Gas Ltd. 2 7(1)(a) and (b) of The Gas and Electricity (Consumer Complaints Handling Standards) Regulations 2008 and SLCs 0, 4A, and 5 of the gas and electricity supply licences.

The case on Ofgem's site

25 Jul 2023: Notice of penalty - SSE Generation Limited

Type as published: Enforcement case. Published 25 Jul 2023.

Decision for (as Ofgem words it): Investigation into SSE Generation Limited’s compliance with the TCLC

Following a detailed investigation, Ofgem has decided to impose a financial penalty on SSE Generation Limited (SSE), requiring it to pay £9.78 million in relation to a breach of its Generation Licence. Full details of our decision can be found in the decision notice, linked below.

The penalty relates to our finding that SSE secured excessive payments from the Electricity System Operator (“ESO”) during periods of what is known as ‘transmission constraint.’ In order to meet our electricity needs, power must get from where it is produced to where it is consumed. Where constraints on the transmission system exist, then the ESO will take action to manage flows across the network, including using the balancing market to increase and decrease the amount of electricity produced by different generators.

Situations which could cause transmission constraints might, for example, include where there is insufficient network capacity to transport power out of a particular area in which local generation exceeds demand.

Typically, when managing a transmission constraint, the ESO will only have a limited number of alternatives available to it. This creates a risk that generators could exploit their position by charging the ESO excessive prices to reduce their output. The Transmission Constraint Licence Condition (or “TCLC”) prohibits them from doing so.

In October 2021, Ofgem opened an investigation into SSE’s compliance with the TCLC in relation to Foyers pumped storage power station, which is located in Northern Scotland and regularly operates in transmission constraint periods. Ofgem has found that:

In May 2020 SSE took the decision to make the bid prices it charged the ESO to reduce Foyers’ output significantly more expensive – including in periods of transmission constraint.

This change was made to bring Foyers in line with what it believed was the market practice of other pumped storage operators, and to increase profit.

Following the change, SSE’s prices were set with reference to the prices of selected other generators frequently bid down due to a constraint, rather than the costs and benefits of being bid down. Its revised prices were expensive relative to several relevant comparators, and were not compliant with the TCLC.

The bids submitted resulted in higher balancing charges, ultimately increasing costs for consumers.

Ofgem has not seen any evidence which suggests that the breach was deliberate, that is that SSE changed its pricing strategy for Foyers knowing that the revised strategy would breach the TCLC. However Ofgem considers that it should have been clear to SSE (including senior management) that its revised approach carried a significant risk of breaching the TCLC.

As part of the resolution of the investigation, SSE has committed to put in place a new pricing methodology designed to properly reflect the costs and benefits to SSE of reducing its generation at Foyers.

SSE co-operated and engaged constructively during the investigation and expressed a willingness to settle the case. By settling this investigation early, the company has qualified for a discount compared to the £11.58m it would otherwise have been required to pay.

A single response was received to our notice of 6 June 2023 setting out our intention to impose a penalty on SSE. We have considered this response carefully, and for the reasons set out in the decision notice linked below, we remain of the view that our approach to assessing the excessiveness of SSE’s bid prices is correct, and that a breach of the TCLC has occurred.

This investigation is part of the ongoing compliance work undertaken by Ofgem to ensure that the market is fair for everyone. Ofgem expects licensees to be fully aware of their legal obligations (including compliance with the TCLC) and have adequate procedures in place to prevent breaches from occurring.

The case on Ofgem's site

21 Jul 2023: Foxglove Energy Supply Ltd: Proposal to make a Final Order

Type as published: Enforcement case. Published 21 Jul 2023.

On 9 June 2023 the Authority issued a Notice of Proposal to issue a Final Order (“FO”) on Foxglove Energy Supply Ltd (“Foxglove”) under section 26(1) and (2) of the Electricity Act 1989 (the “Electricity Act”) and section 29(1) and (2) of the Gas Act 1986 (the “Gas Act”). The Authority was satisfied that Foxglove was contravening and was likely to continue to contravene Standard Licence Condition (“SLC”) 4A. The particular behaviour of concern giving rise to the proposed FO was that Foxglove had consistently failed to respond accurately or on time to the Authority’s Requests for Information issued under SLC 5 of the electricity and gas supply licences. The Authority noted the representations received in the context of the consultation undertaken pursuant to section 26(1) of the Electricity Act and section 29(1) of the Gas Act. On 21 July 2023, the Authority concluded that Foxglove had improved its operational capability such that it was able to respond accurately and on time to any Requests for Information from the Authority. Therefore, on 21 July 2023, the Authority made a decision not to make a FO.

