Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Lancashire Combined County Authority: earlier years

Every earlier period the Department's sheets give for this authority, for 4 series. The latest figures are on the authority's page.

The Department's own sheets for earlier dates, from the same workbooks as the sections on the authority's page. Each table has a column for every sheet that has a row for this authority, oldest first, and a row for every heading as the Department words it (units are in the headings). A value with decimal places is shown to two places here; the download holds every digit as stored. A cell the Department left empty is "blank". A heading that a sheet does not have is "not published" for that sheet. A total is "flagged" when, in the file we hold, the Department's total is not the sum of the lines it lists under it; the figure is shown as published and has not been changed. This page does not compare the authority with any other, does not work out any change between columns, and does not say what a figure means.

Unit: The Department says: "All figures are in thousands of pounds (£ thousand)." (every sheet).

The Department's sheets for these periods have no row for this authority: as at 31 March 2010; as at 31 March 2011; as at 31 March 2012; as at 31 March 2013; as at 31 March 2014; as at 31 March 2015; as at 31 March 2016; as at 31 March 2017; as at 31 March 2018; as at 31 March 2019; as at 31 March 2020; as at 30 June 2020; as at 30 September 2020; as at 31 December 2020; as at 31 March 2021; as at 30 June 2021; as at 30 September 2021; as at 31 December 2021; as at 31 March 2022; as at 30 June 2022; as at 30 September 2022; as at 31 December 2022; as at 31 March 2023; as at 30 June 2023; as at 30 September 2023; as at 31 December 2023; as at 31 March 2024; as at 30 June 2024; as at 30 September 2024; as at 31 December 2024; as at 31 March 2025. A missing row is not a figure of zero.

Borrowing for Lancashire Combined County Authority, as published, oldest first
Heading as the Department words itas at 30 June 2025LA_Borrowing_25-26_Q1as at 30 September 2025LA_Borrowing_25-26_Q2as at 31 December 2025LA_Borrowing_25-26_Q3as at 31 March 2026LA_Borrowing_25-26_Q4
Loans short term - Banks in UK £ thousand0000
Loans short term - Building Societies £ thousand0000
Loans short term - Other financial intermediaries £ thousand0000
Loans short term - Public corporations £ thousand0000
Loans short term - Private non-financial corporations £ thousand0000
Loans short term - Central Government £ thousand0000
Loans short term - Households sector £ thousand0000
Loans short term - Other Sources [note 1] £ thousand0000
Securities - Negotiable bonds & commercial paper £ thousand0000
Securities - Other stock issues £ thousand0000
Loans Longer-term - PWLB [note 2] [note 5] £ thousand0000
Loans Longer-term - Banks in UK £ thousand0000
Loans Longer-term - Building Societies £ thousand0000
Loans Longer-term - Other financial intermediaries £ thousand0000
Loans Longer-term - Public corporations £ thousand0000
Loans Longer-term - Private non-financial corporations £ thousand0000
Loans Longer-term - Central Government £ thousand0000
Loans Longer-term - Households sector £ thousand0000
Loans Longer-term - Other Sources [note 1] £ thousand0000
Short Term Loans Local Authorities £ thousand0000
Longer Term Loans Local Authorities £ thousand0000
The Department's description of each sheet

Each sheet's title:

