Public beta. Not yet independently reviewed. ProjectWhitehall republishes public records from official sources. It is not an investigation, a legal finding or advice. Registers can be late, incomplete or wrong, and a link between records does not show wrongdoing. Absence of a record does not mean absence of activity. Always check the original source, which we link on every entry. We have already made mistakes and list them all in the corrections log.

ProjectWhitehall

Tyne and Wear Fire and Rescue Authority: earlier years

Every earlier period the Department's sheets give for this authority, for 2 series. The latest figures are on the authority's page.

The Department's own sheets for earlier dates, from the same workbooks as the sections on the authority's page. Each table has a column for every sheet that has a row for this authority, oldest first, and a row for every heading as the Department words it (units are in the headings). A value with decimal places is shown to two places here; the download holds every digit as stored. A cell the Department left empty is "blank". A heading that a sheet does not have is "not published" for that sheet. A total is "flagged" when, in the file we hold, the Department's total is not the sum of the lines it lists under it; the figure is shown as published and has not been changed. This page does not compare the authority with any other, does not work out any change between columns, and does not say what a figure means.

Unit: The Department says: "All figures are in thousands of pounds (£ thousand)." (every sheet).

Capital spending and receipts for Tyne and Wear Fire and Rescue Authority, as published, oldest first
Heading as the Department words itApril 2022 to June 20222022-23_Q1_CPR4April 2022 to September 20222022-23_Q1-Q2_CPR4April 2022 to December 20222022-23_Q1-Q3_CPR4April 2022 to March 20232022-23_Q1-Q4_CORApril 2023 to June 20232023-24_Q1_CPR4April 2023 to September 20232023-24_Q1-Q2_CPR4April 2023 to December 20232023-24_Q1-Q3_CPR4April 2023 to March 20242023-24_Q1-Q4_CORApril 2024 to June 20242024-25_Q1_CPR4April 2024 to September 20242024-25_Q1-Q2_CPR4April 2024 to December 20242024-25_Q1-Q3_CPR4April 2024 to March 20252024-25_Q1-Q4_CORApril 2025 to June 20252025-26_Q1_CPR4April 2025 to September 20252025-26_Q1-Q2_CPR4April 2025 to December 20252025-26_Q1-Q3_CPR4April 2025 to March 20262025-26_Q1-Q4_CPR4
Expenditure: Acquisition of land & existing buildings0000000000000000
Expenditure: Acquisition of land & existing buildings, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: New construction, conversion & renovation671944571,4461,6583,8736,1108,3801,3391,6292,0032,790347640744983
Expenditure: New construction, conversion & renovation, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: Vehicles, plant, furniture & equipment1673901,7803,5796538711,2341,4229131,4231,8503,9143571,2151,3322,500
Expenditure: Vehicles, plant, furniture & equipment, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: Intangible fixed assets0000000000000000
Expenditure: Intangible fixed assets, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: Total expenditure on fixed assets2345842,2375,0252,3114,7447,3449,8022,2523,0523,8536,7047041,8552,0763,483
Expenditure: Total expenditure on fixed assets, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: Expenditure on grants0000000000000000
Expenditure: Expenditure on grants, of which to other local authorities0000000000000000
Expenditure: Expenditure on grants, of which intra-GLA transfer[z][z][z]0[z][z][z][z][z][z][z][z][z][z][z][z]
Expenditure: Expenditure on grants, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: HRA expenditure on grants, of which to other local authoritiesnot publishednot publishednot publishednot published000000000000
Expenditure: Expenditure on loans and other financial assistance0000000000000000
Expenditure: Expenditure on loans and other financial assistance, of which to other local authorities0000000000000000
Expenditure: Expenditure on loans and other financial assistance, of which intra-GLA transfer[z][z][z]0[z][z][z][z][z][z][z][z][z][z][z][z]
Expenditure: Expenditure on loans and other financial assistance, of which HRAnot publishednot publishednot publishednot published000000000000
Expenditure: HRA expenditure on loans and other financial assistance, of which to other local authoritiesnot publishednot publishednot publishednot published000000000000
Expenditure: Acquisition of share or loan capital0000000000000000
Expenditure: Acquisition of share or loan capital, of which intra-GLA transfer[z][z][z]0[z][z][z][z][z][z][z][z][z][z][z][z]
Expenditure: Acquisition of share or loan capital, of which HRAnot publishednot publishednot publishednot published000000000000
Total financial expenditure0000000000000000
Total financial expenditure, of which HRAnot publishednot publishednot publishednot published000000000000
Total capital expenditure2345842,2375,0252,3114,7447,3449,8022,2523,0523,8536,7047041,8552,0763,483
Total capital expenditure, of which HRAnot publishednot publishednot publishednot published000000000000
Receipts: Sale and disposal of tangible fixed assets00000000000260000