On 13 June 2023, the Authority issued a notice of proposal to make a final order on Foxglove Energy Supply Ltd (“Foxglove”) in accordance with section 26(1) of the Electricity Act 1989 and section 29(1) of the Gas Act 1986. The behaviour of concern giving rise to the proposal is that Foxglove is contravening or is likely to contravene the operational principle (Standard Licence Condition 4A). Any representations or objections with respect to this notice of proposal to make a final order are to be made to the Authority by 4 July 2023.

The case on Ofgem's site

21 Jul 2023: Foxglove Energy Supply Ltd: Provisional Order July 2022

Type as published: Enforcement case. Published 21 Jul 2023. Status as published: Provisional Order closed.

On 21 July 2023, the Authority made a Revocation Order in accordance with section 25(7)(c) of the Electricity Act 1989 and Section 28(7)(c) of the Gas Act 1986. The Authority is now satisfied that the provision/s made by the confirmed provisional order are no longer requisite for the purpose of securing Foxglove’s compliance with SLC 4B. As such, the provisional order is no longer in place.

On 13 June 2023, the Authority decided to publish its notice of proposal to revoke the confirmed provisional order, dated 4 October 2022, imposed on Foxglove. The Authority is now satisfied that the provision/s made by the confirmed provisional order are no longer requisite for the purpose of securing Foxglove’s compliance with SLC 4B. The Authority gave this notice in accordance with section 26(6) of the Electricity Act and section 29(5) of the Gas Act. Any representations or objections with respect to this notice of proposal to revoke the confirmed provisional order are to be made to the Authority by 11 July 2023.

On 5 December 2022 the Authority issued Foxglove with a Notice of failure to comply with a confirmed Provisional Order within the meaning of section 25 of the Electricity Act 1989 and section 28 of the Gas Act 1986.

The notice provided Foxglove with written notice, pursuant to Schedule 2(1)(c)(i) of the Electricity Supply Licence and Schedule 2(1)(c)(i) of the Gas Supply Licence, of failure to comply with the Provisional Order, confirmed with modification issued to Foxglove on 6 October 2022 and published on 11 October 2022.

The notice further explained that if this failure was not rectified to the satisfaction of the Authority within three months of Foxglove receiving the notice, the Authority may at any time revoke Foxglove’s electricity and gas licences subject to giving no less than 30 days’ notice.

On 11 October 2022, the Authority published the confirmation of the provisional order dated 5 July 2022, with modifications, issued to Foxglove, following the consultation period.

The Authority noted the representations received in the context of the consultation undertaken pursuant to section 26(1) of the Electricity Act 1989 and section 29(1) of the Gas Act 1986. It considered these representations carefully and is satisfied that Foxglove is contravening or is likely to contravene the financial responsibility principle (Standard Licence Condition 4B) and that no further modifications were required to the provisional order.

This confirmed provisional order requires that Foxglove address our concerns quickly and fully. Until such time as it does, the provisional order requires that Foxglove refrains from taking on new customers and removing any money from the business unless it constitutes spending essential to the operation of Foxglove’s supply business, is required to be made by virtue of a legal requirement or is otherwise approved in writing by the Authority.

Further details are contained in the order itself and the Notice of Reasons, below.

On 9 September 2022 the Authority issued its notice of proposal to confirm the provisional order dated 5 July 2022, with modifications, imposed on Foxglove on the grounds that Foxglove was contravening or is likely to contravene the financial responsibility principle (Standard Licence Condition 4B). The Notice of Proposal invited representations or objections from Foxglove in relation to the proposed confirmation by 30 October 2022. The Authority decided that the only person likely to be affected was Foxglove and therefore, in accordance with section 26(2)(a) of the Electricity Act 1989 and section 29(2)(a) of the Gas Act 1986, the notice was only issued to Foxglove.

