Ofgem compliance and enforcement cases, page 5 of 17
Cases 61 to 75 of 252, newest first, each in Ofgem's words. What this list is and is not, and how it was read, are on the first page of the list.
Cases 61 to 75
Source stamp: OFGEM COMPLIANCE AND ENFORCEMENT CASES / RETRIEVED 24 NOV 2026 / NO LINK MADEThe status and every other word is Ofgem's, as it stood when we retrieved it. An open case is not a finding. We add no label to a case or a company, and no case is linked to a licence holder, a company page, a donation or a contract.
Cases 61 to 75 of 252. Page 5 of 17. Every row is on one of these pages.
24 Mar 2022: Investigation into National Grid Electricity Transmission plc and its compliance with obligations under Section 9 of the Electricity Act 1989 and SLC B7 of its Electricity Transmission Licence in relation to the Harker 132kV substation
Type as published: Enforcement case. Published 24 Mar 2022. Status as published: Closed.
Civil assets are the non-electrical assets at a substation, such as concrete foundations, plinths and support structures.
In accordance with our Enforcement Guidelines, Ofgem has decided to close this investigation by way of Alternative Action.
The decision to close this investigation was made as a consequence of NGET accepting that it had failed to adequately monitor, maintain and repair some civil assets at Harker, and Ofgem’s findings that NGET was thereby:
(a) failing to develop and maintain an efficient, co-ordinated and economical system of electricity transmission; and
(b) failing to have in place, or to apply properly, resources needed to ensure that it was at all times able to properly and efficiently carry on the transmission business and comply in all respects with its obligations under the Electricity Transmission licence and those parts of the Electricity act 1989 that relates to the transmission business,
as required by section 9(2) of the Electricity Act 1989 and SLC B7 of its Transmission Licence.
Section 9(2) of the Electricity Act 1989 imposes a general duty on the holder of a transmission licence to (a) develop and maintain an efficient, co-ordinated and economical system of electricity transmission; and (b) to facilitate competition in the supply and generation of electricity.
SLC B7 of a Transmission Licence states that ‘The licensee shall at all times act in a manner calculated to secure that it has available to it such resources, including (without limitation) management and financial resources, personnel, fixed and moveable assets, rights, licences, consents and facilities, on such terms and with all such rights, as shall ensure that it is at all times able: (a) to properly and efficiently carry on the transmission business; and (b) to comply in all respects with its obligations under this licence and such obligations under the Act as apply to the transmission business including, without limitation, its duty to develop and maintain an efficient, co-ordinated and economical system of electricity transmission’.
Ofgem’s decision to close this investigation is subject to NGET paying £20 million to Ofgem’s Energy Industry Voluntary Redress Scheme.
This agreed action by NGET now concludes this matter.
24 Feb 2022: Whoop Energy Limited: Provisional Order
Type as published: Enforcement case. Published 24 Feb 2022. Status as published: Provisional Order closed.
Whoop Energy Ltd ("Whoop Energy") ceased trading on 18 February 2022 and its licence to supply electricity was subsequently revoked. As a result, the provisional order issued to Whoop Energy on 21 September 2021 and confirmed on 16 December 2021 is no longer in effect.
Whoop Energy’s customers have been transferred to Yu Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem protects customers of Whoop Energy and Xcel Power Ltd .
Decision to confirm Provisional Order
On 16 December 2021, the Authority published the confirmation of the provisional order issued to Whoop Energy, following the consultation period. The consultation ended on 13 December 2021.
Whoop Energy failed to make its FIT Year 11 Annual Levelisation Payment of £3,780.22 by the deadline of 17 September 2021. No representations were received during the consultation period. The Authority was satisfied that Whoop Energy was contravening Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
Ofgem issued the provisional order on 21 September 2021. This provisional order required that Whoop Energy makes to pay the outstanding amount forthwith.
Notice of Proposal to Confirm Provisional Order
On 19 November 2021, the Authority published its notice of proposal to confirm the provisional order dated 21 September 2021 imposed on Whoop Energy on the grounds that Whoop Energy is contravening or is likely to contravene the requirements of SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33. The Authority proposed to confirm the order in the notice of proposal.
The Authority gave notice that in accordance with section 26(1) of the Electricity Act:
SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33 are the relevant conditions and requirements for the purpose of the provisional order;
The acts or omissions which, in the Authority’s opinion, constitute or would constitute contraventions of those conditions and requirements, and other factors which in the Authority’s opinion justify the confirmation of the provisional order are those set out in the Notice of proposal to confirm the provisional order.