Receipts: Sale and disposal of tangible fixed assets, of which HRAnot publishednot publishednot publishednot published000000000000
Receipts: Sale of intangible fixed assets0000000000000000
Receipts: Sale of intangible fixed assets, of which HRAnot publishednot publishednot publishednot published000000000000
Receipts: Repayments of grants, loans & other financial assistance0000000000000000
Receipts: Repayments of grants, loans & other financial assistance, of which HRAnot publishednot publishednot publishednot published000000000000
Receipts: Disposal of investments (including share & loan capital)0000000000000000
Receipts: Disposal of investments (including share & loan capital), of which HRAnot publishednot publishednot publishednot published000000000000
Total capital receipts00000000000260000
Total capital receipts, of which from other local authorities0000000000000000
Total capital receipts, of which HRAnot publishednot publishednot publishednot published000000000000
Total HRA capital receipts, of which from other local authoritiesnot publishednot publishednot publishednot published000000000000
Capital Financing Requirement as at 1 April 2023not publishednot publishednot publishednot published25,38025,38025,38025,240not publishednot publishednot publishednot publishednot publishednot publishednot publishednot published
Capital Financing Requirement as at 1 April 2024not publishednot publishednot publishednot publishednot publishednot publishednot publishednot published23,55023,55023,55023,534not publishednot publishednot publishednot published
Capital Financing Requirement as at 1 April 2025not publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot published21,27721,27721,27722,918
Updated Forecast: Expenditure financed by other borrowing and credit arrangementsnot publishednot publishednot publishednot published000000000000
Updated Forecast: Total contribution from revenue, MMR, or use of receipts to repay credit liabilitiesnot publishednot publishednot publishednot published-14,423-14,423-14,4231,8392,1242,1242,1242,1332,2012,2012,2012,201
Updated Forecast: Change in Capital Financing Requirementnot publishednot publishednot publishednot published14,42314,42314,423-1,839-2,124-2,124-2,124-2,133-2,201-2,201-2,201-2,201
Updated Forecast: Capital Financing Requirement as at 31 March 2024not publishednot publishednot publishednot published39,80339,80339,80323,401not publishednot publishednot publishednot publishednot publishednot publishednot publishednot published
Updated Forecast: Capital Financing Requirement as at 31 March 2025not publishednot publishednot publishednot publishednot publishednot publishednot publishednot published21,42621,42621,42621,401not publishednot publishednot publishednot published
Updated Forecast: Capital Financing Requirement as at 31 March 2026not publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot publishednot published19,07619,07619,07620,717

Notes the Department attaches to this authority's row: April 2024 to March 2025: [r].

[r] The Department says: This indicates that an authority has revised a previous submission which has resulted in amended claimant figures in comparison to the previous publication. (Most worksheets)

Headings that are not in every sheet

Expenditure: Acquisition of land & existing buildings, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: New construction, conversion & renovation, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Vehicles, plant, furniture & equipment, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Intangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Total expenditure on fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Expenditure on grants, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: HRA expenditure on grants, of which to other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Expenditure on loans and other financial assistance, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: HRA expenditure on loans and other financial assistance, of which to other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Expenditure: Acquisition of share or loan capital, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total financial expenditure, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total capital expenditure, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Sale and disposal of tangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Sale of intangible fixed assets, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Repayments of grants, loans & other financial assistance, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Receipts: Disposal of investments (including share & loan capital), of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total capital receipts, of which HRA: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Total HRA capital receipts, of which from other local authorities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Capital Financing Requirement as at 1 April 2023: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024.

Capital Financing Requirement as at 1 April 2024: in the sheets for April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025.