On 5 July 2022, the Authority issued a provisional order to Foxglove Energy Supply Ltd (Foxglove) in accordance with Section 25(2) of the Electricity Act 1989 and Section 28(2) of the Gas Act 1986.

The Authority considered that Foxglove is contravening or is likely to contravene the financial responsibility principle (Standard Licence Condition 4B).

The particular behaviour of concern giving rise to the making of the provisional order was that Foxglove:

Was not at all times managing responsibly costs that could be Mutualised;

Was not taking appropriate action to minimise such costs; and

Did not have adequate financial arrangements in place to meet its costs at risk of being Mutualised.

The provisional order required Foxglove to address our concerns quickly and fully. Until such time as it did, the provisional order banned Foxglove from taking on new customers and removing any money from the business unless it constituted spending essential to the operation of Foxglove’s supply business.

The case on Ofgem's site

6 Jun 2023: Notice of proposed penalty - SSE Generation Limited

Type as published: Enforcement case. Published 6 Jun 2023.

This document gives notice of our intention to impose a penalty on SSE Generation Limited ("SSE") in relation to a breach of its obligations under the electricity generation licence (Standard Licence Condition 20A, known as the Transmission Constraint Licence Condition, or “TCLC”). Our investigation was opened in October 2021, and concerns the bid prices submitted by SSE in the Balancing Mechanism for Foyers pumped storage power station. In May 2020 SSE took the decision to make the bid prices it charged the electricity system operator to reduce Foyers’ output significantly more expensive – including in periods of transmission constraint. We have concluded that the bids submitted resulted in SSE obtaining a profit which was significantly greater than that which it would have obtained absent the transmission constraint, and so was in breach of the TCLC. As a consequence, Ofgem proposes to require the company to pay £9.78 million into the Energy Redress Fund. Any written representations or objections to Ofgem’s proposal must be received no later than 27 June 2023 and will be considered prior to Ofgem reaching its final decision on whether to impose a penalty on SSE.

The case on Ofgem's site

23 May 2023: OVO Energy: prepayment meter practices

Type as published: Enforcement case. Published 23 May 2023. Status as published: Closed.

OVO has agreed to a settlement package which includes a payment of £7 million into Ofgem’s Voluntary Redress Fund.

It will also pay a total of £3.4 million to some of its highest risk customers and those on the Priority Services Register. It will do so by either giving credit or paying off energy debt.

OVO has already paid over £100,000 in compensation as part of the prepayment meter Market Compliance Review framework. Additionally, OVO is paying £1.1 million to customers in the Scottish Highlands and Islands who did not have appropriate access to engineer support.

The case on Ofgem's site

18 May 2023: OVO Energy Limited to pay £2,000,000 for Energy Price Guarantee overcharging

Type as published: Enforcement case. Published 18 May 2023.

OVO Energy Limited has refunded and compensated 10,987 customer accounts it has overcharged due to not applying the Energy Price Guarantee discount. The total amount of customer detriment to be refunded is £1,492,917. Refunds will be issued via a rebilling exercise that will be issued automatically to affected customers.

In addition, the supplier has paid £498,838 in goodwill payments to affected customers, and a further £10,000 into Ofgem’s voluntary consumer redress fund for reporting failings, equating to a total package of £2,001,755.

In November 2022, OVO Energy Limited self-reported to Ofgem that it had identified a number of customers that may have had incorrect rates applied to tariffs. In December 2022, OVO Energy Limited confirmed that operational errors with the implementation of the Energy Price Guarantee discount to its tariffs were present and would work with Ofgem to identify all customers impacted and implement fixes. In March 2023, OVO Energy Limited confirmed it had overcharged 10,987 customers for varying periods of time between October 2022 and March 2023. The result of this issue was that almost 11,000 customers paid above the maximum rates allowed under the Energy Price Guarantee. The average amount being refunded to affected customers is £135. OVO Energy Limited also provided goodwill payments, with the amount of goodwill varying, depending on the size of overcharge. Affected customers on the Priority Services Register (PSR), who are more likely to be in vulnerable circumstances, will also receive a greater share of goodwill.