  • LA_Borrowing_09-10 Outstanding borrowing by local authority and category, as at 31 March 2010, UK
  • LA_Borrowing_10-11 Outstanding borrowing by local authority and category, as at 31 March 2011, UK
  • LA_Borrowing_11-12 Outstanding borrowing by local authority and category, as at 31 March 2012, UK
  • LA_Borrowing_12-13 Outstanding borrowing by local authority and category, as at 31 March 2013, UK
  • LA_Borrowing_13-14 Outstanding borrowing by local authority and category, as at 31 March 2014, UK
  • LA_Borrowing_14-15 Outstanding borrowing by local authority and category, as at 31 March 2015, UK
  • LA_Borrowing_15-16 Outstanding borrowing by local authority and category, as at 31 March 2016, UK
  • LA_Borrowing_16-17 Outstanding borrowing by local authority and category, as at 31 March 2017, UK
  • LA_Borrowing_17-18 Outstanding borrowing by local authority and category, as at 31 March 2018, UK
  • LA_Borrowing_18-19 Outstanding borrowing by local authority and category, as at 31 March 2019, UK
  • LA_Borrowing_19-20 Outstanding borrowing by local authority and category, as at 31 March 2020, UK
  • LA_Borrowing_20-21_Q1 Outstanding borrowing by local authority and category, as at 30 June 2020, UK
  • LA_Borrowing_20-21_Q2 Outstanding borrowing by local authority and category, as at 30 September 2020, UK
  • LA_Borrowing_20-21_Q3 Outstanding borrowing by local authority and category, as at 31 December 2020, UK
  • LA_Borrowing_20-21_Q4 Outstanding borrowing by local authority and category, as at 31 March 2021, UK
  • LA_Borrowing_21-22_Q1 Outstanding borrowing by local authority and category, as at 30 June 2021, UK
  • LA_Borrowing_21-22_Q2 Outstanding borrowing by local authority and category, as at 30 September 2021, UK
  • LA_Borrowing_21-22_Q3 Outstanding borrowing by local authority and category, as at 31 December 2021, UK
  • LA_Borrowing_21-22_Q4 Outstanding borrowing by local authority and category, as at 31 March 2022, UK
  • LA_Borrowing_22-23_Q1 Outstanding borrowing by local authority and category, as at 30 June 2022, UK
  • LA_Borrowing_22-23_Q2 Outstanding borrowing by local authority and category, as at 30 September 2022, UK
  • LA_Borrowing_22-23_Q3 Outstanding borrowing by local authority and category, as at 31 December 2022, UK
  • LA_Borrowing_22-23_Q4 Outstanding borrowing by local authority and category, as at 31 March 2023, UK
  • LA_Borrowing_23-24_Q1 Outstanding borrowing by local authority and category, as at 30 June 2023, UK
  • LA_Borrowing_23-24_Q2 Outstanding borrowing by local authority and category, as at 30 September 2023, UK
  • LA_Borrowing_23-24_Q3 Outstanding borrowing by local authority and category, as at 31 December 2023, UK
  • LA_Borrowing_23-24_Q4 Outstanding borrowing by local authority and category, as at 31 March 2024, UK
  • LA_Borrowing_24-25_Q1 Outstanding borrowing by local authority and category, as at 30 June 2024, UK
  • LA_Borrowing_24-25_Q2 Outstanding borrowing by local authority and category, as at 30 September 2024, UK
  • LA_Borrowing_24-25_Q3 Outstanding borrowing by local authority and category, as at 31 December 2024, UK
  • LA_Borrowing_24-25_Q4 Outstanding borrowing by local authority and category, as at 31 March 2025, UK
  • LA_Borrowing_25-26_Q1 Outstanding borrowing by local authority and category, as at 30 June 2025, UK
  • LA_Borrowing_25-26_Q2 Outstanding borrowing by local authority and category, as at 30 September 2025, UK
  • LA_Borrowing_25-26_Q3 Outstanding borrowing by local authority and category, as at 31 December 2025, UK
  • LA_Borrowing_25-26_Q4 Outstanding borrowing by local authority and category, as at 31 March 2026, UK

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

as at 31 March 2010; as at 31 March 2011; as at 31 March 2012; as at 31 March 2013

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some shorthand is used in this table, [z] = not applicable, [x] = unavailable at time of publication.

as at 31 March 2014; as at 31 March 2015; as at 31 March 2019; as at 31 March 2020; as at 30 June 2020; as at 30 September 2020; as at 31 March 2021; as at 31 December 2021; as at 30 September 2022; as at 31 December 2022; as at 31 March 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable.

as at 31 March 2016; as at 31 March 2017; as at 31 March 2018; as at 31 December 2020; as at 30 June 2021; as at 30 September 2021; as at 30 June 2022

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable, [i] = imputed.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

as at 31 March 2022

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

as at 30 June 2023; as at 30 September 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

as at 31 December 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable, [x] = unavailable at time of publication.

as at 31 March 2024

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable, [r] = revisions.

as at 30 June 2024; as at 31 December 2024; as at 31 March 2025; as at 30 June 2025; as at 30 September 2025; as at 31 December 2025; as at 31 March 2026

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable

as at 30 September 2024

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

Unit: The Department says: "All figures are in thousands of pounds (£ thousand)." (every sheet).