Capital Financing Requirement as at 1 April 2025: in the sheets for April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Expenditure financed by other borrowing and credit arrangements: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Total contribution from revenue, MMR, or use of receipts to repay credit liabilities: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Change in Capital Financing Requirement: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024; April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025; April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

Updated Forecast: Capital Financing Requirement as at 31 March 2024: in the sheets for April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023; April 2023 to March 2024.

Updated Forecast: Capital Financing Requirement as at 31 March 2025: in the sheets for April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024; April 2024 to March 2025.

Updated Forecast: Capital Financing Requirement as at 31 March 2026: in the sheets for April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026.

The Department's description of each sheet

Each sheet's title:

  • 2022-23_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to June 2022
  • 2022-23_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to September 2022
  • 2022-23_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2022 to December 2022
  • 2022-23_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2022 to March 2023
  • 2023-24_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to June 2023
  • 2023-24_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to September 2023
  • 2023-24_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2023 to December 2023
  • 2023-24_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2023 to March 2024
  • 2024-25_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to June 2024
  • 2024-25_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to September 2024
  • 2024-25_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2024 to December 2024
  • 2024-25_Q1-Q4_COR Local authority capital expenditure and receipts by category and authority, England, April 2024 to March 2025
  • 2025-26_Q1_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to June 2025
  • 2025-26_Q1-Q2_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to September 2025
  • 2025-26_Q1-Q3_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to December 2025
  • 2025-26_Q1-Q4_CPR4 Local authority capital expenditure and receipts by category and authority, England, April 2025 to March 2026

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

April 2022 to June 2022; April 2022 to September 2022; April 2022 to December 2022

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2022-23. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2022 to March 2023

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2022-23. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2023 to June 2023; April 2023 to September 2023; April 2023 to December 2023

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2023-24. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2023 to March 2024

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2023-24. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2024 to June 2024; April 2024 to September 2024; April 2024 to December 2024

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2024-25. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2024 to March 2025

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Outturn Return (COR), 2024-25. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

April 2025 to June 2025; April 2025 to September 2025; April 2025 to December 2025; April 2025 to March 2026

This worksheet contains four tables, presented next to each other vertically with one blank row between each table.

Source(s): Capital Payments & Receipts 4 (CPR4), 2025-26. All figures are in thousands of pounds (£ thousand).

Some cells refer to notes which can be found in the 'Notes' worksheet. Blank cells indicate that there is no note in that row.

Unit: The Department says: "Data in this woksheet is reported in thousands of pounds (£ thousand)." (every sheet).