Suppliers must be vigilant and ensure that all eligible customers, particularly those who may be in vulnerable circumstances, are protected by the Energy Price Guarantee. Where issues are identified, we expect suppliers to act quickly to provide a resolution and to engage Ofgem on the steps they are taking to put things right. In determining this redress package, we have considered the additional financial hardship that this issue may have placed on customers, especially as the Energy Price Guarantee is designed to help customers manage energy prices at high levels.

When introducing the Energy Price Guarantee, Ofgem provided suppliers with a regulatory easement letter stating that it would take a pragmatic and proportionate approach to compliance taking into account the speed at which the scheme was introduced to limit consumer bills. Whilst this issue represents a serious matter, considering OVO Energy Limited promptly reported the issue, and moved quickly to put in place steps to resolve the issues, Ofgem has decided not to take formal enforcement action or require a substantive contribution to the voluntary redress fund on this occasion. Ofgem’s priority was to ensure affected customers were rectified and offered sufficient goodwill. Had OVO Energy Limited not quickly engaged on the issue and resolved in a timely manner – the redress package sought would have been considerably higher.

The £10,000 payment into Ofgem’s voluntary consumer redress fund reflects errors provided to Ofgem in response to a mandatory RFI. We remind all suppliers we take seriously the obligations in place to provide requested data accurately, and in a timely manner. This is necessary to ensure we have the information we need to conduct our regulatory functions.

Ofgem closely monitors all suppliers’ implementation of the Energy Price Guarantee, this redress package reflects the pragmatic approach we promised due to the speed of implementation but now the scheme is established we will continue to hold suppliers to account if they do not meet their obligations.

Notes to editors:

Ofgem’s Redress Fund is operated on its behalf by the Energy Saving Trust and allows companies to pay a sum of money to appropriate charities, trusts, organisations or consumers as a result of breaches of licence conditions. Information on the Energy Saving Trust can be found here: Funded Energy Redress Projects .

The case on Ofgem's site

17 May 2023: Three suppliers pay total of £8 million in relation to 'Guaranteed Standards of Performance' Final Billing Compensation failures

Type as published: Compliance case. Published 17 May 2023. Status as published: Closed.

Ofgem has concluded compliance engagement with three suppliers in relation to their application of the Guaranteed Standards of Performance (GSOP).

The GSOP regulations require suppliers to meet certain standards of performance for their customers, such as providing them a final bill within six weeks if they choose to move to a new supplier. If a supplier fails to meet this standard, then they must provide an affected customer, a 'Standard' compensation payment of £30. If the supplier fails to compensate the customer in a timely manner (within the first 10 working days after the six week period), then the customer is due an 'Additional Standard' GSOP compensation payment of £30.

In total, E.On Next, Good Energy and Octopus Energy either missed or unduly delayed Guaranteed Standards of Performance compensation payments due to consumers worth £6,305,925. Over 100,000 customers were affected by these issues. Ofgem has worked with these suppliers to ensure all affected consumers received the payments to which they were entitled, as well as additional compensation of £1.7million to customers or the Energy Industry Voluntary Redress Scheme (EIVRS).

The suppliers involved did not issue a final bill to affected customers within six weeks and they did not compensate these customers for this failure within a timely manner. Some customers waited more than a year to receive this compensation. In addition, suppliers failed to make an 'Additional Standard' compensatory payment of £30 that was due to these customers, within the allowed 10 working day period after the date the ’Standard’ compensation payment was due. The problems occurred because the suppliers' billing processes and systems were not set up to deliver the Guaranteed Standard of Performance payments in line with the timeframes set out in the Regulations. Following a self-report from E.On Next regarding GSOP compensation for final bills, Ofgem acted on the issues raised during further supplier engagement.

Ofgem takes compliance with the Guaranteed Standards of Performance regulations seriously, so that consumers can rely on final bills being produced quickly after they switch supplier and receive compensation where their supplier fails to do so. It is important that suppliers follow these rules, including those that govern the provision of statutory GSOP and 'Additional' compensation, and to ensure all compensation is provided to customers within a timely manner.