[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]
The Authority would consider these representations and then make a final decision on whether to confirm the provisional order prior to 20 December 2021 (the date on which the provisional order would lapse if not confirmed).
Issue of Provisional Order
On 21 September 2021, the Authority issued a provisional order to Whoop Energy in accordance with section 25(2) of the Electricity Act 1989.
Whoop Energy is required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
Whoop Energy failed to make its FIT Year 11 Annual Levelisation Payment of £3,780.22 by the deadline of 17 September 2021.
The provisional order requires Whoop Energy to pay the outstanding amount forthwith.
Provisional orders are issued in certain circumstances in accordance with the EA89 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
On 24 September 2021, the Authority published a Notice of Reasons explaining in greater detail the rationale for issuing the provisional order.
- Whoop Energy Limited: Provisional Order 21 September 2021 [PDF, 562.99KB]
- Whoop Provisional Order - Notice of Reasons 24 September 2021 [PDF, 98.24KB]
- Notice of Proposal to confirm a Provisional Order Whoop Energy dated 19 November 2021 [PDF, 663.73KB]
- Whoop Energy- confirmed PO dated 15 December 2021 [PDF, 87.11KB]
- Whoop Energy- Notice of Reasons dated 15 December 2021 [PDF, 627.25KB]
24 Feb 2022: Whoop Energy Ltd: Final Order
Type as published: Enforcement case. Published 24 Feb 2022. Status as published: Final Order closed.
Whoop Energy Ltd ("Whoop Energy") ceased trading on 18 February 2022 and its licence to supply electricity was subsequently revoked. As a result, the final order issued to Whoop Energy on 28 October 2021 is no longer in effect.
Whoop Energy’s customers have been transferred to Yu Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem protects customers of Whoop Energy and Xcel Power Ltd .
Final orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding final orders is contained within our Enforcement Guidelines .
Whoop Energy failed to meet its Renewables Obligations (“RO”), by failing to produce Renewables Obligation Certificates to the Authority by 1 September 2021, or to make payments as an alternative by 31 August 2021, sufficient to discharge its RO, and failed to provide the Authority with sufficient assurances that it would meet the late payment deadline of 31 October 2021.
The final order required Whoop Energy to make a payment to the Authority in full settlement of its RO and ROS for the obligation period of 1 April 2020 to 31 March 2021, in the sum of £56,306.25, plus accrued interest, by no later than 31 October 2021.
For information relating to this final order, please see the documents below.
24 Feb 2022: Whoop Energy: Provisional Order
Type as published: Enforcement case. Published 24 Feb 2022. Status as published: Provisional Order closed.
Whoop Energy Ltd ("Whoop Energy") ceased trading on 18 February 2022 and its licence to supply electricity was subsequently revoked. As a result the confirmed provisional order issued to Whoop Energy on 12 November 2021 and confirmed on 24 January 2022 is no longer in effect.
Whoop Energy’s customers have been transferred to Yu Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem protects customers of Whoop Energy and Xcel Power Ltd .
Decision to confirm Provisional Order
On 26 January 2022, the Authority published the confirmation of the provisional order issued to Whoop Energy Ltd ("Whoop Energy"), following the consultation period. The consultation ended on 13 January 2022.
Whoop Energy failed to make its FIT Year 12 Quarter 2 Payment of £19,013.51 by the deadline of 10 November 2021. No representations were received during the consultation period. The Authority was satisfied that Whoop Energy was contravening Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
Ofgem issued the provisional order on 12 November 2021. This provisional order required that Whoop Energy pay the outstanding amount forthwith.
For more information, please see the Notice of Reasons document below, dated 24 January 2022.
Notice of Proposal to Confirm Provisional Order
On 16 December 2021, the Authority published its notice of proposal to confirm the provisional order dated 12 November 2021 imposed on Whoop Energy on the grounds that Whoop Energy is contravening or is likely to contravene the requirements of SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33. The Authority proposed to confirm the order in the notice of proposal.
The Authority gave notice that in accordance with section 26(1) of the Electricity Act:
SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33 are the relevant conditions and requirements for the purpose of the provisional order;
The acts or omissions which, in the Authority’s opinion, constitute or would constitute contraventions of those conditions and requirements, and other factors which in the Authority’s opinion justify the confirmation of the provisional order are those set out in the Notice of proposal to confirm the provisional order.