Quarterly revenue update for Tyne and Wear Fire and Rescue Authority, as published, oldest first
Heading as the Department words it2017-18 Q1Timeseries2017-18 Q2Timeseries2017-18 Q3Timeseries2018-19 Q1Timeseries2018-19 Q2Timeseries2018-19 Q3Timeseries2019-20 Q1Timeseries2019-20 Q2Timeseries2019-20 Q3Timeseries2020-21 Q1Timeseries2020-21 Q2Timeseries2020-21 Q3Timeseries2021-22 Q1Timeseries2021-22 Q2Timeseries2021-22 Q3Timeseries2022-23 Q1Timeseries2022-23 Q2Timeseries2022-23 Q3Timeseries2023-24 Q1Timeseries2023-24 Q2Timeseries2023-24 Q3Timeseries2023-24 Q4Timeseries2024-25 Q1Timeseries2024-25 Q2Timeseries2024-25 Q3Timeseries2024-25 Q4Timeseries2025-26 Q1Timeseries2025-26 Q2Timeseries2025-26 Q3Timeseries2025-26 Q4Timeseries
General Public Services: RO5 (Lines 111, 210 and 227)000000000000000000000[x]00000000
General Public Services: RO6 (Line 490 less Lines 450, 475, 476, 481, 482 & 484)164-1,126-1,018-339-20-1,22562-760-4084023,078109172-2561501641,3601,537560-86287[x]610606-1346101,18453211-3,695
General Public Services Total164-1,126-1,018-339-20-1,22562-760-4084023,078109172-2561501641,3601,537560-86287[x]610606-1346101,18453211-3,695
Defence Total: RO6 (Line 450)000000000000000000000[x]00000000
Public order and Safety: RO5 (Sum of Lines 231, 232 and 233)000000000000000000000[x]00000000
Public order and Safety: RO6 (Sum of Lines 100, 290, 475 and 476)11,80610,1319,74311,13712,10112,23011,9729,6439,59210,36710,29510,40211,31910,35611,00011,73013,46714,25317,34614,79114,400[x]16,70716,70716,47115,83017,68116,86015,82822,302
Public order and Safety Total11,80610,1319,74311,13712,10112,23011,9729,6439,59210,36710,29510,40211,31910,35611,00011,73013,46714,25317,34614,79114,400[x]16,70716,70716,47115,83017,68116,86015,82822,302
Economic Affairs: RO2 (Lines 90 Less Lines 49 and 51)000000000000000000000[x]00000000
Economic Affairs: RO2 (Line 51)000000000000000000000[x]00000000
Economic Affairs: RO5 (Sum of Lines 140, 219, 220, 221, 224, 225, 226, 230, 241, 243, 244, 247, 250 , 350 , 351 and 352)000000000000000000000[x]00000000
Economic Affairs Total000000000000000000000[x]00000000
Environmental Protection: RO5 (Sum of Lines 222, 228, 229, 270, 281, 282, 283, 284, 285, 286 and 340)000000000000000000000[x]00000000
Housing and Community Amenities: RO2 (Line 49)000000000000000000000[x]00000000
Housing and Community Amenities: RO4 (Sum of Lines 10, 20, 31, 38 & 60)000000000000000000000[x]00000000
Housing and Community Amenities: RO5 (Sum of Lines 223, 310, 320, 335, 338 & 360)000000000000000000000[x]00000000
Housing and Community Amenities Total000000000000000000000[x]00000000
Public health: mandatory services [note 8]000000000000000000000[x]00000000
Public health: non-mandatory services [note 8]000000000000000000000[x]00000000
Health Total [note 8]000000000000000000000[x]00000000
Recreation, Culture and Religion: RO5 (Line 190 less Lines 111 and Line 140)000000000000000000000[x]00000000
Education: RO1 (Line 90) - Excluding non-pay element of schools expenditure) [note 1]000000000000000000000[x]00000000
Education: Non-pay element of schools expenditure [note 1]000000000000000000000[x]00000000
Education Total000000000000000000000[x]00000000
Social Protection: Children's Social Care (RO3 Line 30)[x][x][x][x][x][x][x][x][x]000000000000[x]00000000
Social Protection: Adult's Social Care (RO3 Line 60)[x][x][x][x][x][x][x][x][x]000000000000[x]00000000
Social Protection: RO3 - Lines 30 and 60000000000000000000000[x]00000000
Social Protection: RO4 (Line 90 less 10, 20, 31, 38 and 60)000000000000000000000[x]00000000
Social Protection Total000000000000000000000[x]00000000
Non-distributed costs: retirement benefits303192328119911414-24919-24922762218201414[x]321163-33609141453
Non-distributed costs: Costs of unused shares of IT facilities and other assets000000000000000000000[x]00000000
Non-distributed costs: Revenue expenditure on surplus assets000000000000000000000[x]00000000
Other Services (exclude Public health)000000000000000000000[x]00000000
Total Service Expenditure12,2739,0248,74811,07912,10011,01412,0358,8979,19810,74513,38210,53011,46710,10911,17211,97014,84915,80817,92613,94314,501[x]17,63817,47616,00116,44018,87416,92716,05318,660
Total Service Expenditure (excluding Education)12,2739,0248,74811,07912,10011,01412,0358,8979,19810,74513,38210,53011,46710,10911,17211,97014,84915,80817,92613,94314,501[x]17,63817,47616,00116,44018,87416,92716,05318,660
Housing benefits: rent allowances - mandatory payments000000000000000000000[x]00000000
Housing benefits: non-HRA rent rebates - mandatory payments000000000000000000000[x]00000000
Housing benefits: rent rebates to HRA tenants - mandatory payments000000000000000000000[x]00000000
Housing benefits: subsidy limitation transfers from HRA000000000000000000000[x]00000000
Contribution to the HRA re items shared by the whole community000000000000000000000[x]00000000
Parish precepts000000000000000000000000000000
Integrated Transport Authority levy000000000000000000000000000000
Waste Disposal Authority levy000000000000000000000000000000
London Pensions Fund Authority levy000000000000000000000[x]00000000
Other levies000000000000000000000[x]00000000
External Trading Accounts net surplus(-)/ deficit(+)000000000000000000000[x]00000000
Internal Trading Accounts net surplus(-)/ deficit(+)000000000000000000000[x]00000000
Adjustments to net current expenditure000000000000000000000[x]00000000
Appropriations to(+) / from(-) Accumulated Absences Account000000000000000000000[x]00000000
Net Current Expenditure12,2739,0248,74811,07912,10011,01412,0358,8979,19810,74513,38210,53011,46710,10911,17211,97014,84915,80817,92613,94314,501[x]17,63817,47616,00116,44018,87416,92716,05318,660
Capital charges included in External Trading Accounts (Line 34)000000000000000000000[x]00000000
Capital charges included in Internal Trading Accounts (Line 35)000000000000000000000[x]00000000
Interest payable and similar charges108108108108108108108108108909090727272656565000[x]0002780000
Interest receivable [note 3]00-560-74000-8900000-10000-6510-65100-706-5050000
Housing Revenue Account Income: Dwelling rents (gross) (RO4 line 101)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Income: Non-dwelling rents (gross) (RO4 line 102)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Income: Other income (RO4 Lines 103 - 111)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Income Total[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Expenditure: Repairs and maintenance (RO4 line 121)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Expenditure: Supervision and management (including CDC) (RO4 line 122)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Expenditure: Special services & rents, rates, taxes, and other charges (RO4 line 123 & line 124)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Expenditure: Other (RO4 lines 125-133)[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000
Housing Revenue Account Expenditure Total[x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x][x]000000000000