The Department's sheets for these periods have no row for this authority: as at 31 March 2010; as at 31 March 2011; as at 31 March 2012; as at 31 March 2013; as at 31 March 2014; as at 31 March 2015; as at 31 March 2016; as at 31 March 2017; as at 31 March 2018; as at 31 March 2019; as at 31 March 2020; as at 30 June 2020; as at 30 September 2020; as at 31 December 2020; as at 31 March 2021; as at 30 June 2021; as at 30 September 2021; as at 31 December 2021; as at 31 March 2022; as at 30 June 2022; as at 30 September 2022; as at 31 December 2022; as at 31 March 2023; as at 30 June 2023; as at 30 September 2023; as at 31 December 2023; as at 31 March 2024; as at 30 June 2024; as at 30 September 2024; as at 31 December 2024; as at 31 March 2025. A missing row is not a figure of zero.

Investments for Lancashire Combined County Authority, as published, oldest first
Heading as the Department words itas at 30 June 2025LA_Investments_25-26_Q1as at 30 September 2025LA_Investments_25-26_Q2as at 31 December 2025LA_Investments_25-26_Q3as at 31 March 2026LA_Investments_25-26_Q4
Deposits: banks £ thousand0000
Deposits: building societies £ thousand0000
Treasury bills £ thousand0000
Certificates of deposit: banks £ thousand0000
Certificates of deposit: building societies £ thousand0000
British Government (Gilt-edge) securities £ thousand0000
Other financial intermediaries £ thousand0000
Public corporations £ thousand0000
Debt Management Account deposit facility [note 2] £ thousand0000
Money market funds £ thousand0000
Externally managed funds £ thousand0000
Other investments [note 3] £ thousand0000
Loans Local Government £ thousand0000
The Department's description of each sheet

Each sheet's title:

  • LA_Investments_09-10 Outstanding investments by local authority and category, as at 31 March 2010, UK
  • LA_Investments_10-11 Outstanding investments by local authority and category, as at 31 March 2011, UK
  • LA_Investments_11-12 Outstanding investments by local authority and category, as at 31 March 2012, UK
  • LA_Investments_12-13 Outstanding investments by local authority and category, as at 31 March 2013, UK
  • LA_Investments_13-14 Outstanding investments by local authority and category, as at 31 March 2014, UK
  • LA_Investments_14-15 Outstanding investments by local authority and category, as at 31 March 2015, UK
  • LA_Investments_15-16 Outstanding investments by local authority and category, as at 31 March 2016, UK
  • LA_Investments_16-17 Outstanding investments by local authority and category, as at 31 March 2017, UK
  • LA_Investments_17-18 Outstanding investments by local authority and category, as at 31 March 2018, UK
  • LA_Investments_18-19 Outstanding investments by local authority and category, as at 31 March 2019, UK
  • LA_Investments_19-20 Outstanding investments by local authority and category, as at 31 March 2020, UK
  • LA_Investments_20-21_Q1 Outstanding investments by local authority and category, as at 30 June 2020, UK
  • LA_Investments_20-21_Q2 Outstanding investments by local authority and category, as at 30 September 2020, UK
  • LA_Investments_20-21_Q3 Outstanding investments by local authority and category, as at 31 December 2020, UK
  • LA_Investments_20-21_Q4 Outstanding investments by local authority and category, as at 31 March 2021, UK
  • LA_Investments_21-22_Q1 Outstanding investments by local authority and category, as at 30 June 2021, UK
  • LA_Investments_21-22_Q2 Outstanding investments by local authority and category, as at 30 September 2021, UK
  • LA_Investments_21-22_Q3 Outstanding investments by local authority and category, as at 31 December 2021, UK
  • LA_Investments_21-22_Q4 Outstanding investments by local authority and category, as at 31 March 2022, UK
  • LA_Investments_22-23_Q1 Outstanding investments by local authority and category, as at 30 June 2022, UK
  • LA_Investments_22-23_Q2 Outstanding investments by local authority and category, as at 30 September 2022, UK
  • LA_Investments_22-23_Q3 Outstanding investments by local authority and category, as at 31 December 2022, UK
  • LA_Investments_22-23_Q4 Outstanding investments by local authority and category, as at 31 March 2023, UK
  • LA_Investments_23-24_Q1 Outstanding investments by local authority and category, as at 30 June 2023, UK
  • LA_Investments_23-24_Q2 Outstanding investments by local authority and category, as at 30 September 2023, UK
  • LA_Investments_23-24_Q3 Outstanding investments by local authority and category, as at 31 December 2023, UK
  • LA_Investments_23-24_Q4 Outstanding investments by local authority and category, as at 31 March 2024, UK
  • LA_Investments_24-25_Q1 Outstanding investments by local authority and category, as at 30 June 2024, UK
  • LA_Investments_24-25_Q2 Outstanding investments by local authority and category, as at 30 September 2024, UK
  • LA_Investments_24-25_Q3 Outstanding investments by local authority and category, as at 31 December 2024, UK
  • LA_Investments_24-25_Q4 Outstanding investments by local authority and category, as at 31 March 2025, UK
  • LA_Investments_25-26_Q1 Outstanding investments by local authority and category, as at 30 June 2025, UK
  • LA_Investments_25-26_Q2 Outstanding investments by local authority and category, as at 30 September 2025, UK
  • LA_Investments_25-26_Q3 Outstanding investments by local authority and category, as at 31 December 2025, UK
  • LA_Investments_25-26_Q4 Outstanding investments by local authority and category, as at 31 March 2026, UK