[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]
The Authority would consider these representations and then make a final decision on whether to confirm the provisional order prior to 11 February 2022 (the date on which the provisional order will lapse if not confirmed).
Issue of Provisional Order
On 12 November 2021, the Authority issued a provisional order to Whoop Energy in accordance with section 25(2) of the Electricity Act 1989.
Whoop Energy is required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
Whoop Energy failed to make its FIT Year 12 Quarter 2 Levelisation Payment of £19,013.51 by the deadline of 10 November 2021.
The provisional order required Whoop Energy to pay the outstanding amount forthwith.
Provisional orders are issued in certain circumstances in accordance with the EA89 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
On 12 November 2021, the Authority published a Notice of Reasons explaining in greater detail the rationale for issuing the provisional order.
- Provisional Order: Whoop Energy, dated 12 November 2021 [PDF, 71.31KB]
- Notice of Reasons: Whoop Energy, dated 12 November 2021 [PDF, 127.59KB]
- Whoop Energy Notice of Proposal to confirm a PO dated 15 December 2021 [PDF, 182.02KB]
- Confirmed Provisional Order Whoop Energy Ltd dated 24 January 2022 [PDF, 70.92KB]
- Notice of Reasons to confirm a PO Whoop Energy dated 24 January 2022 [PDF, 123.52KB]
1 Dec 2021: Entice Energy Supply Limited: Provisional Order
Type as published: Enforcement case. Published 1 Dec 2021. Status as published: Provisional Order closed.
Entice Energy Supply Limited (“Entice”) ceased trading on 25 November 2021 and subsequently its licences to supply gas and electricity were revoked. As a result, the provisions of the provisional order, issued to Entice on 28 October 2021, are no longer in effect.
Entice’s customers have been transferred to Scottish Power under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints Scottish Power to take on customers of Entice Energy and Orbit Energy | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
The particular behaviour of concern was that Entice failed to meet its Renewables Obligations (RO), because it did not produce Renewables Obligation Certificates to the Authority by 1 September 2021, or make payments as an alternative by 31 August 2021, sufficient to discharge its RO.
In September 2021, Entice provided assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2021. However, on 21 October 2021, Entice informed Ofgem that it would not be able to pay its RO in full by 31 October 2021.
The provisional order required Entice to make a payment to the Authority in full settlement of its RO for the obligation period of 1 April 2020 to 31 March 2021, in the sum of £152,252.10 for its RO and £21,671.65 for its ROS, plus accrued interest, by no later than 31 October 2021.
For information relating to this provisional order, please see the documents below.
1 Dec 2021: Orbit Energy Limited: Provisional Order
Type as published: Enforcement case. Published 1 Dec 2021. Status as published: Provisional Order closed.
Orbit Energy Limited (“Orbit”) ceased trading on 25 November 2021 and its licences to supply gas and electricity were subsequently revoked. As a result, the provisions of the provisional order, issued to Orbit on 12 November 2021, are no longer in effect.
Orbit’s customers have been transferred to Scottish Power under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints Scottish Power to take on customers of Entice Energy and Orbit Energy | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
Suppliers are required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
The provisional order was made following Orbit’s failure to make its FIT Year 12 Quarter 2 Levelisation Payment of £451,296.14 by the deadline of 10 November 2021.
For information relating to this provisional order, please see the documents below.
1 Dec 2021: Simply Your Energy (t/a Entice Energy): Provisional Order
Type as published: Enforcement case. Published 1 Dec 2021. Status as published: Provisional Order closed.
Simply Your Energy Limited (trading as Entice Energy Supply Limited) (“Entice”) ceased trading on 25 November 2021 and its licences to supply gas and electricity were subsequently revoked. As a result, the provisions of the provisional order, issued to Entice on 12 November 2021, are no longer in effect.
Entice’s customers have been transferred to Scottish Power under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints Scottish Power to take on customers of Entice Energy and Orbit Energy | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
Suppliers are required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
The provisional order was made following Entice’s failure to make its FIT Year 12 Quarter 2 Levelisation Payment of £28,353.75 by the deadline of 10 November 2021.
For information relating to this provisional order, please see the documents below.
24 Nov 2021: AmpowerUK Ltd: Final Order
Type as published: Enforcement case. Published 24 Nov 2021. Status as published: Final Order closed.