Notes the Department attaches to this authority's row: 2025-26 Q1: [r].

[r] The Department says: Revised (Timeseries; All LA_Data tabs)

The Department's description of each sheet

Each sheet's title:

  • Timeseries 2017-18 Q1
  • Timeseries 2017-18 Q2
  • Timeseries 2017-18 Q3
  • Timeseries 2018-19 Q1
  • Timeseries 2018-19 Q2
  • Timeseries 2018-19 Q3
  • Timeseries 2019-20 Q1
  • Timeseries 2019-20 Q2
  • Timeseries 2019-20 Q3
  • Timeseries 2020-21 Q1
  • Timeseries 2020-21 Q2
  • Timeseries 2020-21 Q3
  • Timeseries 2021-22 Q1
  • Timeseries 2021-22 Q2
  • Timeseries 2021-22 Q3
  • Timeseries 2022-23 Q1
  • Timeseries 2022-23 Q2
  • Timeseries 2022-23 Q3
  • Timeseries 2023-24 Q1
  • Timeseries 2023-24 Q2
  • Timeseries 2023-24 Q3
  • Timeseries 2023-24 Q4
  • Timeseries 2024-25 Q1
  • Timeseries 2024-25 Q2
  • Timeseries 2024-25 Q3
  • Timeseries 2024-25 Q4
  • Timeseries 2025-26 Q1
  • Timeseries 2025-26 Q2
  • Timeseries 2025-26 Q3
  • Timeseries 2025-26 Q4

The lines under each title, word for word. Where the wording is the same in several sheets it is given once, with the sheets it is in.

2017-18 Q1; 2017-18 Q2; 2017-18 Q3; 2018-19 Q1; 2018-19 Q2; 2018-19 Q3; 2019-20 Q1; 2019-20 Q2; 2019-20 Q3; 2020-21 Q1; 2020-21 Q2; 2020-21 Q3; 2021-22 Q1; 2021-22 Q2; 2021-22 Q3; 2022-23 Q1; 2022-23 Q2; 2022-23 Q3; 2023-24 Q1; 2023-24 Q2; 2023-24 Q3; 2023-24 Q4; 2024-25 Q1; 2024-25 Q2; 2024-25 Q3; 2024-25 Q4; 2025-26 Q1; 2025-26 Q2; 2025-26 Q3; 2025-26 Q4

This worksheet contains one table. Data in this woksheet is reported in thousands of pounds (£ thousand).

Source: QRU1-QRU3 returns

This table also contains notes in column C and corresponding explanations can be found in the Notes worksheet. A blank cell in this column represents that there are no notes associated with the data in that row.

Row 7 contains unique identifiers which are used to populate the local authority dropdown table.