These rules are set out on the government’s legislation website: The Electricity and Gas (Standards of Performance) (Suppliers) Regulations 2015 and The Electricity and Gas (Standards of Performance) (Suppliers) (Amendment) Regulations 2020 .

The suppliers involved have updated their billing processes and systems to resolve the issues and ensure payments will now be made in line with the Regulations. In addition to securing payment of the appropriate compensation payments, Ofgem also secured additional redress for consumers to recognise the impact of not receiving their original compensation on time.

It is important that suppliers clearly understand the Guaranteed Standards of Performance (GSOP) regulations, including those that govern the provision of statutory GSOP compensation payments, and that they ensure their systems provide these payments at the point of failure to meet a Guaranteed Standard of Performance, within a timely manner, and to the timeframes stipulated within the regulations.

If suppliers fail to compensate the customer in a timely manner (i.e. provide a 'Standard' compensation payment of £30 within the first 10 working days of the supplier's initial failure to achieve the relevant standard of performance) then they are obligated to provide the customer an 'Additional' GSOP compensatory payment of £30. Ofgem expects suppliers to make an 'Additional Standard' GSOP compensatory payment of £30 to those customers at the point of failure to meet their payment obligations outlined in Regulation 8 (2), i.e. within 10 working days of the date that the ‘Standard’ compensation payment was due.

Ofgem expects suppliers to have robust governance and risk management processes in place with the ability to identify and mitigate the risk of consumer detriment. Suppliers must ensure their systems, processes and practices are compliant with all regulatory requirements even when these only apply to a specific set of customers or only apply in specific circumstances.

Ofgem encourages and expects suppliers to self-report any possible non-compliance or customer detriment as a matter of good practice.

Ofgem has used a compliance approach in these cases and considers that that this alternative action will act as a deterrent to future non-compliance. Where any further non-compliance is identified, Ofgem will strongly consider taking formal action in accordance with our Enforcement Guidelines.

The redress packages from all suppliers involved are set out below.

Where it has not been possible to process redress in specific cases, the suppliers involved agreed to make payments to the Energy Industry Voluntary Redress Scheme (EIVRS). E.On Next has also paid £1,330,910 to the EIVRS in recognition of system failings and the inconvenience to customers receiving late GSOP compensation, in relation to delayed final bills. The EIVRS is administered by the Energy Saving Trust. They have been appointed by Ofgem to distribute payments from the fund to help support energy consumers in vulnerable situations.

The case on Ofgem's site

31 Mar 2023: Notice of decision to impose a financial penalty on Delta gas and power following our enforcement case into its compliance with the Renewable Obligation

Type as published: Enforcement case. Published 31 Mar 2023.

On 26 January 2023, the Gas and Electricity Markets Authority (“the Authority”) published a notice of proposal to impose a financial penalty of £100,000 (reduced to £70,000 for early resolution) on Delta Gas and Power Limited (Delta) for its failure to comply with Article 68 of the Renewables Obligation Order 2015 (as amended) (ROO).

Under Article 68 of the ROO, for compliance period 2021/2022, Delta was required to make a payment to discharge its Renewables Obligation to the Authority by the late payment deadline of 31 October 2022. Delta did not discharge its obligation in full by 31 October 2022, making its final payment on 25 November after being served with a statutory demand for the amount.

The Authority considered it appropriate to impose a financial penalty for this contravention. Representations or objections to the proposal were invited to be made to the Authority by 5pm on 16 February 2023.

The Authority received no representations or objections by this deadline and Delta confirmed in writing to the Authority their agreement to pay the reduced fee of £70,000 for early resolution.

Therefore, on 28 March 2023 the Authority decided to confirm its proposal to impose a financial penalty of £70,000 on Delta for its failure to comply with Article 68 of the ROO.

The Authority gives notice of its decision under section 27A (5) of the Electricity Act 1989. Further details can be found in the Notice of Decision to Impose a Financial Penalty.

The case on Ofgem's site

16 Mar 2023: Investigation into United Gas and Power Ltd’s billing and communications activities

Type as published: Enforcement case. Published 16 Mar 2023. Closed 21 Apr 2023. Status as published: Closed.