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

as at 31 March 2010; as at 31 March 2011; as at 31 March 2012; as at 31 March 2013; as at 31 December 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable, [x] = unavailable at time of publication.

as at 31 March 2014; as at 31 March 2015; as at 31 March 2019; as at 31 March 2020; as at 30 June 2020; as at 30 September 2020; as at 31 March 2021; as at 31 December 2021; as at 31 March 2022; as at 30 September 2022; as at 31 December 2022; as at 31 March 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable.

as at 31 March 2016; as at 31 March 2017; as at 31 March 2018; as at 31 December 2020; as at 30 June 2021; as at 30 September 2021; as at 30 June 2022

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable, [i] = imputed.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

as at 30 June 2023; as at 30 September 2023

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

as at 31 March 2024

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

A blank cell in the 'Notes' column indicates that there is no relevant note for the row.

Some shorthand is used in this table, [z] = not applicable, [r] = revisions.

as at 30 June 2024; as at 30 September 2024; as at 31 December 2024; as at 31 March 2025; as at 30 June 2025; as at 30 September 2025; as at 31 December 2025; as at 31 March 2026

This worksheet contains one table. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet.

Some shorthand is used in this table, [z] = not applicable

Unit: The Department says: "All figures are in thousands of pounds (£ thousand)." (every sheet).

The Department's sheets for these periods have no row for this authority: April 2022 to June 2022; April 2022 to September 2022; April 2022 to December 2022; April 2022 to March 2023; April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025. A missing row is not a figure of zero.