AmpowerUK Ltd (“Ampower”) ceased trading on 8 November 2021 and its licences to supply gas and electricity were revoked as of 7 November 2021. As a result, the provisions of the final order, issued to Ampower on 28 October 2021, are no longer in effect.
Ampower’s customers have been transferred to Yu Energy under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints new suppliers for customers of CNG Energy and CNG Electricity, MA Energy, Omni Energy, Bluegreen Energy, Zebra Power and Ampower | Ofgem
Final orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding final orders is contained within our Enforcement Guidelines .
Ampower failed to meet its Renewables Obligations (RO), by failing to produce Renewables Obligation Certificates to the Authority by 1 September 2021, or to make payments as an alternative by 31 August 2021, sufficient to discharge its RO, and failed to provide the Authority with sufficient assurances that it would meet the late payment deadline of 31 October 2021.
The final order required Ampower to make a payment to the Authority in full settlement of its RO and ROS for the obligation period of 1 April 2020 to 31 March 2021, in the sum of £3,590,236.65, plus accrued interest, by no later than 31 October 2021.
For information relating to this final order, please see the documents below.
24 Nov 2021: MA Energy Limited: Provisional Order
Type as published: Enforcement case. Published 24 Nov 2021. Status as published: Provisional Order closed.
MA Energy Limited (“MA Energy”) ceased trading on 8 November 2021 and its licences to supply gas and electricity were revoked on 7 November 2021. As a result, the provisions of the provisional order, issued to MA Energy on 28 October 2021, are no longer in effect.
MA Energy’s customers have been transferred to SmartestEnergy Business under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints new suppliers for customers of CNG Energy and CNG Electricity, MA Energy, Omni Energy, Bluegreen Energy, Zebra Power and Ampower | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
The particular behaviour of concern was that MA Energy failed to meet its Renewables Obligations (RO), because it did not produce Renewables Obligation Certificates to the Authority by 1 September 2021, or make payments as an alternative by 31 August 2021, sufficient to discharge its RO.
In September 2021, MA Energy provided assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2021. However, on 18 October 2021, MA Energy informed Ofgem that it would not be able to pay its RO in full by 31 October 2021.
The provisional order required MA Energy to make a payment to the Authority in full settlement of its RO for the obligation period of 1 April 2020 to 31 March 2021, in the sum of £941,835.25, plus accrued interest, by no later than 31 October 2021.
For information relating to this provisional order, please see the documents below.
24 Nov 2021: Neon Reef Limited: Provisional Order
Type as published: Enforcement case. Published 24 Nov 2021. Status as published: Provisional Order closed.
Neon Reef Limited (“Neon Reef”) ceased trading on 16 November 2021 and its licence to supply electricity was subsequently revoked. As a result, the provisions of the provisional order, issued to Neon Reef on 28 October 2021, are no longer in effect.
Neon Reef’s customers have been transferred to British Gas under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints British Gas to take on customers of Neon Reef Limited and Social Energy Supply Ltd | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
The particular behaviour of concern was that Neon Reef failed to meet its Renewables Obligations (RO), because it did not produce Renewables Obligation Certificates to the Authority by 1 September 2021, or make payments as an alternative by 31 August 2021, sufficient to discharge its RO.
In September 2021, Neon Reef provided assurance that it could and would be in a position to make the necessary payment, including applicable interest, by the late payment deadline of 31 October 2021.
After further correspondence, the Authority considered that Neon Reef may not have been in a position to make the necessary payment, plus applicable interest, by the late payment deadline of 31 October 2021.
The provisional order required Neon Reef to make a payment to the Authority in full settlement of its RO for the obligation period of 1 April 2020 to 31 March 2021, in the sum of £349,148.80, plus accrued interest, by no later than 31 October 2021.
For information relating to this provisional order, please see the documents below.
24 Nov 2021: Social Energy Supply Limited: Provisional Order
Type as published: Enforcement case. Published 24 Nov 2021. Status as published: Provisional Order closed.
Social Energy Supply Energy Limited (“Social Energy”) ceased trading on 16 November 2021 and its licences to supply gas and electricity were subsequently revoked. As a result, the provisions of the provisional order, issued to Social Energy on 12 November 2021, are no longer in effect.
Social Energy’s customers have been transferred to British Gas under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints British Gas to take on customers of Neon Reef Limited and Social Energy Supply Ltd | Ofgem
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
Suppliers are required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012.