Decision (as Ofgem words it): Notice of decision to impose a financial penalty on United Gas and Power Ltd following our investigation into its billing and communication activities

The Gas and Electricity Markets Authority (“the Authority”) has confirmed its decision to impose a financial penalty on United Gas & Power Limited (“UGP”) for its failure to comply with Standard Licence Conditions (“SLCs”) 0A, 7A, 7B and 21.B of its Electricity and Gas Supply Licences. SLC 0A (the Non-Domestic Standards of Conduct) sets out specific obligations concerning the requirement to treat Micro Business Consumers (“MBCs”) fairly. SLC 7B was the previous iteration of SLC 0A and was superseded by SLC 0A on 10 October 2017. In this case the period of breach spanned both periods and hence both SLC 0A and 7B apply. SLC 7A.1 sets out specific obligations to take all reasonable steps to identify whether or not a Non-Domestic Customer is a MBC or not (or to deem that customer to be an MBC). SLC 7A.8 sets out specific obligations concerning the notification of MBC Contract terms and other information. SLC 21B.1 sets out specific obligations concerning the requirement to bill based on meter readings. The Authority considered it appropriate to impose a financial penalty for these contraventions and issued its Notice of intention to impose a financial penalty on UGP on 16 March 2023. There were no representations received in response to that publication. The Authority has decided to impose a financial penalty of £1 on UGP. This is in addition to £2,111,798.00 (less £1) that UGP has agreed to pay in voluntary redress. The redress will be paid into Ofgem’s Voluntary Redress Fund (administered by the Energy Saving Trust) and the money will be distributed to appropriate organisations for the benefit of energy consumers. Further details can be found in the final penalty notice (see the separate decision page linked to this investigation page).

The case on Ofgem's site

2 Feb 2023: British Gas - PPM Installations - Provisional Order

Type as published: Enforcement case. Published 2 Feb 2023. Status as published: Provisional Order closed.

On 2 February 2023, the Authority issued a Provisional Order to British Gas Trading Ltd. In accordance with section 25(2) of the Electricity and Act 1989 and section 28(2) of the Gas Act 1986.

The Authority has engaged with British Gas throughout the period of the Provisional Order being in place. The Authority has now accepted formal and legally enforceable undertakings from British Gas whereby British Gas has undertaken that it will not recommence installations of PPMs under a Relevant Warrant (or the remote switching of meters to pre-payment mode without customer consent), or disconnection of any Domestic Customers, for reasons of unpaid charges until 30 September 2023, or any earlier date of release agreed by the Authority.

The Authority shall agree to release British Gas from the undertaking before 30 September 2023. If British Gas demonstrates to the Authority’s reasonable satisfaction before 30 September 2023 that it will act in accordance with the Relevant SLCs and the new Code of Practice , it will be permitted to recommence installations of PPMs under a Relevant Warrant (or the remote switching of meters to pre-payment mode without customer consent), or disconnections of any Domestic Customers for reasons of unpaid charges.

ln light of the formal undertaking given by British Gas, the Authority will not confirm the Provisional Order, which will, under legislation, lapse on 2 May 2023. The wider investigation into PPM installations under a Relevant Warrant remains on-going

On 2 February 2023, the Gas and Electricity Markets Authority (“the Authority) issued a Provisional Order to British Gas Trading Ltd. (trading under: “British Gas”) (“BG”) in accordance with section 25(2) of the Electricity Act 1989 and 28(2) of the Gas Act 1986.

It appears to the Authority that BG is contravening or is likely to contravene Standard Licence Conditions 0, 13.1 (a) and (d), 27.11A, 28.1A, 28.1B and 28B.1. The behaviours that gave rise to these concerns (and resulted in the issuing of the Provisional Order) relate to BG’s procedures for installing of Prepayment Meters under a Relevant Warrant.

The Provisional Order sets out a number of actions for BG to complete by specified deadlines. These include the immediate cessation of the installation of PPMs under warrant, suspending disconnection of domestic customers for unpaid charges, and an independent audit. Full details are contained in the Provisional Order.

The case on Ofgem's site