Capital spending and receipts for Lancashire Combined County Authority, as published, oldest first
Heading as the Department words itApril 2025 to June 20252025-26_Q1_CPR4April 2025 to September 20252025-26_Q1-Q2_CPR4April 2025 to December 20252025-26_Q1-Q3_CPR4April 2025 to March 20262025-26_Q1-Q4_CPR4
Expenditure: Acquisition of land & existing buildings0000
Expenditure: Acquisition of land & existing buildings, of which HRA0000
Expenditure: New construction, conversion & renovation0000
Expenditure: New construction, conversion & renovation, of which HRA0000
Expenditure: Vehicles, plant, furniture & equipment0000
Expenditure: Vehicles, plant, furniture & equipment, of which HRA0000
Expenditure: Intangible fixed assets0000
Expenditure: Intangible fixed assets, of which HRA0000
Expenditure: Total expenditure on fixed assets0000
Expenditure: Total expenditure on fixed assets, of which HRA0000
Expenditure: Expenditure on grants00069,714
Expenditure: Expenditure on grants, of which to other local authorities00069,714
Expenditure: Expenditure on grants, of which intra-GLA transfer[z][z][z][z]
Expenditure: Expenditure on grants, of which HRA0000
Expenditure: HRA expenditure on grants, of which to other local authorities0000
Expenditure: Expenditure on loans and other financial assistance0000
Expenditure: Expenditure on loans and other financial assistance, of which to other local authorities0000
Expenditure: Expenditure on loans and other financial assistance, of which intra-GLA transfer[z][z][z][z]
Expenditure: Expenditure on loans and other financial assistance, of which HRA0000
Expenditure: HRA expenditure on loans and other financial assistance, of which to other local authorities0000
Expenditure: Acquisition of share or loan capital0000
Expenditure: Acquisition of share or loan capital, of which intra-GLA transfer[z][z][z][z]
Expenditure: Acquisition of share or loan capital, of which HRA0000
Total financial expenditure00069,714
Total financial expenditure, of which HRA0000
Total capital expenditure00069,714
Total capital expenditure, of which HRA0000
Receipts: Sale and disposal of tangible fixed assets0000
Receipts: Sale and disposal of tangible fixed assets, of which HRA0000
Receipts: Sale of intangible fixed assets0000
Receipts: Sale of intangible fixed assets, of which HRA0000
Receipts: Repayments of grants, loans & other financial assistance0000
Receipts: Repayments of grants, loans & other financial assistance, of which HRA0000
Receipts: Disposal of investments (including share & loan capital)0000
Receipts: Disposal of investments (including share & loan capital), of which HRA0000
Total capital receipts0000
Total capital receipts, of which from other local authorities0000
Total capital receipts, of which HRA0000
Total HRA capital receipts, of which from other local authorities0000
Capital Financing Requirement as at 1 April 2023not publishednot publishednot publishednot published
Capital Financing Requirement as at 1 April 2024not publishednot publishednot publishednot published
Capital Financing Requirement as at 1 April 20250000
Updated Forecast: Expenditure financed by other borrowing and credit arrangements0000
Updated Forecast: Total contribution from revenue, MMR, or use of receipts to repay credit liabilities0000
Updated Forecast: Change in Capital Financing Requirement0000
Updated Forecast: Capital Financing Requirement as at 31 March 2024not publishednot publishednot publishednot published
Updated Forecast: Capital Financing Requirement as at 31 March 2025not publishednot publishednot publishednot published
Updated Forecast: Capital Financing Requirement as at 31 March 20260000
Headings that are not in every sheet

Expenditure: Acquisition of land & existing buildings, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: New construction, conversion & renovation, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Vehicles, plant, furniture & equipment, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Intangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Total expenditure on fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Expenditure on grants, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: HRA expenditure on grants, of which to other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Expenditure on loans and other financial assistance, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: HRA expenditure on loans and other financial assistance, of which to other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Acquisition of share or loan capital, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total financial expenditure, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total capital expenditure, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Sale and disposal of tangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Sale of intangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Repayments of grants, loans & other financial assistance, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Disposal of investments (including share & loan capital), of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total capital receipts, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total HRA capital receipts, of which from other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Capital Financing Requirement as at 1 April 2023: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024.

Capital Financing Requirement as at 1 April 2024: in the sheets for April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025.

Capital Financing Requirement as at 1 April 2025: in the sheets for April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Expenditure financed by other borrowing and credit arrangements: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Total contribution from revenue, MMR, or use of receipts to repay credit liabilities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Change in Capital Financing Requirement: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Capital Financing Requirement as at 31 March 2024: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024.

Updated Forecast: Capital Financing Requirement as at 31 March 2025: in the sheets for April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025.