The provisional order was made following Social Energy’s failure to make its FIT Year 12 Quarter 2 Levelisation Payment of £28,735.97 by the deadline of 10 November 2021.
For information relating to this provisional order, please see the documents below.
12 Nov 2021: Delta Gas and Power: Provisional Order
Type as published: Enforcement case. Published 12 Nov 2021. Status as published: Provisional Order closed.
Decision not to confirm the Provisional Order
On 26 January 2022, the Authority published its decision not to confirm the provisional order issued to Delta Gas and Power Limited (“Delta”), following the consultation period.
Delta made payment of its FIT Year 12 Quarter 2 payment in full on 17 January 2022. As a result, the Authority has taken the decision not to confirm the provisional order.
For further details please see the Decision document dated 24 January 2022 below.
Ofgem issued the provisional order on 12 November 2021 following Delta’s failure to make its FIT Year 12 Quarter 2 Payment of £46,701.23 by the deadline of 10 November 2021. The Authority was satisfied that Delta was contravening Standard Licence Condition ("SLC") 33 and the Feed-in Tariffs Order 2012. This provisional order required that Delta pay the outstanding amount forthwith.
The Authority issued a Notice of Proposal to confirm the provisional order, with modifications, on 16 December 2021. The Notice of Proposal invited representation or objections in relation to the proposed confirmation by 13 January 2022. The Authority received no representations.
Notice of Proposal to Confirm Provisional Order
On 16 December 2021, the Authority published its notice of proposal to confirm the provisional order dated 12 November 2021 imposed on Delta on the grounds that Delta is contravening or is likely to contravene the requirements of SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33. The Authority proposed to confirm the order in the notice of proposal.
The Authority gave notice that in accordance with section 26(1) of the Electricity Act:
SLC 33.3 and conditions 3.1 and 3.1.2 of Schedule A, Part 3 of SLC 33 are the relevant conditions and requirements for the purpose of the provisional order;
The acts or omissions which, in the Authority’s opinion, constitute or would constitute contraventions of those conditions and requirements, and other factors which in the Authority’s opinion justify the confirmation of the provisional order are those set out in the Notice of proposal to confirm the provisional order.
[This paragraph is not reproduced here because it contains a contact detail. Read it on Ofgem's site.]
The Authority would consider these representations and then make a final decision on whether to confirm the provisional order prior to 11 February 2022 (the date on which the provisional order will lapse if not confirmed).
Issue of Provisional Order
On 12 November 2021, the Authority issued a provisional order to Delta in accordance with section 25(2) of the Electricity Act 1989.
Delta was required to make Feed-in Tariff (“FIT”) Levelisation Payments on both a quarterly and annual basis, as per the requirements of Standard Licence Condition ("SLC") 33 and the Feed-In Tariff Order 2012.
Delta had failed to make its FIT Year 12 Quarter 2 Levelisation Payment of £46,701.23 by the deadline of 10 November 2021.
The provisional order required Delta to pay the outstanding amount forthwith.
Provisional orders are issued in certain circumstances in accordance with the EA89 and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines .
On 12 November 2021, the Authority published a Notice of Reasons explaining in greater detail the rationale for issuing the provisional order.
- Provisional Order: Delta Gas and Power, dated 12 November 2021 [PDF, 71.90KB]
- Notice of Reasons: Delta Gas and Power, dated 12 November 2021 [PDF, 127.13KB]
- Delta - Notice of proposal to confirm a PO FY12 Q2 dated 15 December 2021 [PDF, 182.48KB]
- Notice of Decision not to confirm a Provisional Order Delta 24 01 2022 [PDF, 60.34KB]
10 Nov 2021: Investigation into Utility Warehouse’s compliance with Standard Licence Conditions (SLCs) 25C/0, 27.5, 27.8, 28B and 32 of the Electricity Supply Licence and the Gas Supply Licence
Type as published: Enforcement case. Published 10 Nov 2021. Status as published: Closed.