Updated Forecast: Capital Financing Requirement as at 31 March 2026: in the sheets for April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

The Department's description of each sheet

Each sheet's title:

  • 2022-23_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to June 2022
  • 2022-23_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to September 2022
  • 2022-23_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to December 2022
  • 2022-23_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2022 to March 2023
  • 2023-24_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to June 2023
  • 2023-24_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to September 2023
  • 2023-24_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to December 2023
  • 2023-24_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2023 to March 2024
  • 2024-25_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to June 2024
  • 2024-25_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to September 2024
  • 2024-25_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to December 2024
  • 2024-25_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2024 to March 2025
  • 2025-26_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to June 2025
  • 2025-26_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to September 2025
  • 2025-26_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to December 2025
  • 2025-26_Q1-Q4_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to March 2026

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

April 2022 to June 2022; April 2022 to September 2022; April 2022 to December 2022

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2022-23. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2022 to March 2023

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2022-23. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2023-24. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2023 to March 2024

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2023-24. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2024-25. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2024 to March 2025

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2024-25. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2025-26. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

Unit: The Department says: "Data in this woksheet is reported in thousands of pounds (£ thousand)." (every sheet).

The Department's sheets for these periods have no row for this authority: 2017-18 Q1; 2017-18 Q2; 2017-18 Q3; 2018-19 Q1; 2018-19 Q2; 2018-19 Q3; 2019-20 Q1; 2019-20 Q2; 2019-20 Q3; 2020-21 Q1; 2020-21 Q2; 2020-21 Q3; 2021-22 Q1; 2021-22 Q2; 2021-22 Q3; 2022-23 Q1; 2022-23 Q2; 2022-23 Q3; 2023-24 Q1; 2023-24 Q2; 2023-24 Q3; 2023-24 Q4; 2024-25 Q1; 2024-25 Q2; 2024-25 Q3; 2024-25 Q4. A missing row is not a figure of zero.

Quarterly revenue update for Lancashire Combined County Authority, as published, oldest first
Heading as the Department words it2025-26 Q1Timeseries2025-26 Q2Timeseries2025-26 Q3Timeseries2025-26 Q4Timeseries
General Public Services: RO5 (Lines 111, 210 and 227)0000
General Public Services: RO6 (Line 490 less Lines 450, 475, 476, 481, 482 & 484)25252525
General Public Services Total25252525
Defence Total: RO6 (Line 450)0000
Public order and Safety: RO5 (Sum of Lines 231, 232 and 233)0000
Public order and Safety: RO6 (Sum of Lines 100, 290, 475 and 476)0000
Public order and Safety Total0000
Economic Affairs: RO2 (Lines 90 Less Lines 49 and 51)14141415
Economic Affairs: RO2 (Line 51)0000
Economic Affairs: RO5 (Sum of Lines 140, 219, 220, 221, 224, 225, 226, 230, 241, 243, 244, 247, 250 , 350 , 351 and 352)140140140140
Economic Affairs Total154154154155
Environmental Protection: RO5 (Sum of Lines 222, 228, 229, 270, 281, 282, 283, 284, 285, 286 and 340)0000
Housing and Community Amenities: RO2 (Line 49)0000
Housing and Community Amenities: RO4 (Sum of Lines 10, 20, 31, 38 & 60)0000
Housing and Community Amenities: RO5 (Sum of Lines 223, 310, 320, 335, 338 & 360)0000
Housing and Community Amenities Total0000
Public health: mandatory services [note 8]0000
Public health: non-mandatory services [note 8]0000
Health Total [note 8]0000
Recreation, Culture and Religion: RO5 (Line 190 less Lines 111 and Line 140)0000
Education: RO1 (Line 90) - Excluding non-pay element of schools expenditure) [note 1]0000
Education: Non-pay element of schools expenditure [note 1]0000
Education Total0000
Social Protection: Children's Social Care (RO3 Line 30)0000
Social Protection: Adult's Social Care (RO3 Line 60)0000
Social Protection: RO3 - Lines 30 and 600000
Social Protection: RO4 (Line 90 less 10, 20, 31, 38 and 60)0000
Social Protection Total0000
Non-distributed costs: retirement benefits0000
Non-distributed costs: Costs of unused shares of IT facilities and other assets0000
Non-distributed costs: Revenue expenditure on surplus assets0000
Other Services (exclude Public health)0000
Total Service Expenditure179179179180
Total Service Expenditure (excluding Education)179179179180
Housing benefits: rent allowances - mandatory payments0000
Housing benefits: non-HRA rent rebates - mandatory payments0000
Housing benefits: rent rebates to HRA tenants - mandatory payments0000
Housing benefits: subsidy limitation transfers from HRA0000
Contribution to the HRA re items shared by the whole community0000
Parish precepts0000
Integrated Transport Authority levy0000
Waste Disposal Authority levy0000
London Pensions Fund Authority levy0000
Other levies0000
External Trading Accounts net surplus(-)/ deficit(+)0000
Internal Trading Accounts net surplus(-)/ deficit(+)0000
Adjustments to net current expenditure0000
Appropriations to(+) / from(-) Accumulated Absences Account0000
Net Current Expenditure179179179180
Capital charges included in External Trading Accounts (Line 34)0000
Capital charges included in Internal Trading Accounts (Line 35)0000
Interest payable and similar charges0000
Interest receivable [note 3]-179-179-179-180
Housing Revenue Account Income: Dwelling rents (gross) (RO4 line 101)0000
Housing Revenue Account Income: Non-dwelling rents (gross) (RO4 line 102)0000
Housing Revenue Account Income: Other income (RO4 Lines 103 - 111)0000
Housing Revenue Account Income Total0000
Housing Revenue Account Expenditure: Repairs and maintenance (RO4 line 121)0000
Housing Revenue Account Expenditure: Supervision and management (including CDC) (RO4 line 122)0000
Housing Revenue Account Expenditure: Special services & rents, rates, taxes, and other charges (RO4 line 123 & line 124)0000
Housing Revenue Account Expenditure: Other (RO4 lines 125-133)0000
Housing Revenue Account Expenditure Total0000