Decision (as Ofgem words it): Decision of the Gas and Electricity Market to close its investigation into Utility Warehouse’s compliance with Standard Licence Conditions (SLCs) 25C/0, 27.5, 27.8, 28B and 32 of the Electricity Supply Licence and the Gas Supply Licence
Ofgem has decided to close, by way of alternative action, its investigation into Utility Warehouse’s (UW) compliance with Standard Licence Conditions (“SLC”) 25C/0 (Domestic Customer Objective and Standards of Conduct for supply activities); SLC 27.5 (Domestic Customers in payment difficulty – services) and 27.8 (Customers in payment difficulty - ability to pay); 28B (Warrants relating to Pre-payment Meters); and 32 (Provision of Social Obligation Reporting (SOR) data) of its Gas and Electricity Supply Licences.
The decision was taken in accordance with our Enforcement Guidelines and as a consequence of UW’s offer to make a redress payment, in recognition of its failures, of £1.5 million to Ofgem’s Voluntary Redress Fund (administered by the Energy Saving Trust). UW has also taken satisfactory improvement actions during the course of the investigation.
These licence conditions relate to the provision of services to customers in payment difficulty, their ability to pay and associated communications. This includes requirements for warrants for pre-payment meters (pre-payment charge restriction).
SLC 25C, which was in force until 9 October 2017, required suppliers to take all reasonable steps to achieve certain standards of conduct and to ensure that the standards were interpreted and applied consistently with the customer objective, which was to treat customers fairly. This requirement has since been updated and our updated Standards of Conduct (SLC 0) came into force on 10 October 2017.
SLCs 27.5 and 27.8 set out specific obligations concerning services that suppliers should offer, where suppliers are aware or have reason to believe that customers are in payment difficulty; and suppliers should take all reasonable steps to ascertain a customer’s ability to pay.
SLC 28B, introduced on 8 January 2018, places certain conditions on the use of warrants relating to pre-payment meters and other supplier actions in relation to debt.
During the course of the investigation, UW raised the fact that it had reported some inaccurate Social Obligations Reporting (SOR) data which requires suppliers to report on performance in relation to their dealings with domestic customers, and specifically here in relation to customers in payment difficulty. On 18 October 2019 the scope of the investigation was therefore widened to cover SLC 32. UW has since re-submitted the relevant data, where possible, covering 2013-2019.
Having acknowledged the failure to consistently comply with the above SLCs, UW has agreed to make a payment of £1.5 million into the Voluntary Redress Fund.
Further details can be found in the decision document .
3 Nov 2021: Colorado Energy Limited: Provisional Order
Type as published: Enforcement case. Published 3 Nov 2021. Status as published: Provisional Order closed.
Colorado Energy Limited (“Colorado”) ceased trading on 13 October 2021 and subsequently its licences to supply gas and electricity were revoked. As a result, the provisions of the provisional order, issued to Colorado on 21 September 2021, are no longer in effect.
Colorado’s customers have been transferred to Shell Energy Retail Limited under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Ofgem appoints Shell Energy Retail Limited to take on customers of Pure Planet Limited, Daligas Limited and Colorado Energy Limited .
Provisional orders are issued in certain circumstances in accordance with the statutory framework and where certain conditions are satisfied. Further information regarding provisional orders is contained within our Enforcement Guidelines.
For information relating to this provisional order, please see the documents below.
3 Nov 2021: Symbio Energy: Final Order
Type as published: Enforcement case. Published 3 Nov 2021. Status as published: Final Order closed.
On 18 August 2021, the Authority issued a Notice of Proposal to make a Final Order on Symbio Energy Limited (”Symbio”) under section 26 (1) and (2) of the Electricity Act 1989 (“the EA89”) and section 29 (1) and (2) of the Gas Act 1986 (“the GA89”).
The particular behaviour of concern giving rise to the proposed Final Order was that Symbio had refused to provide financial information requested by Ofgem under Standard Licence Condition ("SLC") 5. SLC 5 gives the Authority the power to request information from licensees.
The information was requested on 28 May 2021, pursuant to SLC 5 of Symbio’s Gas and Electricity supply licences.
We needed this information to assess Symbio’s compliance with SLC 4B – the “Financial Responsibility Principle”.
The aim of issuing a Notice of Proposal to make a Final Order was to ensure that Ofgem received the financial information requested to enable us to fully understand Symbio’s financial position.
As Symbio ceased trading on 29 September 2021, on 25 October 2021 the Authority took the decision not to proceed with issuing a Final Order.
Symbio’s customers have been transferred to E.ON Next under the Supplier of Last Resort (SoLR) process. If you would like any further information regarding the SoLR process and how this is being managed please see: Symbio Energy customers: Your questions on new supplier E.ON Next .