Notes the Department attaches to this authority's row: 2025-26 Q1: [r]; 2025-26 Q2: [r].

[r] The Department says: Revised (Timeseries; All LA_Data tabs)

The Department's description of each sheet

Each sheet's title:

  • Timeseries 2017-18 Q1
  • Timeseries 2017-18 Q2
  • Timeseries 2017-18 Q3
  • Timeseries 2018-19 Q1
  • Timeseries 2018-19 Q2
  • Timeseries 2018-19 Q3
  • Timeseries 2019-20 Q1
  • Timeseries 2019-20 Q2
  • Timeseries 2019-20 Q3
  • Timeseries 2020-21 Q1
  • Timeseries 2020-21 Q2
  • Timeseries 2020-21 Q3
  • Timeseries 2021-22 Q1
  • Timeseries 2021-22 Q2
  • Timeseries 2021-22 Q3
  • Timeseries 2022-23 Q1
  • Timeseries 2022-23 Q2
  • Timeseries 2022-23 Q3
  • Timeseries 2023-24 Q1
  • Timeseries 2023-24 Q2
  • Timeseries 2023-24 Q3
  • Timeseries 2023-24 Q4
  • Timeseries 2024-25 Q1
  • Timeseries 2024-25 Q2
  • Timeseries 2024-25 Q3
  • Timeseries 2024-25 Q4
  • Timeseries 2025-26 Q1
  • Timeseries 2025-26 Q2
  • Timeseries 2025-26 Q3
  • Timeseries 2025-26 Q4

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

2017-18 Q1; 2017-18 Q2; 2017-18 Q3; 2018-19 Q1; 2018-19 Q2; 2018-19 Q3; 2019-20 Q1; 2019-20 Q2; 2019-20 Q3; 2020-21 Q1; 2020-21 Q2; 2020-21 Q3; 2021-22 Q1; 2021-22 Q2; 2021-22 Q3; 2022-23 Q1; 2022-23 Q2; 2022-23 Q3; 2023-24 Q1; 2023-24 Q2; 2023-24 Q3; 2023-24 Q4; 2024-25 Q1; 2024-25 Q2; 2024-25 Q3; 2024-25 Q4; 2025-26 Q1; 2025-26 Q2; 2025-26 Q3; 2025-26 Q4

This worksheet contains one table. Data in this woksheet is reported in thousands of pounds (£ thousand).

Source: QRU1-QRU3 returns